Eastern Coal Fields Ltd-ECL has published Hiring Of Hemm For Extraction And Transportation Of 5 . 67 L . Te Of Coal Removal And Transportation Of 40 . 34 L . Cum Of Ob And Re Handling Of 2 . 09 L . Cum Ob At Badjna Oc Patch Of Mugma Area. Submission Date for this Tender is 18-08-2020. Earth Moving Machinery Tenders in Badjna OC Patch Mugma Area Jharkhand. Bidders can get complete Tender details and download the document.
Name of Work / NIT No.: | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1 | Item Description/ Heading | |||
2 | 1.01 | Excavation and loading in all kinds of soil including mixed soil, mixed hard soil i.e. clay/ soil mixed with pebble., moorum, hard moorum , soil mixed with laterite/stone boulders etc. ) at any depth by mechanical means including pumping out water & discharging the same to the nearest drainage system and removal of mud and slurry as required, transporting and unloading mechanically and disposed off by either (a) dumping outside the working zone in proper manner on the land Arranged by the colliery or (b) directly back filling of the excavated area in proper layer or (c) filling of subsided area / voids in the adjoining area outside the working zone in operation or as per direction of colliery official in proper gradient including dozing, the job involves making access trench / haul road as required for excavation operation and for transportation of excavated materials etc. all complete as per direction of Project Officer/ Agent. \n( Payment shall be made for finished work on the basis of pre-work and post-work level section measurement of excavation. Measurement is to be certified by Colliery Surveyor , Manager, Project Officer/ Agent. Joint check measurement on quarterly basis shall be done by Area authority, contractor and ECL HQ team)\nCarriage lead 0-1 KM. | item1 | 300000 | Cum |
3 | 1.02 | Excavation in OB in all kinds of soil including mixed soil, mixed hard soil i.e. clay/ soil mixed with pebble., moorum, hard moorum, soil mixed with laterite /stone boulders etc. and rock, soft or hard at any depth by mechanical means including drilling, using suitable blast hole drilling machine, Charging and blasting ( blasting shall be done by Deptt. free of cost. Supply of explosives, detonators & related materials will be made available by ECL and the services of statutory supervisory personnel as required for the work will be provided as and when considered necessary by the management free of cost ) as required at any depth and loading by mechanical means including pumping out water & discharging the same to the nearest Drainage system & removal of slushy earth and slurry as required, transporting and unloading mechanically and disposed off either by (a) dumping outside the working zone in proper manner on the land arranged by the colliery or (b) directly back filling of the excavated area in proper layer or (c) filling of subsided area / voids in the adjoining area outside the working zone in operation or as perdirection of colliery official in proper gradient including dozing, the job involves making access trench / haul road as required for excavation operation and for transportation of excavated materials etc. all complete as per direction of Project Officer/ Agent. (Payment shall be made for finished work on the basis of pre-work and post-work level section measurement of excavation. All measurements of O.B. removed will have to be certified by Colliery Surveyor , Manager and Project Officer / Agent. Joint check measurement on quarterly basis shall be done by Area authority, contractor and ECL HQ team). Carriage lead 0-1 KM. | item2 | 2.76e+06 | Cum |
4 | 1.03 | Excavation in OB in all kinds of soil including mixed soil, mixed hard soil i.e. clay/ soil mixed with pebble., moorum, hard moorum, soil mixed with laterite /stone boulders etc. and rock, soft or hard at any depth by mechanical means including drilling, using suitable blast hole drilling machine, Charging and blasting ( blasting shall be done by Deptt. free of cost. Supply of explosives, detonators & related materials will be made available by ECL and the services of statutory supervisory personnel as required for the work will be provided as and when considered necessary by the management free of cost ) as required at any depth and loading by mechanical means including pumping out water & discharging the same to the nearest Drainage system & removal of slushy earth and slurry as required, transporting and unloading mechanically and disposed off either by (a) dumping outside the working zone in proper manner on the land arranged by the colliery or (b) directly back filling of the excavated area