| 1 | 1 | COST OF GEO physical investigation | | 1 | Each |
|---|
| 2 | 2 | (i) from 0 to 50mm below G/L | | 50 | P/M |
|---|
| 3 | 3 | (ii) from 50 to 275m onward | | 250 | P/M |
|---|
| 4 | 4 | Supplying all tools materilas and lowring of 200mm dia M.S.E.R.S casing pipe 6mm thick in wall etc. do…………do…as per E/I | | 24 | P/M |
|---|
| 5 | 5 | Supplying all materilas labors tools and equipments for fitting and fixing MS cap etc.do…………do………. As per E/I | | 1 | each |
|---|
| 6 | 6 | Earth work in excavation in foundation trenches in hard soil (Vide classification soil item B) and disposal of excavated earth as obtained to a distance up to 50 Mtr including all lifts, leveling, ramming the foundation trenches, removing roots of trees, shrubs all complete as per approved design, specification and direction of E/I \n4x 1.00x 1.00x 1.80= 7.2m3\n | | 7.2 | per m3 |
|---|
| 7 | 7 | Providing coarse clean sand in filling in fundation trenches or in plinth including ramming and watering in layers not exceeding 15mm thick with all leads and lifts includiing cost of all materials, labour, royality and taxes all complete as per building specification and direction of E/I. \n4x1.00x1.00x0.1= 0.4 M3\n2.1x2.1x0.1= 0.44 m3 | | 0.84 | M3 |
|---|
| 8 | 8 | Providing designation 75 A one brick flat soling joints filled with local sand inculding cost of watering taxes royalty all complete as per building specification and direction of E/E \n4x1.00x1.00= 4.00 M2\n2.10x2.10 = 4.41 M2\n = 8.41 M2 | | 8.41 | per m2 |
|---|
| 9 | 9 | Providing P.C.C M-150 with nominal mix of (1:2:4) in foundation with approved quality of stone chips 50mm to 25mm size graded and clean coarse sand of F.M. 2.5 to 3 including sereening, shuttering, mixing cement concrete in mixer and placing in position, vibrating, striking, curing, taxes and roalty all complete as per building specification and idrection of E/I. \n4x1.00x1.00x0.1= 0.4 M3 | | 0.4 | M3 |
|---|
| 10 | 10 | Providing R.C.C. M-200 with nominal mix of (1:1.5:3) in Foundation etc………….as per direction of E./I \n4x1.00x1.00x0.15= = 0.60 m3\n4x {(1.00+0.35/2) x (1.00+0.35/2)} x 0.375 = 0.683 m3\n = 1.283 m3 | | 1.283 | M3 |
|---|
| 11 | 11 | Providing R.C.C. M-200 with nominal mix of (1:1.5:3) in Column etc………….as per direction of E./I.\n 4x0.25x0.25x8.80= 2.20 M3\nDeduction 4x0.25x0.25x25 = 0.06 M3\n 4x0.25x0.25x0.30= 0.07 M3\n 4x0.25x0.25x0.15= 0.04 M3\nNet 2.2-0.17 = 2.03 M3 | | 2.03 | M3 |
|---|
| 12 | 12 | Providing R.C.C. M-200 with nominal mix of (1:1.5:3) in Beam etc………….as per direction of E./I.\nTie Beam 4x2.35x0.25x0.25= 0.588 M3 \nBracing Beam 4x2.35x0.25x0.25= 0.588M3\nBottom Beam 4x2.35x0.25x0.30= 0.70 M3\nCross Beam 2x2.60x0.25x0.25= 0.325 M3\n = 2.20 M3\n | | 2.2 | M3 |
|---|
| 13 | 13 | Providing R.C.C. M-200 with nominal mix of (1:1.5:3) in Roof Slab etc………….as per direction of E/I.\n 1x3.20x3.20x0.15= 1.54 M3\nLanding 2x1.00x1.00x0.15= 0.30 M3\nRCC Post 8x1.00x0.15x0.15= 0.18 M3\n = 2.02 M3 | | 2.02 | M3 |
|---|
| 14 | 14 | Providing Designation75 A brick work in C.M (1:4) in foundation and plinth do………..do E./I.\n 12.30x0.125x1.5 = 2.31 M3\nDeduction 1.00x1.5x0.125 = 0.187 M3\n = 2.123 M3 | | 2.123 | M3 |
|---|
| 15 | 15 | Providing 12 mm thick cement plaster (1:34) with clean coarse sand etc……………..do do…………….E/I.\nParapet 12.80x1.625 = 20.80 M2\n 12.50x1.50 = 18.82 M2\nColumn 4x1.00x8.80 = 35.20 M2\nBracing 2x4x2.35x1.00 = 18.80 M2\nCross Beam 2x2.10x0.75 = 3.15 M2\nCeiling 3.5x3.50 = 12.50 M2\nLanding 2x1.30x1.30 = 3.38 M2\nRCC Post 8x0.60x1.00 = 4.80 M2 \n = 116.78 M2\nNet P/A 116.78-1.00x1.50x2 = 116.78-3.00\n = 113.78 M2 | | 113.78 | M2 |
|---|
| 16 | 16 | Providing two coat of snowcem over new surface of approved colour etc. do.do..E/I.\n | | 113.08 | M2 |
|---|
| 17 | 17 | Providing MS Reinforcement in RCC work\n7.533 M3 x 1.5% x 7.85 = 0.887 MT | | 0.887 | MT |
|---|
| 18 | 18 | Providing M.S. Ladder | | 7.5 | Mtr |
|---|
| 19 | 19 | S/F/F 20 mm dia G.I. pipe for ralling | | 14.5 | M |
|---|
| 20 | 20 | Providing designation 75 A brick work in cement mortar (1:6) in foundation and plinth with approved quality of clean coarse sand of F.m2 t 2.5 including providing 10mm thick mortar joints, cost of screeining materials raking out joint to 15mm depth, curing, taxes and royality all complete as per building specification and direction of E/I. \nE/I. 4x2.10x0.3x0.25 =063 M3 | | 0.63 | M3 |
|---|
| 21 | 21 | Earth work in Back Filling \n7.20 x 2/3rd = 4.75 m3 | | 4.75 | M3 |
|---|
| 22 | 22 | Supplying and storing Polythene water storage tank of ISI mark (eg. Syntax/Sinter/Himgiri/Gangotri etc) three layers with cover & locking systems etc all complete Job as per direction of E/I. | | 5000 | Ltr |
|---|
| 23 | 23 | Carriage of materials | | | |
|---|
| 24 | 24 | a) cement+rod- 10 Kms lead | | 5.14 | MT |
|---|
| 25 | 25 | b) sand-20 Km lead | | 6.386 | M3 |
|---|
| 26 | 26 | c) stone chips-20 Km lead | | 6.81 | M3 |
|---|
| 27 | 27 | d)Brick-10 Km lead | | 1.392 | Nos |
|---|
| 28 | 28 | Supplying, installation & commissioning of 2H.P.(1800 Wp) solar water pumping system having discharges 1.77 LPS on 75M head including SPV modules of suitable rating, solar water pump, power conditioning unit, mountion structure, cables & hard ware junction box, earthing Kit, Lighting Conductor, HDPE pipe for suction,S.S straining wire for pump,G.I.fittings, suitable capacity MCB with array box all complete with 2years faultless operation warranty, 10 year limited warranty for SPV modules & one year for balance system against manufacturing defect etc,all complete. | | | |
|---|
| 29 | 29 | S/F/F 2mm thick ms box including cost of cutting, fabrication, smooth building, hings, handle, ring, L drop with loking arrangement system and applying a priming red lead paint over steel surface etc all complete all taxes as per specification and direction of E/I.\n4x0.6x0.6+2x0.6x0.3=1.80 [email protected]/m2= 28.26 K.G. | | 1 | each |
|---|
| 30 | 30 | S/F/F 2mm thick ms box including cost of cutting, fabrication, smooth building, hings, handle, ring, L drop with loking arrangement system and applying a priming red lead paint over steel surface etc all complete all taxes as per specification and direction of E/I.\n4x0.6x0.6+2x0.6x0.3=1.80 [email protected]/m2= 28.26 K.G. | | 1 | L.S. |
|---|
| 31 | 31 | Providing & supplying G.I pipe approved basis rates of materalals for prepearatration of rate only (materials should confirm to relevant B.I.S. specification) of the rate if inclusive of all taxes, royality carriage etc. | | | |
|---|
| 32 | 32 | 50 mm dia | | 50 | p/m |
|---|
| 33 | 33 | add 5% extra for specials | | 1 | Nos |
|---|
| 34 | 34 | Providing and fixing G.M. N.R valve (Horizontal) of approved quality all complete as per sepecifiation & direction of E/I. | | | |
|---|
| 35 | 35 | 50 mm dia | | 1 | each |
|---|
| 36 | 36 | Earth Work in excavation of foundation in laying of different types and sizes of pipes so as to give 1mtre averege cover over the socket of pipe with disposel of excavated earth within initials led and lift as per specification & direction of E/I (for classification of soil item B) | | | |
|---|
| 37 | 37 | 50 mm dia 38 x0.5x1.05 =19.95M2 | | | |
|---|
| 38 | 38 | 5% extra for junction=1 M2 | | | |
|---|
| 39 | 39 | Total 20.95 M3 | | 20.95 | P/M3 |
|---|
| 40 | 40 | Supplying labour & Tools for laying jointing & testing G.I pipes in trenches night guards barrarers & rad lights to safe guard against accident all complete as per specification and direction of E/I. | | | |
|---|
| 41 | 41 | 50 mm dia | | 50 | P/M |
|---|
| 42 | 42 | Earth Work in back filling in trenches after laying different types & sizes of pipes with earth removed during excavation within initials lead and lift as per specification and direction of E/I. | | | |
|---|
| 43 | 43 | Taking as 80 % of total earth work | | | |
|---|
| 44 | 44 | 20.95x80%=16.76M3 | | 16.76 | P/M3 |
|---|
| 45 | 45 | Earthwork in excavation ( As per I.S.3114/1965 for laying of different types and sizes of pipes so as to give one meter average cover over the socket of pipe with disposal of excavated earth within initial lead and lift as per specification and direction of Engineer-in-Charge (b) as per classification of soil item –B | | | |
|---|
| 46 | 46 | 900.00x0.50x1.00 = 450.00 | | | |
|---|
| 47 | 47 | Add. Extra for 5% For Socket = 22.5\nTotal= 450+22.50=472.50 | | | |
|---|
| 48 | 48 | Assuming 80% of total Earth work of taken classification soil item – B i.e. =378.00 | | 504 | Cum. |
|---|
| 49 | 49 | Earth Work in excavation of foundation trenches as per design section in ordinary soft rock (vide classification of soil item-C) and disposal of excavated materials so obtained (50 M away from the edge of the trenches) with initial lead of 150M and initial lift of 1.5m as per specification and direction of E/I in ordinary or soft rock (where blasting is not required) | | | |
|---|
| 50 | 50 | Balance 20% of total Earth work of taken classification soil item– C i.e.= 126.00 | | 126 | Cum. |
|---|
| 51 | 51 | Supplying tools and cutting road as well restoring the same as per specification and direction of E/I | | | |
|---|
| 52 | 52 | (a) Puuca Road (Except Black top only taken out material to be used) for cutting road as per requirement. \n20.00 x 0.50 x 0.50 = 10 M3 | | 10 | Sqm |
|---|
| 53 | 53 | Water Bound Macadam road (taken out material will be used) for cutting road as per requirement.\n70.00 x 0.50 x =35.00 | | 35 | Sqm |
|---|
| 54 | 54 | Providing PCC M-150 in nominal mix of (1:2:4) in foundation with approved quality of stone chips 20 mm -6 mm size graded and clean coarse sand of FM 2.5 to 3.0 including screening shuttering mixing cement concrete in mixer and placing in position vibrating Striking curing taxes and royalty all complete as per building specification and direction of E/I.\nMeasurement Taken By Item No. 3 | | 5 | Cum |
|---|
| 55 | 55 | Earthwork in back filling the trenches after laying different types and sizes of pipes with earth removed during excavation within initial lead and lift as per specification and design of Engineer-in-Charge (for classification of Soil item B & C) | | | |
|---|
| 56 | 56 | Taken as 80% of total earth work i.e= 504 | | 504 | Cum |
|---|
| 57 | 57 | Supplying all materials labours & laying of PVC Pipe (SH-40) of approved make in trenches with Shocket, red lead, yarn , screw joint & cutting pipe to size & threading & ends were neccessory etc all complet job. | | | |
|---|
| 58 | 58 | 50 mm dia | | 300 | Mtr |
|---|
| 59 | 59 | 40 mm dia | | 400 | Mtr |
|---|
| 60 | 60 | 32 mm dia | | 500 | Mtr |
|---|
| 61 | 61 | Providing & fixing of GI fitting as per approved make etc all complete as per specification & direction of E/I. | | | |
|---|
| 62 | 62 | Shocket | | | |
|---|
| 63 | 63 | 50 mm dia | | 96 | Each |
|---|
| 64 | 64 | 40 mm dia | | 124 | Each |
|---|
| 65 | 65 | 32 mm dia | | 160 | Each |
|---|
| 66 | 66 | Elbow | | | |
|---|
| 67 | 67 | 50 mm dia | | 6 | Each |
|---|
| 68 | 68 | 40 mm dia | | 10 | Each |
|---|
| 69 | 69 | 32 mm dia | | 20 | Each |
|---|
| 70 | 70 | T-Plain | | | |
|---|
| 71 | 71 | 50 mm dia | | 9 | Each |
|---|
| 72 | 72 | 40 mm dia | | 15 | Each |
|---|
| 73 | 73 | 32 mm dia | | 18 | Each |
|---|
| 74 | 74 | Reducing Shocket | | | |
|---|
| 75 | 75 | 50 mm dia | | 4 | Each |
|---|
| 76 | 76 | 40 mm dia | | 5 | Each |
|---|
| 77 | 77 | Nipple | | | |
|---|
| 78 | 78 | 50 mm dia | | 6 | Each |
|---|
| 79 | 79 | 40 mm dia | | 10 | Each |
|---|
| 80 | 80 | 32 mm dia | | 20 | Each |
|---|
| 81 | 81 | Plug | | | |
|---|
| 82 | 82 | 50 mm dia | | 2 | Each |
|---|
| 83 | 83 | 40 mm dia | | 5 | Each |
|---|
| 84 | 84 | 32 mm dia | | 8 | Each |
|---|
| 85 | 85 | Reducing Tee | | | |
|---|
| 86 | 86 | 50 mm dia | | 5 | Each |
|---|
| 87 | 87 | 40 mm dia | | 7 | Each |
|---|
| 88 | 88 | 32 mm dia | | 9 | Each |
|---|
| 89 | 89 | Union Shocket | | | |
|---|
| 90 | 90 | 50 mm dia | | 4 | Each |
|---|
| 91 | 91 | 40 mm dia | | 10 | Each |
|---|
| 92 | 92 | 32 mm dia | | 15 | Each |
|---|
| 93 | 93 | Long Thread | | | |
|---|
| 94 | 94 | 50 mm dia | | 3 | Each |
|---|
| 95 | 95 | Providing and fixing Gun metal Full way Valve of approved quality , all complete as per specification and direction of E/I. nalysis Attached) | | | |
|---|
| 96 | 96 | 50 mm dia | | 4 | Each |
|---|
| 97 | 97 | 40 mm dia | | 4 | Each |
|---|
| 98 | 98 | 32 mm dia | | 5 | Each |
|---|
| 99 | 99 | Providing & fixing D.F. Sluice Valve of approved quality as per specification & direction of E/I.\n50 mm dia weight not less than 1 K.G. | | 1 | Each |
|---|
| 100 | 100 | Providing and constructing B.B masonry valve chamber with15 cm thick 1:3:6 proportion P.C.C bending, excluding excavation,B.B masonry in C.M 1:5 Proportion precast RCC frame and cover etc. complete as directed by Engineer-in-charge. | | | |
|---|
| 101 | 101 | As above of 95 x 45 cm internal size and depth up to 1.2 M . | | 6 | Each |
|---|
| 102 | 102 | HOUSE CONNECTION | | 1 | Nos |
|---|
| 103 | 103 | House for 65 Nos House Connection x3017.03 | | 65 | Nos |
|---|
| 104 | 104 | Earthwork in excavation in foundation trenches in ordinary soil (vide classification of soil item- A) and disposal of excavated earth as obtained to a distance up to 50 M. including all lifts, leveling, ramming the foundation trenches, removing roots of trees, shrubs all complete as per approved design, building specification and direction of E/I. | | | |
|---|
| 105 | 105 | 4.20 x 0.50 x 0.625 = 1.31 m3 | | 1.31 | m3 |
|---|
| 106 | 106 | Providing, coarse clean sand in filling in foundation trenches/in plinth including ramming & watering in layers not exceeding 150 mm thick with all leads and lifts including cost of all materials ,labour ,royalty & taxes all complete as per building specification & direction of E/I.(mode of measurement compacted volume)\n | | | |
|---|
| 107 | 107 | 4.20 x 0.50 x 0.075 = 0.157m3 | | 0.157 | m3 |
|---|
| 108 | 108 | Providing designation 75 B one brick flat soling joints filled with local sand including cost of watering ,taxes ,royalty all complete as per building specification and direction of E/I. | | | |
|---|
| 109 | 109 | 4.20 x 0.50 = 2.10 m2 | | 2.1 | m2 |
|---|
| 110 | 110 | Providing P.C.C.M.-150 with nominal mix of (1:2:4) in foundation with approved quality of stone metal grade-III (50 mm to 25mm. size) clean coarse sand of F.M. 2.5 to 3 including screening, shuttering, mixing cement concrete in mixer and placing in position, vibrating , striking, curing, taxes and royalty all complete as per building specification | | | |
|---|
| 111 | 111 | 4.20 x 0.50 x 0.10 = 0.21 m3 | | 0.21 | m3 |
|---|
| 112 | 112 | Providing designation 75 A brick work in C.M. (1:6) in foundation and plinth with approved quality of clean coarse sand of F.M. 2 to 2.5 including, providing 10mm thick mortar joints, cost of screening materials, raking out joints to 15mm depth, curing, taxes and royalty all complete as per building specification and direction of E/I.\n | | | |
|---|
| 113 | 113 | 4.20 x 0.25 x 0.82 = 0.86 m3 | | 0.86 | m3 |
|---|
| 114 | 114 | Providing 12mm thick cement plaster (1:6) with clean coarse sand of FM 1.5 including screening, curing, with all leads and lifts of water, scaffolding, taxes and royalty all complete as per specificat i o n a n d direction of E/I. | | | |
|---|
| 115 | 115 | in Side - 4 x 0.80 x 0.45 = 1.44 m3 | | | |
|---|
| 116 | 116 | Out Side - 4 x 1.30 x 0.45 = 2.34 m3 | | 3.78 | m3 |
|---|
| 117 | 117 | Providing precast R.C.C M-150 with nominal mix of (1:2:4) slab of desired size with approved quality of stone chips and clean coarse sand of F.M. 2.5 to 3 including curing shuttering carrying the slab the cast of reinforcement ) taxes, royalty all complete as per the building specification & direction of E/I. | | | |
|---|
| 118 | 118 | 1.30 x 1.30 x 0.10 = 0.169 m2 | | 0.169 | m3 |
|---|
| 119 | 119 | Providing Tor steel reinforcement of 10mm., 12mm & 16mm. dia bars as per approved design and drawing excluding carrriage of bars to work site, cutting, bending and binding with annealed wire with cost of wire, removal of rust, placing the rods in position all complete as per building specification and direction of E/I.\n | | | |
|---|
| 120 | 120 | 0.169 x 0.01 x 7.85 = 0.0132 | | 0.0132 | MT |
|---|
| 121 | 121 | Carriage of materials from divisional store or kiln site or quarry site to work site including contract profit,loading ,unloading , transportation, etc. all complete\n\n | | | |
|---|
| 122 | 122 | a. Cement +steel (Lead 10 K.M) | | 0.204 | MT |
|---|
| 123 | 123 | b. Sand (Lead 20 K.M) | | 0.712 | cum |
|---|
| 124 | 124 | c.Chips (Lead 20 K.M) | | 0.349 | cum |
|---|
| 125 | 125 | d. Bricks (Lead 10 K.M) | | 0.429 | nos |
|---|
| 126 | 126 | For 1st years O & M | | 1 | Year |
|---|
| 127 | 127 | For 2nd year O & M | | 1 | Year |
|---|
| 128 | 128 | G.S.T | | 1.54435e+06 | % |
|---|
| 129 | 129 | Labour Cess | | 1.72967e+06 | % |
|---|