| 1 | 1 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness including all labour, hire charges of all machineries etc., complete.by Mechanical means in area of light jungle. as per the direction of the Engineer In Charge of the work. | 1 | 1.62 | Hect |
|---|
| 2 | 2 | Clearance of land slides in soil and ordinary rock by a bull-dozer and disposal of the same on the valley side, including cost of all labour, hire charges of machinery, loading, unloading, lead, lift etc., complete.by Mechanical means in area of light jungle. as per the direction of the Engineer In Charge of the work. | 1.1 | 503.4 | Cum |
|---|
| 3 | 3 | Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 in layers not exceeding 250mm thick and compacting it by mechanical means after adding water to its OMC, so as to achieve 97% compaction of maximum dry density and finish the surface to the required camber, grade and cross section etc., spreading by Dozer, grading by motor grader, consolidation by vibratory road roller and carriage by tipper complete within a lead 1 Km, all lifts, loading, unloading, all labour, hire charges of machinery etc., complete.by Mechanical means in area of light jungle. as per the direction of the Engineer In Charge of the work. | 1.2 | 450 | Cum |
|---|
| 4 | 4 | Removel of Earth from choked hill side/other drain and disposing it on the valley side manually including cost of all labour,lead,lift etc., complete.by Mechanical means in area of light jungle. as per the direction of the Engineer In Charge of the work. | 1.3 | 5400 | Rmtr |
|---|
| 5 | 5 | Filling of Pot-holes and Patch repairs with Bituminous concrete 40mm thick Removel of all failed material, trimming of completed excavation to provide firm vertical faces,cleaning of surface painting of tack coat on the sides and base of the excavation as per clause 503 back filling the pot-holes with bituminous material as per clause 509 compacting trimming and finishing the surface to form asmooth continuos surface all as per clause 3004.2 including cost of all materials, labour,hire charges of machinary,lead,lift,loading,unloading,stacking ,transporting etc complete except lead for bitumen and emulsion Grading II material etc., complete.by Mechanical means in area of light jungle. as per the direction of the Engineer In Charge of the work. | 1.4 | 618.75 | Sqm |
|---|