Transportation Of Key Construction Materials- Bitumen/Asphalt And Iron & Steel, Cement, Hard Coke Etc. For Various Destinations During The Financial Year 2020-21
Tender Overview
Project Description
Transportation of Key construction Materials- Bitumen/Asphalt and Iron & Steel, Cement, Hard Coke etc. For various destinations during the financial year 2020-21
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 10-Aug-2020 | Extension | Date | 20-Aug-2020 |
| 2 | 20-Aug-2020 | extension | Date | 28-Aug-2020 |
BOQ
| Name of Work: Transportation of Key construction Materials- Bitumen/Asphalt and Iron & Steel, Cement, Hard Coke etc. For various destinations during the financial year 2020-21 | |||||
|---|---|---|---|---|---|
| Sl.No. | Item Description | Item Code / Make | Quantity | Units | |
| 1 | 1 | Transportation of Cement | |||
| 2 | 1.01 | Rate per Metric Ton of Cement Bags from RMD Digiana, Jammu to RMD Zainakote, Srinagar. (Inclusive of all taxes and Duties ) (Quantity is Tentative) | 100 | Metric Ton | |
| 3 | 1.02 | Rate per Metric Ton of Cement Bags from RMD ZAINAKOTE, Srinagar to RMD Anantnag (Inclusive of all taxes and Duties ) (Quantity is Tentative) | 100 | Metric Ton | |
| 4 | 1.03 | Rate per Metric Ton of Cement Bags from RMD ZAINAKOTE, Srinagar to RMD Kulgam (Inclusive of all taxes and Duties ) (Quantity is Tentative) | 100 | Metric Ton | |
| 5 | 1.04 | Rate per Metric Ton of Cement Bags from RMD ZAINAKOTE, Srinagar to RMD Pulwama (Inclusive of all taxes and Duties ) (Quantity is Tentative) | 100 | Metric Ton | |
| 6 | 1.05 | Rate per Metric Ton of Cement Bags from RMD ZAINAKOTE, Srinagar to RMD Shopian (Inclusive of all taxes and Duties ) (Quantity is Tentative) | 100 | Metric Ton | |
| 7 | 1.06 | Rate per Metric Ton of Cement Bags from RMD ZAINAKOTE, Srinagar to RMD Budgam (Inclusive of all taxes and Duties) (Quantity is Tentative) | 100 | Metric Ton | |
| 8 | 1.07 | Rate per Metric Ton of Cement Bags from RMD ZAINAKOTE, Srinagar to RMD Bandipora (Inclusive of all taxes and Duties ) (Quantity is Tentative) | 100 | Metric Ton | |
| 9 | 1.08 | Rate per Metric Ton of Cement Bags from RMD ZAINAKOTE, Srinagar to RMD Baramulla (Inclusive of all taxes and Duties ) (Quantity is Tentative) | 100 | Metric Ton | |
| 10 | 1.09 | Rate per Metric Ton of Cement Bags from RMD ZAINAKOTE, Srinagar to RMD Kupwara (Inclusive of all taxes and Duties ) (Quantity is Tentative) | 100 | Metric Ton | |
| 11 | 1.1 | Rate per Metric Ton of Cement Bags from RMD ZAINAKOTE, Srinagar to RMD Ganderbal (Inclusive of all taxes and Duties ) (Quantity is Tentative) | 100 | Metric Ton | |
| 12 | 1.11 | Rate per Metric Ton of Cement Bags from RMD ZAINAKOTE, Srinagar to RMD Kargil (Inclusive of all taxes and Duties ) (Quantity is Tentative) | 100 | Metric Ton | |
| 13 | 1.12 | Rate per Metric Ton of Cement Bags from RMD ZAINAKOTE, Srinagar to RMD Leh (Inclusive of all taxes and Duties ) (Quantity is Tentative) | 100 | Metric Ton | |
| 14 | 2 | Transportation of Bitumen ( Packed) | |||
| 15 | 2.01 | Rate per Metric Ton of Bitumen ( Packed) from RMD Digiana , Jammu to RMD Zainakote, Srinagar. (Inclusive of all taxes and Duties excluding Toll Tax) (Quantity is Tentative) | 100 | Metric Ton | |
| 16 | 2.02 | Rate per Metric Ton of Bitumen ( Packed) from RMD ZAINAKOTE, Srinagar to RMD Anantnag (Inclusive of all taxes and Duties excluding Toll Tax) (Quantity is Tentative) | 100 | Metric Ton | |
| 17 | 2.03 | Rate per Metric Ton of Bitumen ( Packed) from RMD ZAINAKOTE, Srinagar to RMD Kulgam (Inclusive of all taxes and Duties excluding Toll Tax) (Quantity is Tentative | 100 | Metric Ton | |
| 18 | 2.04 | Rate per Metric Ton of Bitumen ( Packed) from RMD ZAINAKOTE, Srinagar to RMD Pulwama (Inclusive of all taxes and Duties excluding Toll Tax) (Quantity is Tentative | 100 | Metric Ton | |
| 19 | 2.05 | Rate per Metric Ton of Bitumen ( Packed) from RMD ZAINAKOTE, Srinagar to RMD Shopian (Inclusive of all taxes and Duties excluding Toll Tax) (Quantity is Tentative) | 100 | Metric Ton | |
| 20 | 2.06 | Rate per Metric Ton of Bitumen ( Packed) from RMD ZAINAKOTE, Srinagar to RMD Budgam (Inclusive of all taxes and Duties excluding Toll Tax) (Quantity is Tentative) | 100 | Metric Ton | |
| 21 | 2.07 | Rate per Metric Ton of Bitumen ( Packed) from RMD ZAINAKOTE, Srinagar to RMD Bandipora (Inclusive of all taxes and Duties excluding Toll Tax) (Quantity is Tentative) | 100 | Metric Ton | |
| 22 | 2.08 | Rate per Metric Ton of Bitumen ( Packed) from RMD ZAINAKOTE, Srinagar to RMD Baramulla (Inclusive of all taxes and Duties excluding Toll Tax) (Quantity is Tentative) | 100 | Metric Ton | |
| 23 | 2.09 | Rate per Metric Ton of Bitumen ( Packed) from RMD ZAINAKOTE, Srinagar to RMD Kupwara (Inclusive of all taxes and Duties excluding Toll Tax) (Quantity is Tentative | 100 | Metric Ton | |
| 24 | 2.1 | Rate per Metric Ton of Bitumen ( Packed) from RMD ZAINAKOTE, Srinagar to RMD Ganderbal (Inclusive of all taxes and Duties excluding Toll Tax) (Quantity is Tentative) | 100 | Metric Ton | |
| 25 | 2.11 | Rate per Metric Ton of Bitumen ( Packed) from RMD ZAINAKOTE, Srinagar to RMD Kargil (Inclusive of all taxes and Duties excluding Toll Tax) (Quantity is Tentative) | 100 | Metric Ton | |
| 26 | 2.12 | Rate per Metric Ton of Bitumen ( Packed) from RMD ZAINAKOTE, Srinagar to RMD Leh (Inclusive of all taxes and Duties excluding Toll Tax) (Quantity is Tentative) | 100 | Metric Ton | |
| 27 | 3 | Transportation of Iron/Steel (Short Length ) | |||
| 28 | 3.01 | Rate per Metric Ton of Iron/Steel (Short Length) from RMD Digiana , Jammu to RMD Zainakote, Srinagar. (Inclusive of all taxes and Duties ) (Quantity is Tentative) | 100 | Metric Ton | |
| 29 | 3.02 | Rate per Metric Ton of Iron/Steel (Short Length ) from RMD ZAINAKOTE, Srinagar to RMD Anantnag (Inclusive of all taxes and Duties ) (Quantity is Tentative) | 100 | Metric Ton | |
| 30 | 3.03 | Rate per Metric Ton of Iron/Steel (Short Length from RMD ZAINAKOTE, Srinagar to RMD Kulgam (Inclusive of all taxes and Duties ) (Quantity is Tentative) | 100 | Metric Ton | |
| 31 | 3.04 | Rate per Metric Ton of Iron/Steel (Short Length ) from RMD ZAINAKOTE, Srinagar to RMD Pulwama (Inclusive of all taxes and Duties ) (Quantity is Tentative) | 100 | Metric Ton | |
| 32 | 3.05 | Rate per Metric Ton of Iron/Steel (Short Length) from RMD ZAINAKOTE, Srinagar to RMD Shopian (Inclusive of all taxes and Duties ) (Quantity is Tentative) | 100 | Metric Ton | |
| 33 | 3.06 | Rate per Metric Ton of Iron/Steel (Short Length ) from RMD ZAINAKOTE, Srinagar to RMD Budgam (Inclusive of all taxes and Duties ) (Quantity is Tentative) | 100 | Metric Ton | |
| 34 | 3.07 | Rate per Metric Ton of Iron/Steel (Short Length ) from RMD ZAINAKOTE, Srinagar to RMD Bandipora (Inclusive of all taxes and Duties ) (Quantity is Tentative) | 100 | Metric Ton | |
| 35 | 3.08 | Rate per Metric Ton of Iron/Steel (Short Length) from RMD ZAINAKOTE, Srinagar to RMD Baramulla (Inclusive of all taxes and Duties ) (Quantity is Tentative) | 100 | Metric Ton | |
| 36 | 3.09 | Rate per Metric Ton of Iron/Steel (Short Length ) from RMD ZAINAKOTE, Srinagar to RMD Kupwara (Inclusive of all taxes and Duties ) (Quantity is Tentative) | 100 | Metric Ton | |
| 37 | 3.1 | Rate per Metric Ton of Iron/Steel (Short Length ) from RMD ZAINAKOTE, Srinagar to RMD Ganderbal (Inclusive of all taxes and Duties ) (Quantity is Tentative) | 100 | Metric Ton | |
| 38 | 3.11 | Rate per Metric Ton of Iron/Steel (Short Length / Full Length) from RMD ZAINAKOTE, Srinagar to RMD Kargil (Inclusive of all taxes and Duties ) (Quantity is Tentative) | 100 | Metric Ton | |
| 39 | 3.12 | Rate per Metric Ton of Iron/Steel (Short Length ) from RMD ZAINAKOTE, Srinagar to RMD Leh (Inclusive of all taxes and Duties ) (Quantity is Tentative) | 100 | Metric Ton | |
| 40 | 3.13 | Rate per Metric Ton of Iron/Steel (Short Length) from CHANDIGARH to RMD ZAINAKOTE, Srinagar(Inclusive of all taxes and Duties ) (Quantity is Tentative) | 100 | Metric Ton | |
| 41 | 3.14 | Rate per Metric Ton of Iron/Steel (Short Length ) from LUDHIANA to RMD ZAINAKOTE, Srinagar(Inclusive of all taxes and Duties ) (Quantity is Tentative) | 100 | Metric Ton | |
| 42 | 3.15 | Rate per Metric Ton of Iron/Steel (Short Length) from GHAZIABAD to RMD ZAINAKOTE, Srinagar(Inclusive of all taxes and Duties ) (Quantity is Tentative) | 100 | Metric Ton | |
| 43 | 4 | Transportation of Iron/Steel ( Full Length) | |||
| 44 | 4.01 | Rate per Metric Ton of Iron/Steel ( Full Length) from RMD Digiana , Jammu to RMD Zainakote, Srinagar. (Inclusive of all taxes and Duties ) (Quantity is Tentative) | 100 | Metric Ton | |
| 45 | 4.02 | Rate per Metric Ton of Iron/Steel ( Full Length) from RMD ZAINAKOTE, Srinagar to RMD Anantnag (Inclusive of all taxes and Duties ) (Quantity is Tentative) | 100 | Metric Ton | |
| 46 | 4.03 | Rate per Metric Ton of Iron/Steel ( Full Length) from RMD ZAINAKOTE, Srinagar to RMD Kulgam (Inclusive of all taxes and Duties ) (Quantity is Tentative) | 100 | Metric Ton | |
| 47 | 4.04 | Rate per Metric Ton of Iron/Steel ( Full Length) from RMD ZAINAKOTE, Srinagar to RMD Pulwama (Inclusive of all taxes and Duties ) (Quantity is Tentative) | 100 | Metric Ton | |
| 48 | 4.05 | Rate per Metric Ton of Iron/Steel ( Full Length) from RMD ZAINAKOTE, Srinagar to RMD Shopian (Inclusive of all taxes and Duties ) (Quantity is Tentative) | 100 | Metric Ton | |
| 49 | 4.06 | Rate per Metric Ton of Iron/Steel ( Full Length) from RMD ZAINAKOTE, Srinagar to RMD Budgam (Inclusive of all taxes and Duties ) (Quantity is Tentative) | 100 | Metric Ton | |
| 50 | 4.07 | Rate per Metric Ton of Iron/Steel ( Full Length) from RMD ZAINAKOTE, Srinagar to RMD Bandipora (Inclusive of all taxes and Duties ) (Quantity is Tentative) | 100 | Metric Ton | |
| 51 | 4.08 | Rate per Metric Ton of Iron/Steel ( Full Length) from RMD ZAINAKOTE, Srinagar to RMD Baramulla (Inclusive of all taxes and Duties ) (Quantity is Tentative) | 100 | Metric Ton | |
| 52 | 4.09 | Rate per Metric Ton of Iron/Steel ( Full Length) from RMD ZAINAKOTE, Srinagar to RMD Kupwara (Inclusive of all taxes and Duties ) (Quantity is Tentative) | 100 | Metric Ton | |
| 53 | 4.1 | Rate per Metric Ton of Iron/Steel ( Full Length) from RMD ZAINAKOTE, Srinagar to RMD Ganderbal (Inclusive of all taxes and Duties ) (Quantity is Tentative) | 100 | Metric Ton | |
| 54 | 4.11 | Rate per Metric Ton of Iron/Steel ( Full Length) from RMD ZAINAKOTE, Srinagar to RMD Kargil (Inclusive of all taxes and Duties ) (Quantity is Tentative) | 100 | Metric Ton | |
| 55 | 4.12 | Rate per Metric Ton of Iron/Steel ( Full Length) from RMD ZAINAKOTE, Srinagar to RMD Leh (Inclusive of all taxes and Duties ) (Quantity is Tentative) | 100 | Metric Ton | |
| 56 | 4.13 | Rate per Metric Ton of Iron/Steel ( Full Length) from CHANDIGARH to RMD ZAINAKOTE, Srinagar(Inclusive of all taxes and Duties ) (Quantity is Tentative) | 100 | Metric Ton | |
| 57 | 4.14 | Rate per Metric Ton of Iron/Steel ( Full Length) from LUDHIANA to RMD ZAINAKOTE, Srinagar(Inclusive of all taxes and Duties ) (Quantity is Tentative) | 100 | Cum | |
| 58 | 4.15 | Rate per Metric Ton of Iron/Steel ( Full Length) from GHAZIABAD to RMD ZAINAKOTE, Srinagar(Inclusive of all taxes and Duties ) (Quantity is Tentative) | 100 | Metric Ton | |
| 59 | 5 | Transportation of Hard Coke | |||
| 60 | 5.01 | Rate per Metric Ton of Hard Coke from RMD Zainakote, Srinagar to RMD Anantnag. (Inclusive of all taxes and Duties excluding Toll Tax) (Quantity is Tentative) | 100 | Metric Ton | |
| 61 | 5.02 | Rate per Metric Ton of Hard Coke from RMD Zainakote, Srinagar to RMD Kulgam (Inclusive of all taxes and Duties excluding Toll Tax) (Quantity is Tentative) | 100 | Metric Ton | |
| 62 | 5.03 | Rate per Metric Ton of Hard Coke from RMD Zainakote, Srinagar to RMD Pulwama (Inclusive of all taxes and Duties excluding Toll Tax) (Quantity is Tentative) | 100 | Metric Ton | |
