| 1 | 2BHK Water Supply line | Standard specification | 77.23 | One cum | 132.40 | 10225.25 |
| Carting away the surplus excavated materials such as rock / earth the site to a suitable distance of about 3 Kms including loading, unloading, conveyance charges and dumping the carted material at the contractors cost labour charges, all leads and lifts, all other incidential and operational charges etc., complete. as directed by the H.M.W.S.&. S. Board Engineers. |
| 2 | 2BHK Water Supply line | Standard specification | 164.50 | One cum. | 34.90 | 5741.05 |
| Refilling the pipe line trenches with using excavated soils other than sand with standard specification including watering and tamping in layers of 225mm etc., complete to the finished item as directed by the H.M.W.S.&.S. Board Engineers. |
| 3 | 2BHK Water Supply line | Standard specification | 30.17 | One cum | 5948.00 | 179466.03 |
| Plain Cement Concrete (1:2:4) mix with 6mm to 20 mm guage hard granite machine crushed metal including cost and conveyance of all meterial to site, machine mixing of concrete, lifts, leads, from work laying in position, vibrating, compacting, curing, all labour charges, tools and plants and all other incidental and operational charges etc. complete as directed by departmental officers as directed by the H.M.W.S.&,S. Board Engineers. (For Road restoration).( for 150mm dia fixing of S/v) |
| 4 | 2BHK Water Supply line | Standard specification | 25.40 | One cum | 923.00 | 23446.51 |
| Supply delivery and filling of quarry dust (50% Rubbish 50% HBG Stone 2.36 mm) where ever required as directed by departmental officers including cost and conveyance stacking leveling watering tampering rolling all leads labour charges and other incidental and operational charghes etc. complete as directed by the HMWS&SB Engineers. |
| 5 | 2BHK Water Supply line | Standard Specification | 5.32 | One M.T | 1215.00 | 6463.80 |
| Conveyance of CI/DI pipes from the departmental stores to work site including loading, unloading and labour charges etc. complete as directed by the H.M.W.S.&.S. Board Engineers. (for 150mm dia) |
| 6 | 2BHK Water Supply line | Standard Specification | 12.50 | One Rmt. | 201.00 | 2512.50 |
| Supply, Laying, jointing and Redoing of of 1/2\" dia MDPE pipes including fitting cost and conveyance of all materials including all other incidental and operation charges etc., complete as directed by the HMWS&SB Engineer. |
| 7 | 2BHK Water Supply line | Standard Specification | 6.00 | One Each | 7411.00 | 44466.00 |
| Supply and delivery fixing of RCC Precast manhole chambers having the size of 36\"x21\" dia at top fixing in CC 1:4:8 Prop:along with FRC Cover and frame laying CC 1:2:4 prop: including cost of materials labour charges earth work curing conveyance etc., Complete as directed by the HMWS&SB Engineers |
| 8 | 2BHK Water Supply line | Standard Specification | 8.00 | One Each | 644.00 | 5152.00 |
| Jointing 300mm dia D.I. / C.I pipes and valves with D/F joints including cost of nuts, bolts, rubber insertion etc., including filling with water and testing to required pressure etc., complete as directed by the H.M.W.S.&.S. Board Engineers. |
| 9 | 2BHK Water Supply line | Standard Specification | 4.00 | One Each | 399.00 | 1596.00 |
| Jointing 150mm dia D.I. / C.I pipes and valves with D/F joints including cost of nuts, bolts, rubber insertion etc., including filling with water and testing to required pressure etc., complete as directed by the H.M.W.S.&.S. Board Engineers. |
| 10 | 2BHK Water Supply line | Standard Specification | 4.00 | One Each | 778.00 | 3112.00 |
| Labour charges for lowering and keeping in position 300mm dia D.I /C.I Sluice valves including cost and conveyance of all materials etc., complete as directed by the H.M.W.S.&.S. Board Engineers. |
| 11 | 2BHK Water Supply line | Standard Specification | 2.00 | One Each | 233.00 | 466.00 |
| Labour charges for lowering and keeping in position 150mm dia D.I. / C.I . Sluice valves including conveyance of all materials etc., complete as directed by the H.M.W.S.&.S. Board Engineers. |
| 12 | 2BHK Water Supply line | Standard Specification | 22.00 | One Each | 235.00 | 5170.00 |
| Jointing 300mm dia D.I. / C.I pipes with plain spigot and modified socket rubber gasket (tyton) joints including all sundries with water lead of 500 m and testing to the required pressure but excluding cost of rubber gaskets etc., complete as directed by the H.M.W.S.&.S. Board Engineers. |
| 13 | 2BHK Water Supply line | Standard Specification | 28.00 | One Each | 166.00 | 4648.00 |
| Jointing 150mm dia D.I. / C.I pipes with plain spigot and modified socket rubber gasket (tyton) joints including all sundries with water lead of 500 m and testing to the required pressure but excluding cost of rubber gaskets etc., complete as directed by the H.M.W.S.&.S. Board Engineers. |
| 14 | 2BHK Water Supply line | Standard Specification | 66.00 | One Rmt. | 202.00 | 13332.00 |
| Lowering the 300mm dia D.I /C.I (K7) S/S pipes and specials carefully into the ready made trenches and laying them true to alignment and gradient including all labour charges, all operational charges etc., but excluding conveyance of pipes from Board stores to work site etc., complete as directed by the H.M.W.S.&.S. Board Engineers. |
| 15 | 2BHK Water Supply line | Standard Specification | 90.00 | One Rmt. | 80.00 | 7200.00 |
| Lowering the 150mm dia D.I /C.I (K7) S/S pipes and specials carefully into the ready made trenches and laying them true to alignment and gradient including all labour charges, all operational charges etc., but excluding conveyance of pipes from Board stores to work site etc., complete as directed by the H.M.W.S.&.S. Board Engineers. |
| 16 | 2BHK Water Supply line | Standard specification | 6.00 | One Each | 418.00 | 2508.00 |
| Cutting of pipes carefully including all sundries and labour charges etc. complete as directed by the H.M.W.S.&.S. Board Engineers. |
| 17 | 2BHK Water Supply line | Standard specification | 2.00 | One Each | 7959.18 | 15918.36 |
| Manufacture, supply and delivery of 300mm dia x 300mm x 300mm dia Tee fabricated with 8mm thick M.S.plate including cost of MS plate, fabrication charges, painting with anti corrossive epoxy paint on both sides, transportation, labour charges etc. complete as directed by the H.M.W.S.&.S. Board Engineers. |
| 18 | 2BHK Water Supply line | Standard specification | 1.00 | One Each | 6669.79 | 6669.79 |
| Manufacture, supply and delivery of 300mm dia x 300mm x 150mm dia Tee fabricated with 8mm thick M.S.plate including cost of MS plate, fabrication charges, painting with anti corrossive epoxy paint on both sides, transportation, labour charges etc. complete as directed by the H.M.W.S.&.S. Board Engineers. |
| 19 | 2BHK Water Supply line | Standard specification | 5.00 | One Rmt. | 3778.64 | 18893.20 |
| Manufacture, supply and delivery of 300mm dia M S Pipe fabricated with 8mm thick M.S.plate including cost of MS plate, fabrication charges, painting with anti corrossive epoxy paint on both sides, transportation, labour charges etc. complete as directed by the H.M.W.S.&.S. Board Engineers. |
| 20 | 2BHK Water Supply line | Standard specification | 1.00 | One Each | 4992.28 | 4992.28 |
| Manufacture, supply and delivery of 300mm dia x 90º M S Bend fabricated with 8mm thick M.S.plate including cost of MS plate, fabrication charges, painting with anti corrossive epoxy paint on both sides, transportation, labour charges etc. complete as directed by the H.M.W.S.&.S. Board Engineers. |
| 21 | 2BHK Water Supply line | Standard specification | 3.00 | One Each | 1756.40 | 5269.20 |
| Manufacture, supply and delivery of 350mm dia M S coller to suit 300mm dia pipe fabricated with 8mm thick M.S.plate including cost of MS plate, fabrication charges, painting with anti corrossive epoxy paint on both sides, transportation, labour charges etc. complete as directed by the H.M.W.S.&.S. Board Engineers. |
| 22 | 2BHK Water Supply line | Standard specification | 178.32 | One cum | 343.00 | 61163.76 |
| Earth work excavation in Loamy and clayey soils, red earth and ordainary gravel and hard gravelly soils soft disintegrated rock etc. as directed by departmental officers, including leads and lifts, all incidental and operationals charges etc. and depositing the same on bank with an initial lead of 10 Mts. and excluding dewatering etc. complete as directed by the H.M.W.S.&.S. Board Engineers. (For pipeline trenches ). |
| 23 | 2BHK Water Supply line | Standard specification | 21.69 | One sqm. | 1342.00 | 29107.98 |
| Cutting of BT road with 75 mm thick including labour charges all leads and other incidental and operational charges tool and plants etc complete for pipe line trenches as directed by the HMWS&SB Engineers. |
| 24 | 2BHK Water Supply line | Standard specification | 19.16 | One cum | 2793.00 | 53513.88 |
| Cutting of open CC road surface including labour charges, all leads and other incidental and operational charges tool and plants etc complete for pipe line trenches as directed by the HMWS&SB Engineers. |