in proper layer or (c) filling of subsided area / voids in the adjoining area outside the working zone in operation or as perdirection of colliery official in proper gradient including dozing, the job involves making access trench / haul road as required for excavation operation and for transportation of excavated materials etc. all complete as per direction of Project Officer/ Agent. (Payment shall be made for finished work on the basis of pre-work and post-work level section measurement of excavation. All measurements of O.B. removed will have to be certified by Colliery Surveyor , Manager and Project Officer / Agent. Joint check measurement on quarterly basis shall be done by Area authority, contractor and ECL HQ team). Carriage lead 1-2 KM. | item3 | 974000 | Cum |
5 | 1.04 | (a)Wining / extraction of running of mines coal in benches from available coal seam at any depth including using suitable blast hole drilling machine, charging and blasting ( blasting shall be done by Deptt. free of cost. Supply of explosives, detonators & related materials will be made available by ECL and the services of statutory supervisory personnel as required for the work will be provided as and when considered necessary by the management free of cost ) (b) loading of coal free from extraneous materials into dumpers / tippers mechanically at coal face , including pumping out water & discharging the same to the nearest drainage system, removal of slushy earth / slurry and removal / segregating / picking of unwanted band stone / extraneous materials and (c) Transporting the same to Rly.Siding, unloading and stacking in regular stacks. The job also involves making and maintenance of access trench / haul roads required for extraction and transportation of coal including water spraying stock yard management by dozer etc. The entire operation of extraction & transportation of coal is to be carried out as per direction of Project Officer / Agent. (Colliery authority will establish a permanent benchmark at the quarry site and surface contouring at suitable intervals in consultation with Area authority, Hq. Survey Deptt.. All measurement are to be carried out in relation to the benchmark.) (Payment is to be made on the basis of the measurement of in-situ volume solid converted to weight by conversion factor specific to the seam coal subject to quarterly reconciliation of coal received by weight at despatch point as specified. Measurement is to be certified by Colliery Surveyor, Manager, Project Officer / Agent . Joint check measurement on quarterly basis shall be done by Area authority, contractor and ECL HQ team). (a)Carriage lead exceeding 8 km but not exceeding 9 kms.** | item4 | 567000 | Te |
6 | 1.05 | Crushing of coal into (-) 100 mm size (all dimensions) by mobile crusher including feeding of coal to mobile crusher and providing and installing suitable and matching crushing arrangement with all infrastructure.. The element includes operation and maintenance of the crushing arrangement also. (Electricity and water will be supplied free of cost) | item5 | 567000 | Te |
7 | 1.06 | Loading of coal into wagons by pay loader | item6 | 567000 | Te |
8 | 1.07 | Re-handling from the existing dumped overburden obtained by Excavation of the mine (all kinds of Soil & Rock) operation, transporting mechanically to site of filling including loading, unloading & spreading the same in proper manner as required all by mechanical means, top surface neatly dressed including making road as required for this job for transportation etc. complete in all respect as per direction of Project Officer / Agent. (Payment shall be made for lower of the assessed quantity on the basis of pre-work and post-work level section measurement of filling zone/cutting zone. Measurement is to be certified by Colliery Surveyor, Manager, Project Officer / Agent. Joint check measurement on quarterly basis shall be done by Area authority, contractor and ECL HQ team). Carriage lead 0-1 KM. | item7 | 209000 | Cum |
9 | 1.08 | Pumping out accumulated water from water logged area in devloped pillers by using high capacity suitable pumps , to be supplied and installed by tenderer and discharging the same to the nearest drainage system as per direction of Project Officer/Agent. (Payment to be made on quantity of water calculated on the basis of initial water level and final level, no consideration being made for any water that may have been added through percolation or otherwise). | item8 | 9e+07 | Gallon |
10 | 2 | Total impact of GST for the purpose of CTC | BI01010001010000000000000515BI0100001143 | 1 | Nos |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail