Defence Statutory Bodies & Commissions/Committees Closing in 0 days TDR #24992552

Job Work Job Order For Outsourcing Services For Maint And Operation Of Water Supply Installation / Dg Set At Sevoke Road Mil Stn Under Ge Sevoke Road

Issued by Statutory Bodies & Commissions/Committees · GE SEVOKE RD, West Bengal
Tender Value
1.78 Lakhs
Estimated cost
Bid Submission
10 Aug 2020
0 days left
EMD
Ref. Documents
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
GE SEVOKE RD → West Bengal
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Job Work Job Order For Outsourcing Services For Maint And Operation Of Water Supply Installation / Dg Set At Sevoke Road Mil Stn Under Ge Sevoke Road , Providing Services For Comprehensive Maintenance And Operation Of Pump House With Dg Sets , Chlorination Pump Of Any Make And Capacity In Three Shifts Of 8 Hours Each Shift By Employing One Fgm ( Semi-Skilled ) Per Shift Including Operation Of Following And At Following Locations And At Following Locations :- ( A ) Cleaning Of Entire Area Pump House And Cutting Of Grass From The Roots And Keeping The Premises ( Area Of The Instalation ) In Hygienic Condition . ( B ) Duty Roster Shall Be Prepared In Advance For Each Month Duly Signed By The Contractor And Engineer-In-Charge And Display In Each Pump House Showing The Person On Duty In Each Shift Including The Reliever For Off Duty As Per Labour Act . ( C ) Operation And Maint Of Chlorine Dozing Pump To Ensure Super Chlorination Of Water . ( D ) Operation Of Dg Set In Case Of Failure Of Elect Supply . ( E ) Operation And Maint Of Iron Removal Plant And Compressor Including Back Washing To Get Clean Water . Locations :- ( A ) Dns Pump House , 3/3 Gr Pump House And Sewage Pump House , Sevoke Mil Stn - Each Shift - 87 ( 03 Shifts Per Day For 29 Days ) ( B ) Pump House No 16 At Sevoke Road Mil Stn . Each Shift -58 ( 02 Shifts Per Day For 29 Days ) ( C ) Pump House No 17 At Sevoke Road Mil Stn . Each Shift - 29 ( 01 Shift Per Day For 29 Days ) ( D ) Pump House No 04 , Sevoke Road Mil Stn . Each Shift - 29 ( 01 Shift Per Day For 29 Days ) ( E ) Pump House No 3 Sevoke Road Mil Stn . Each Shift - 29 ( 01 Shift Per Day For 29 Days ) ( Total No Of Shifts ( 03+02+01+01+01 =08 Shifts Per Day ) I . E . 08 Shifts X 29 Days = 232 Shifts ) Note :- ( A ) Water Residual Chlorine Content Test To Be Done As Per Direction Of Age . ( B ) All Safety And Cleaning Equipment ( I . E . Grass Cutting Machine , Cotton Cloth , Cleaning Chemical Broom Etc . ) To Be Provided By The Contractor . ( C ) Minimum Requirement Of Semi Skilled Experienced Manpower Required For Providing M & O Services As Shift Wise . No Extra Claim Will Be Admitted By The Department For Employing And Additional Man Power . However , Necessary Prise Adjustment On ( - ) Minus Side Will Be Admitted By The Employment Of Man Power At Any Particular Day / Duration Falls Below The Minimum Requirement Based . Such Adjustments Will Be Based On Minimum Fair Wages Or Quoted Rate Which Ever Is Higher . Notes . ( A ) Minimum Requirement Of Fgm Required For Providing M&O Services As Assessed For Employing And Additional Manpower , However , Necessary Price Adjustment On ( - ) Minus Side Will Be Admitted By The Employment On Manpower At Any Particular Day / Duration Falls Below The Minimum Requirement Based . Such Adjustments Will Be Based On Minimum Fair Wages Or Quoted Rate Which Ever Is Higher . ( B ) Before Commencement Of Work , List Of All Employees / Staff Is To Be Submitted To Ge Alongwith Qualification / Experience , Details And Id Proofs . ( C ) Payment To All Staff / Employees For Rendering Services Is To Be Made As Minimum Wagdes Act At Rates Promulgated By Central / State Govt Which Ever Is Higher Through Bank Account Of Employees . ( D ) At The Time Of Submission Of Bill , Proof In Respect Of Payment Made To The Employees Alongwith Epf/Pf Details Is Also To Be Submitted . ( E ) Duty Roster And Attendance Register To Be Maintained . ( F ) . Contractor Should Quote Rates As Per Prevailing Minimum Wages As Applicabel And Considering All Statutory Payment As Per Govt Rules In Existing Failing Which Tender Will Be Treated As Non Bonafied And Such Bidder Will Be Debarred For Future Quoting Of Tender For Next Six Months .