| 63 | 5.04 | Rate per Metric Ton of Hard Coke from RMD Zainakote, Srinagar to RMD Shopian (Inclusive of all taxes and Duties excluding Toll Tax) (Quantity is Tentative) | 100 | Metric Ton | |
| 64 | 5.05 | Rate per Metric Ton of Hard Coke from RMD Zainakote, Srinagar to RMD Budgam (Inclusive of all taxes and Duties excluding Toll Tax) (Quantity is Tentative) | 100 | Metric Ton | |
| 65 | 5.06 | Rate per Metric Ton of Hard Coke from RMD Zainakote, Srinagar to RMD Bandipora (Inclusive of all taxes and Duties excluding Toll Tax) (Quantity is Tentative) | 100 | Metric Ton | |
| 66 | 5.07 | Rate per Metric Ton of Hard Coke from RMD Zainakote, Srinagar to RMD Baramulla (Inclusive of all taxes and Duties excluding Toll Tax) (Quantity is Tentative) | 100 | Metric Ton | |
| 67 | 5.08 | Rate per Metric Ton of Hard Coke from RMD Zainakote, Srinagar to RMD Kupwara (Inclusive of all taxes and Duties excluding Toll Tax) (Quantity is Tentative) | 100 | Metric Ton | |
| 68 | 5.09 | Rate per Metric Ton of Hard Coke from RMD Zainakote, Srinagar to RMD Ganderbal (Inclusive of all taxes and Duties excluding Toll Tax) (Quantity is Tentative) | 100 | Metric Ton | |
| 69 | 5.1 | Rate per Metric Ton of Hard Coke from RMD Zainakote, Srinagar to RMD Leh (Inclusive of all taxes and Duties excluding Toll Tax) (Quantity is Tentative) | 100 | Metric Ton | |
| 70 | 5.11 | Rate per Metric Ton of Hard Coke from RMD Zainakote, Srinagar to RMD Kargil (Inclusive of all taxes and Duties excluding Toll Tax) (Quantity is Tentative) | 100 | Qtl | |
| 71 | 6 | Transportation of Bitumen/Asphalt in Drums | |||
| 72 | 6.01 | Rate per metric ton of Bitumen/Asphalt in drums transported from Indian Oil Corporation Depot at Jammu to SICOP Raw Material Depot at Zainakote Srinagar (including all applicable taxes and duties,but excluding Toll Tax) (Quantity is tentative) | 3000 | Metric Ton | |
| 73 | 6.02 | Rate per metric ton of Bitumen/Asphalt in drums transported from Indian Oil Corporation Refiniery at Panipat (Haryana) to SICOP Raw Material Depot at Zainakote Srinagar (including all applicable taxes and duties,but excluding Toll Tax) (Quantity is tentative) | 3000 | Metric Ton | |
| 74 | 6.03 | Rate per metric ton of Bitumen/Asphalt in drums transported from HPCL Sales Depot COD Srinagar to SICOP Raw Material Depot at Zainakote Srinagar (including all applicable taxes and duties ,but excluding Toll Tax) (Quantity is tentative) | 3000 | Metric Ton | |
| 75 | 6.04 | Rate per metric ton of Bitumen/Asphalt in drums transported from Indian Oil Corporation Refiniery at Mathura (Uttar Pradesh) to SICOP Raw Material Depot at Zainakote Srinagar (including all applicable taxes and duties ,but excluding Toll Tax) (Quantity is tentative) | 100 | Metric Ton |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-2 Issued
Clarifications on tender conditions and amendments issued.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents