Supply ,Installation, Commissioning And Training Of Temperature Calibrator Test Set Up For Three Phase Locos As Per Technical Specification Attached. (01) Firms To Note:- Firm Should Upload Technical Specification Comparison With Railway Requirement Other
Tender Value
Ref. Documents
Estimated cost
Bid Submission
13 Aug 2020
0 days left
EMD
Ref. Documents
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
→ Maharashtra
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Supply Of , Supply ,Installation, Commissioning And Training Of Temperature Calibrator Test Set Up For Three Phase Locos As Per Technical Specification Attached. (01) Firms To Note:- Firm Should Upload Technical Specification Comparison With Railway Requirement Otherwise Summarily Rejected.
BOQ
| 0 | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | |
|---|---|---|---|---|---|---|---|---|---|---|
| 0 | S.No. | PL Code\r(Group) | Item Type\rGST(Y/N) | Stock /\rNonStock | Ordering | Consider\rFor Eval | Approving\rAgency | Inspection\rAgency | Currency\rAllowed | Estimated\rRate |
| 1 | 1 | 25XXN01 | Goods (Y) | Non Stock | --- | Yes | RITES | INR | ||
| 2 | Description :Supply ,installation, commissioning and training of temperature calibrator test set up for three phase\rlocos as per Technical specification attached. (01) firms to note:- Firm should upload technical specification\rcomparison with Railway requirement Otherwise summarily rejected. | |||||||||
| 3 | Consignee | Sr. Section Engineer\r(TRS/MAINT) BSL | Maharashtra | 1.00 Numbers |
AI Tender Summary
Tender Timeline
Jul 20, 2020
11:30 IST
Tender Published
Tender notice published.
CompletedAug 13, 2020
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Completed