Corrigendum

Sr No Corrigendum Date Corrigendum Type New Submission Date
1 03-Aug-2020 Bid Auto Extn Corrigendum Bid Auto Extn Corrigendum 10-Aug-2020

BOQ

Name of Work: Job Work FOR OUTSOURCING SERVICES FOR MAINT AND OPERATION OF WATER SUPPLY INSTALLATION / DG SETS AT SEVOKE ROAD MIL STN UNDER GE SEVOKE ROAD
Item DescriptionItem Code / MakeQuantityUnits
1Providing services for comprehensive maintenance and operation of pump house with DG sets, chlorination pump of any make and capacity in three shifts of 8 hours each shift by employing one FGM (semi-skilled) per shift including operation of following and at following locations and at following locations :- \n(a) Cleaning of entire area pump house and cutting of grass from the roots and keeping the premises (area of the instalation) in hygienic condition. \n(b) Duty roster shall be prepared in advance for each month duly signed by the contractor and Engineer-in-Charge and display in each pump house showing the person on duty in each shift including the reliever for 'Off' duty as per Labour Act. \n(c) Operation and maint of chlorine dozing pump to ensure super chlorination of water. \n(d) Operation of DG set in case of failure of Elect Supply. \n(e) Operation and maint of iron removal plant and compressor including back washing to get clean water. \nLocations :-\n(a) DNS pump house, 3/3 GR Pump House and Sewage Pump House, Sevoke Mil Stn - Each Shift - 87 (03 Shifts per day for 29 days)\n(b) Pump House No 16 at Sevoke Road Mil Stn. Each Shift -58 (02 Shifts per day for 29 days)\n(c) Pump House No 17 at Sevoke Road Mil Stn. Each Shift - 29 (01 Shift per day for 29 days)\n(d) Pump House No 04, Sevoke Road Mil Stn . Each Shift - 29 (01 Shift per day for 29 days)\n(e) Pump House No 3 Sevoke Road Mil Stn. Each Shift - 29 (01 Shift per day for 29 days)\n (TOTAL NO OF SHIFTS (03+02+01+01+01 =08 Shifts per day) i.e. 08 Shifts x 29 days = 232 Shifts)\nNote :-\n(a) Water residual chlorine content test to be done as per direction of AGE. \n(b) All safety and cleaning equipment (i.e. grass cutting machine, cotton cloth, cleaning chemical broom etc.) to be provided by the contractor. \n(c) Minimum requirement of semi skilled experienced manpower required for providing M & O services as Shift Wise. No extra claim will be admitted by the department for employing and additional man power. However, necessary prise adjustment on (-) minus side will be admitted by the employment of man power at any particular day / duration falls below the minimum requirement based. Such adjustments will be based on minimum fair wages or quoted rate which ever is higher. \nNotes .\n(a) Minimum requirement of FGM required for providing M&O services as assessed for employing and additional manpower, However, necessary price adjustment on (-) minus side will be admitted by the employment on manpower at any particular day / duration falls below the minimum requirement based. Such adjustments will be based on minimum fair wages or quoted rate which ever is higher. \n(b) Before commencement of work, list of all employees / staff is to be submitted to GE alongwith qualification / experience, details and ID proofs. \n(c) Payment to all staff / employees for rendering services is to be made as minimum wagdes act at rates promulgated by Central / State Govt which ever is higher through bank account of employees. \n(d) At the time of submission of bill, proof in respect of payment made to the employees alongwith EPF/PF details is also to be submitted. \n(e) Duty roster and attendance register to be maintained.\n(f). Contractor should quote rates as per prevailing minimum wages as applicabel and considering all statutory payment as per Govt Rules in existing failing which tender will be treated as non bonafied and such bidder will be debarred for future quoting of tender for next six months.Item 1232EACH SHIFT OF 8 HOURS

AI Tender Summary

OUR REF NO 24992552
AUTHORITY Statutory Bodies & Commissions/Committees
TENDER VALUE 1.78 Lakhs
LAST DATE 10-08-2020
Authority
Authority Name Military Engineer Services
Work Description Job Work Job Order For Outsourcing Services For Maint And Operation Of Water Supply Installation / Dg Set At Sevoke Road Mil Stn Under Ge Sevoke Road , Providing Services For Comprehensive Maintenance And Operation Of Pump House With Dg Sets , Chlorination Pump Of Any Make And Capacity In Three Shifts Of 8 Hours Each Shift By Employing One Fgm ( Semi-Skilled ) Per Shift Including Operation Of Following And At Following Locations And At Following Locations :- ( A ) Cleaning Of Entire Area Pump House And Cutting Of Grass From The Roots And Keeping The Premises ( Area Of The Instalation ) In Hygienic Condition . ( B ) Duty Roster Shall Be Prepared In Advance For Each Month Duly Signed By The Contractor And Engineer-In-Charge And Display In Each Pump House Showing The Person On Duty In Each Shift Including The Reliever For Off Duty As Per Labour Act . ( C ) Operation And Maint Of Chlorine Dozing Pump To Ensure Super Chlorination Of Water . ( D ) Operation Of Dg Set In Case Of Failure Of Elect Supply . ( E ) Operation And Maint Of Iron Removal Plant And Compressor Including Back Washing To Get Clean Water . Locations :- ( A ) Dns Pump House , 3/3 Gr Pump House And Sewage Pump House , Sevoke Mil Stn - Each Shift - 87 ( 03 Shifts Per Day For 29 Days ) ( B ) Pump House No 16 At Sevoke Road Mil Stn . Each Shift -58 ( 02 Shifts Per Day For 29 Days ) ( C ) Pump House No 17 At Sevoke Road Mil Stn . Each Shift - 29 ( 01 Shift Per Day For 29 Days ) ( D ) Pump House No 04 , Sevoke Road Mil Stn . Each Shift - 29 ( 01 Shift Per Day For 29 Days ) ( E ) Pump House No 3 Sevoke Road Mil Stn . Each Shift - 29 ( 01 Shift Per Day For 29 Days ) ( Total No Of Shifts ( 03+02+01+01+01 =08 Shifts Per Day ) I . E . 08 Shifts X 29 Days = 232 Shifts ) Note :- ( A ) Water Residual Chlorine Content Test To Be Done As Per Direction Of Age . ( B ) All Safety And Cleaning Equipment ( I . E . Grass Cutting Machine , Cotton Cloth , Cleaning Chemical Broom Etc . ) To Be Provided By The Contractor . ( C ) Minimum Requirement Of Semi Skilled Experienced Manpower Required For Providing M & O Services As Shift Wise . No Extra Claim Will Be Admitted By The Department For Employing And Additional Man Power . However , Necessary Prise Adjustment On ( - ) Minus Side Will Be Admitted By The Employment Of Man Power At Any Particular Day / Duration Falls Below The Minimum Requirement Based . Such Adjustments Will Be Based On Minimum Fair Wages Or Quoted Rate Which Ever Is Higher . Notes . ( A ) Minimum Requirement Of Fgm Required For Providing M&O Services As Assessed For Employing And Additional Manpower , However , Necessary Price Adjustment On ( - ) Minus Side Will Be Admitted By The Employment On Manpower At Any Particular Day / Duration Falls Below The Minimum Requirement Based . Such Adjustments Will Be Based On Minimum Fair Wages Or Quoted Rate Which Ever Is Higher . ( B ) Before Commencement Of Work , List Of All Employees / Staff Is To Be Submitted To Ge Alongwith Qualification / Experience , Details And Id Proofs . ( C ) Payment To All Staff / Employees For Rendering Services Is To Be Made As Minimum Wagdes Act At Rates Promulgated By Central / State Govt Which Ever Is Higher Through Bank Account Of Employees . ( D ) At The Time Of Submission Of Bill , Proof In Respect Of Payment Made To The Employees Alongwith Epf/Pf Details Is Also To Be Submitted . ( E ) Duty Roster And Attendance Register To Be Maintained . ( F ) . Contractor Should Quote Rates As Per Prevailing Minimum Wages As Applicabel And Considering All Statutory Payment As Per Govt Rules In Existing Failing Which Tender Will Be Treated As Non Bonafied And Such Bidder Will Be Debarred For Future Quoting Of Tender For Next Six Months .
Basic Detail
Tender No 3003/EQ/JOB/108/E3
Bidding Type Tender
Location
City GE SEVOKE RD
State West Bengal
Key Dates
Publish Date 03 Aug 2020
Submission Date 10 Aug 2020
Open Date 11 Aug 2020
Finance
Tender Value 1.78 Lakhs
Tender Fee Ref. Documents
EMD Ref. Documents
Exemption Not Available
Document List
Tendernotice_1.pdf
8E6BE073-667A-409F-B5F8-C3A733BFE32F.html
Tendernotice_2.pdf
BOQ_406120.xls

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Aug 03, 2020
11:30 IST

Tender Published

Tender notice published.

Completed
Aug 10, 2020
18:00 IST

Corrigendum-1 Issued

Clarifications on tender conditions and amendments issued.

Completed
Aug 10, 2020
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Aug 11, 2020

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
pdf

Tendernotice_1.pdf

html

8E6BE073-667A-409F-B5F8-C3A733BFE32F.html

pdf

Tendernotice_2.pdf

xls

BOQ_406120.xls

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders