P/O 2 Nos Supporting Wire For 260 Feet High Communication Pole At Jutogh Cantt Distt Sml Provision Of 2 Nos Supporting Wire For 260 Feet High Communication Pole At Jutogh Cant Distt Shimla Hp , Sub-Head : Earth Work , Earth Work In Excavation By Mechanical Means ( Hydraulic Excavator ) / Manual Means Over Areas ( Exceeding 30Cm In Depth , 1 . 5M In Width As Well As 10 Sqm On Plan ) Including Getting Out And Disposal Of Excavated Earth , Lead Up To 50M And Lift Up To 1 . 5M , As Directed By Engineer-In-Charge . , All Kinds Of Soil , Earth Work In Excavation By Mechanical Means ( Hydraulic Excavator ) / Manual Means Over Areas ( Exceeding 30 Cm In Depth , 1 . 5M In Width As Well As 10 Sqm On Plan ) Including Getting Out And Disposal Of Excavated Earth , Lead Up To 50 M And Lift Up To 1 . 5M , As Directed By Engineer-In-Charge . , Ordinary Rock , Filling Available Excavated Earth ( Excluding Rock ) In Trenches , Plinth , Sides Of Foundations Etc . In Layers Not Exceeding 20Cm In Depth , Consolidating Each Deposited Layer By Ramming And Watering , Lead Up To 50 M And Lift Up To 1 . 5 M . , Extra For Every Additional Lift Of 1 . 5 M Or Part Thereof In Excavation /Banking Excavated Or Stacked Materials . , All Kinds Of Soil . , Ordinary Or Hard Rock . , Sub-Head : Concrete Work , Providing And Laying In Position Cement Concrete Of Specified Grade Excluding The Cost Of Centering And Shuttering - All Work Up To Plinth Level : , 1:5:10 ( 1 Cement : 5 Coarse Sand ( Zone-Iii ) : 10 Graded Stone Aggregate 40 Mm Nominal Size ) , Sub-Head : Reinforced Cement Concrete , Providing And Laying In Position Specified Grade Of Reinforced Cement Concrete , Excluding The Cost Of Centering , Shuttering , Finishing And Reinforcement - All Work Up To Plinth Level : , 1:1 . 5:3 ( 1 Cement : 1 . 5 Coarse Sand ( Zone-Iii ) : 3 Graded Stone Aggregate 20 Mm Nominal Size ) , Centering And Shuttering Including Strutting , Propping Etc . And Removal Of Form For : , Foundations , Footings , Bases Of Columns , Etc . For Mass Concrete , Steel Reinforcement For R . C . C . Work Including Straightening , Cutting , Bending , Placing In Position And Binding All Complete Upto Plinth Level . , Thermo-Mechanically Treated Bars Of Grade Fe-500D Or More . , Sub-Head : Steel Work , Supplying Following Approved Quality Fixtures For Long Pole Type Communication Tower Support All Complete As Per The Direction Of Engineer-In-Charge . , D-Saddle ( 25 Mm Dia D- Hook With Nut Bolt ) , 25 Mm Dia Ms Chain Link , 25 Mm Dia Gi Guy Wire / Supporting Wire , Ms Adjustable Piece For Tightening 25 Mm To 32 Mm Dia Gi Supporting Wire , Making Arrangement For Connecting And Tightening 2 Nos 25 Mm Dia Steel Guyed / Supporting Stay Wire ( As On Site Connected With 260 Ft Pole At Two Levels ) By Providing And Fixing New 25Mm Steel Guyed/ Supporting Stay Wire By Fixing Minimum 3 Nos 25 Mm Dia D-Saddle ( D Hook With Locking Nutbolt ) On Each Side Of Guyed / Supporting Stay Wires Including Tighetening Of Wires By Mechanical Pulling Arrangement Inside Foundation By 25 Mm Dia Ms Chain Link All Complete As Per Direction Of Engineer-In-Charge . ( Note :- D-Saddle ( D Hook ) , Ms Guyed Wire / Supporting Stay , Ms Adjustable Piece For Tighetening Of Wire , 25 Mm Dia Chain Link Shall Be Paid For Separatley But Rate Of This Item Is Inclusive Of Labour Required For Fixing All These Items / Fixtures )