Public Health Engineering Department-PHED has published Dnit For The Work Of Providing And Installation Of Reverse Osmosis Based Water Treatment Plant, Coin Dispensing System, Preparation Of Rfid Card Including Water Tank In Village Siwari Constituency Pataudi Distt. Gurugram (Rs. 27.70 Lacs) “Supply, Installa. Submission Date for this Tender is 04-08-2020. Water Treatment Plant Tenders in Siwari Haryana. Bidders can get complete Tender details and download the document.
Name of Work: DNIT for the work of Providing and Installation of Reverse Osmosis based Water Treatment Plant, Coin dispensing system, preparation of RFID card including water tank in village Siwari Constituency Pataudi Distt. Gurugram (Rs. 27.70 Lacs) “Supply, Installation, Commissioning with quality Test report and Operation and Maintenance of the whole of pure drinking water distribution/dispensing 1 No. plant/Unit of Capacity 3000 LPH for village Siwari & 1 No. plant/ Unit of capacity 900 LPH for Dhani Hiran product water on single phase power supply for a period of 10 year old Turnkey/EPC basis at village Siwari & Dhani Hiran Distt. Gurugram and all other works contingent thereto" | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1 | Providing / & Instt of HDPE raw water storage tank to be used for R.O. system as per PHED Standard specification | Item 1 | 5000 | ltr |
2 | 2 | Providing / & Instt of HDPE water treated tank to be used for R.O. system as per PHED Standard specification | Item 2 | 5000 | ltr |
3 | 3 | Providing / & Instt of HDPE tank for chemical doze as per PHED Standard specification\n1. Antiscalent = 100 ltr. 2. Chlorine SMBS= 100 ltr.\n | Item 3 | 200 | ltr |
4 | 4 | Providing / & Instt of HDPE tank for 4 Nos. ATM of capacity 500 ltr. each as per PHED Standard specification | Item 4 | 2000 | ltr |
5 | 5 | Providing and Installation of reverse osmosis system of capacity3000 LPH with TDS upto 3000 PPM including raw water pump of suitable capacity (Kirlosker make) including high pressure pump, fully automatic panel complete in all respect as per specificaiton of PHED. | Item 5 | 1 | Nos. |
6 | 6 | Providing & fixing of coin dispencing system,preparation of RFID card and providing & fixing of water storage tank complete in all respect. | Item 6 | 4 | Nos. |
7 | 7 | Providing, laying, jointing of G.I./PVC pipes and special along trenches and laying the same in trenches to correct alingment and gradients including cartage from divisional stores or nearest railway station of site of works and return of pieces of pipes to stores of following sizes \n50 mm internal diameter pipe line laid complete | Item 7 | 430 | mtr |
8 | 8 | Providing, laying, jointing of G.I./PVC pipes and special along trenches and laying the same in trenches to correct alingment and gradients including cartage from divisional stores or nearest railway station of site of works and return of pieces of pipes to stores of following sizes \n80 mm internal diameter pipe line laid complete | Item 8 | 100 | mtr |
9 | 9 | Construction of RCC Platform for placing the ALL HDPE Tank including excavation foundation of cement concrete with base PCC of 1:4:8 complete in all respects as per PHED specification | Item 9 | 1 | job |
10 | 10 | Const. of evaporation pond mean size 42x42x1 mtr and free board of 0.15 m complete in all respect as per specification mentioned in DNIT/Drawings= | Item 10 | 1 | job |
11 | 11 | Providing / & Instt of HDPE raw water storage tank to be used for R.O. system as per PHED Standard specification | Item 11 | 2000 | ltr |
12 | 12 | Providing / & Instt of HDPE water treated tank to be used for R.O. system as per PHED Standard specification | Item 12 | 2000 | ltr |
13 | 13 | Providing / & Instt of HDPE tank for chemical doze as per PHED Standard specification\n1. Antiscalent = 100 ltr. 2. Chlorine SMBS= 100 ltr.\n | Item 13 | 200 | ltr |
14 | 14 | Providing and Installation of reverse osmosis system of capacity 900 LPH with TDS upto 3000 PPM including raw water pump of suitable capacity (Kirlosker make) including high pressure pump, fully automatic panel complete in all respect as per specificaiton of PHED. | Item 14 | 1 | Nos. |
15 | 15 | Providing & fixing of coin dispencing system,preparation of RFID card and providing & fixing of water storage tank complete in all respect. | Item 15 | 1 | Nos. |
16 | 16 | Providing, laying, jointing of G.I./PVC pipes and special along trenches and laying the same in trenches to correct alingment and gradients including cartage from divisional stores or nearest railway station of site of works and return of pieces of pipes to stores of following sizes \n50 mm internal diameter pipe line laid complete | Item 16 | 50 | mtr |
17 | 17 | Providing, laying, jointing of G.I./PVC pipes and special along trenches and laying the same in trenches to correct alingment and gradients including cartage from divisional stores or nearest railway station of site of works and return of pieces of pipes to stores of following sizes \n80 mm internal diameter pipe line laid complete | Item 17 | 20 | mtr |
18 | 18 | Construction of RCC Platform for placing the all HDPE Tank including excavation foundation of cement concrete with base PCC of 1:4:8 complete in all respects as per PHED specification | Item 18 | 1 | job |
19 | 19 | Const. of evaporation pond mean size 42x42x1 mtr and free board of 0.15 m complete in all respect as per specification mentioned in DNIT/Drawings= | Item 19 | 1 | job |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy