| 1 | 1 | Erection of Single pole mounted DT Structure Complete (including fixing of MCD box,HT jumpering complete,Painting of all clamps, other materials and painting of structure pole,LT Cable arrangement, Fixing of Danger board) | Item1 | 22 | Loc |
|---|
| 2 | 2 | Pole pit excavation for 9.0M and 9.14 M PSC/RCC / all metal poles (each pit) 1.25 x 0.6 x 1.83 mtr - Ordinary soil | Item2 | 120 | Pit |
|---|
| 3 | 3 | Erection of 9.00m / 9.14m RCC / PSC/Rail pole, Tubular pole and all Metal Poles (Including refilling of excavated earth) | Item3 | 120 | E |
|---|
| 4 | 4 | Transport of 9.0 mtr and above poles including R.S. Joist and Rail poles upto 1.0 Km | Item4 | 120 | Per Pole |
|---|
| 5 | 5 | Loading of [ 9.14 mtr ] 9.0 mtr poles RCC /PSC Pole / Metal Pole [ per pole ] | Item5 | 120 | E |
|---|
| 6 | 6 | Pit excavation for 7.5 mts / 8 mts pole in ordinary soil including cleaning of site (each pit) - 1.25 x 0.6 x 1.5m [ordinary soil] | Item6 | 40 | Pit |
|---|
| 7 | 7 | Erection of 7.5m / 8.0m poles [RCC / PSC] (Including refilling of excavated earth) | Item7 | 40 | E |
|---|
| 8 | 8 | Transport 7.5 mtrs / 8.00 mtrs of poles including R.S.Joist and Rail Poles Upto 1.0 Km | Item8 | 40 | Per Pole |
|---|
| 9 | 9 | Loading of 7.5 Mtr / 8.0 Mtr RCC / PSC/ Metal Pole [ per pole ] | Item9 | 40 | E |
|---|
| 10 | 10 | Unloading of PSC / RCC / Metal Poles | Item10 | 160 | E |
|---|
| 11 | 11 | Excavation of Stay pit in ordinary soil [0.95 x 0.6 x 1.2m] | Item11 | 172 | Pit |
|---|
| 12 | 12 | Erection stay set complete (Including refilling of excavated earth) | Item12 | 172 | Set |
|---|
| 13 | 13 | Sleeve concreting for pole 0.6 m x 0.6m x 0.3 m with coping (including all materials) | Item13 | 160 | Loc |
|---|
| 14 | 14 | Earthing of poles | Item14 | 160 | E |
|---|
| 15 | 15 | Fixing of LT 3 phase cross arm | Item15 | 131 | E |
|---|
| 16 | 16 | Fixing of LT 1 phase cross arm | Item16 | 1 | E |
|---|
| 17 | 17 | Fixing of Aluminium knob | Item17 | 131 | E |
|---|
| 18 | 18 | Fixing of 3 1/2 V Cross arm | Item18 | 162 | E |
|---|
| 19 | 19 | Fixing of tapping channel cross arm | Item19 | 116 | E |
|---|
| 20 | 20 | Fixing of LTTI, HT TI Fitting | Item20 | 215 | E |
|---|
| 21 | 21 | Fixing of 11 KV strain disc / polymer disc with hardware | Item21 | 414 | set |
|---|
| 22 | 22 | Fixing of 11 KV Pin insulator with pin | Item22 | 674 | E |
|---|
| 23 | 23 | Erection LT open type fuse unit arrangement single / Double | Item23 | 24 | Set |
|---|
| 24 | 24 | Fixing of LT Pin insulator with pin | Item24 | 219 | E |
|---|
| 25 | 25 | Fixing of LT Shackle with hardware | Item25 | 186 | E |
|---|
| 26 | 26 | Paving Stringing and sagging of conductor including binding of pin and proper tight [including transport of condutor from Road side to work spot] per run - Upto 7/2.59 mm ACSR, 7/2.50 AAAC including PVC cable upto 25 sqmm | Item26 | 28.647 | Km |
|---|
| 27 | 27 | Paving Stringing and sagging of conductor including binding of pin and proper tight [including transport of condutor from Road side to work spot] per run - ACSR 7/3.35mm & 7/ 3.15 AAAC including PVC cable above 25 sqmm | Item27 | 4.07 | Km |
|---|
| 28 | 28 | Releasing of conductor -Upto 7/2.59 mm ACSR,7/2.50 AAAC including PVC cable upto 25 sqmm | Item28 | 17.323 | Km |
|---|
| 29 | 29 | Releasing of ACSR 7/3.35mm & 7/ 3.15 AAAC including PVC cable above 25 sqmm | Item29 | 4.07 | Km |
|---|
| 30 | 30 | Labour charges for alteration of back clamp / stay clamp to suitable for works. | Item30 | 350 | E |
|---|
| 31 | 31 | Transport of line Materials [ minimum 1 MT ] from sub stores to section pocket store or near to work spot at road side by using private vehicle or vice versa excluding loading and unloading - Upto 8 kms | Item31 | 60 | MT |
|---|
| 32 | 32 | Transport of line Materials [ minimum 1 MT ] from sub stores to section pocket store or near to work spot at road side by using private vehicle or vice versa excluding loading and unloading - Above 8 Kms and for every addl. 1 KM | Item32 | 60 | MT |
|---|
| 33 | 33 | Releasing and erection 1 ph SC wire [during conductor or support change] | Item33 | 255 | SC |
|---|
| 34 | 34 | Releasing and erection 3 ph SC wire [during conductor or support change] | Item34 | 25 | SC |
|---|
| 35 | 35 | Dismantling of 7.5m / 8.0m poles [RCC / PSC] | Item35 | 69 | E |
|---|
| 36 | 36 | Dismantling of ACSR 7/3.35mm & 7/ 3.15 AAAC | Item36 | 2.372 | Km |
|---|
| 37 | 37 | Dismantling of 7/2.59 mm ACSR, 7/2.50 AAAC | Item37 | 5.115 | Km |
|---|
| 38 | 38 | Dismantling of Aluminium knob | Item38 | 121 | E |
|---|
| 39 | 39 | Fixing of street light fitting with 2 CFL/ 4 CFL | Item39 | 12 | Fitting |
|---|
| 40 | 40 | Dismantling of street light fitting with 2 CFL/ 4 CFL | Item40 | 12 | Fitting |
|---|
| 41 | 41 | Dismantling of LT 3 phase cross arm | Item41 | 120 | E |
|---|
| 42 | 42 | Dismantling of LT Shackle with hardware | Item42 | 132 | E |
|---|
| 43 | 43 | Dismantling of LT Pin insulator with pin | Item43 | 254 | E |
|---|
| 44 | 44 | DT Metering with integrated meter above 63 KVA | Item44 | 2 | E |
|---|
| 45 | 45 | DT Metering with integrated meter above 25 & 16 KVA | Item45 | 15 | E |
|---|
| 46 | 46 | DT Metering with whole current meter for 63 KVA | Item46 | 11 | E |
|---|
| 47 | 47 | Sub Total | Item47 | 1 | Each |
|---|
| 48 | 48 | EPF @ 13.36% | Item48 | 1 | Each |
|---|
| 49 | 49 | ESI @ 3.25% | Item49 | 1 | Each |
|---|
| 50 | 50 | SGST % | Item50 | 1 | Each |
|---|
| 51 | 51 | CGST % | Item51 | 1 | Each |
|---|
| 52 | 52 | IGST % | Item52 | 1 | Each |
|---|