Indian Navy-IN has published Rrc For Routines/ Repairs Of Lifts - Cargo , Passenger , Galley And Aa Lifts Including Load Test Onboard In Ships For A Period Of Two Years At Nsry ( Karwar ). Submission Date for this Tender is 04-08-2020. Measuring and Layout Tools Tenders in NSRY,KARWAR Karnataka. Bidders can get complete Tender details and download the document.
Name of Work: RRC for Routines/ Repairs of Lifts-Cargo, Passanger, Galley and AA lifts including Load testing onboard IN SHIPS at NSRY (Karwar) | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1.01 | AMMUNITION LIFT NO. 1 | |||
2 | 1.02 | Power drive assembly and Wire rope assembly, Overhaul following\n(Re-chrome as necessary) | |||
3 | 1.03 | Power drive hydraulic assembly | 4 | Nos | |
4 | 1.04 | Hydraulic lift cover drive assembly. | 2 | Nos | |
5 | 1.05 | Hydraulic Keeps and Guard rails | |||
6 | 1.06 | Overhaul hydraulic pump of keeps including draining and cleaning of hydraulic tanks. | 8 | Nos | |
7 | 1.07 | Overhaul hydraulic guard rail stanchion drive | 1 | Nos | |
8 | 1.08 | Overhaul all guard rail stanchions | 8 | Nos | |
9 | 1.09 | Overhaul all speed regulators. | 1 | Nos | |
10 | 1.1 | Inspect complete hydraulic pipelines for leakages, rectify leakages. | 1 | Nos | |
11 | 1.11 | Electrical Panels and Controls | |||
12 | 1.12 | Service all limit/ control switches for proper operation. | 1 | Nos | |
13 | 1.13 | Overhaul main control panel, local operating panel and repair/ renew defective components including renewal of corroded panel boxes. | 1 | Nos | |
14 | 1.14 | Undertake serviceability checks of electrical interlocks and sequencing of lift operation controls. Rectify defects as necessary to ensure AUTO operation of lift. | 1 | Nos | |
15 | 1.15 | Tests and Trials | |||
16 | 1.16 | Carryout hydraulic test of all assemblies and rectify any leakage if observed. | 1 | Nos | |
17 | 1.17 | Carry out alignment checks of lift | 1 | Nos | |
18 | 1.18 | STW and trials of lift in AUTO mode | 1 | Nos | |
19 | 1.19 | Load Test of Lift, rectify defects observed during load test | 1 | Nos | |
20 | 1.2 | Power drive assembly and Wire rope assembly, Overhaul following\n(Re-chrome as necessary) | |||
21 | 1.21 | Carriage assembly | 1 | Nos | |
22 | 1.22 | Catcher assembly | 1 | Nos | |
23 | 1.23 | Sheave blocks, speed limiters and tensioners (4+8+4+8) | 1 | Nos | |
24 | 1.24 | Support Running Roller | 1 | Nos | |
25 | 1.25 | Cable break signaling device | 1 | Nos | |
26 | 1.26 | Carryout serviceability checks of steel wire ropes and renew if necessary | 1 | Nos | |
27 | 1.27 | Auxiliary Brake | |||
28 | 1.28 | Dismantle plunger unit and check oil brake winding. | 1 | Nos | |
29 | 1.29 | Clean brake mechanism and renew all corroded parts of brake liner. | 1 | Nos | |
30 | 1.3 | Overhaul electromagnetic brake, renewal of brake pads and brake coil. | 1 | Nos | |
31 | 2 | Ammunition Lift 2,3 And 4 | |||
32 | 2.01 | Main Drive Assembly and Working Chain Assembly | |||
33 | 2.02 | Overhaul drive motor of main drive winch assembly. including renewal of bearings and balancing of the rotor. | 3 | Nos | |
34 | 2.03 | Overhaul reduction drive gear box and sprockets assembly including renewal of bearings (Qty 03 perlift) | 3 | Nos | |
35 | 2.04 | Survey and repair winch foundations including replacement of foundation fasteners | 30 | M2 | |
36 | 2.05 | Disconnect the chain yoke from platform and inspect for deformation. Repair /renew as necessary. (Qty 04 per lift) | 3 | Nos | |
37 | 2.06 | Remove, clean and inspect working chain, renew as necessary. (Qty 04 per lift) | 3 | Nos | |
38 | 2.07 | Check clearances of working chain and chain guide. Repair/ renew as necessary. (Qty 04 per lift) | 3 | Nos | |
39 | 2.08 | Renew safety chain guide and adjust safety guide chain mechanism. (Qty 04 per lift) | 3 | Nos | |
40 | 2.09 | Overhaul Upper sprockets. | 3 | Nos | |
41 | 2.1 | Overhaul pump (Qty 02 Per Lift) | 6 | Nos | |
42 | 2.11 | Hydraulic Keeps, Hinges and System | |||
43 | 2.12 | Overhaul hydraulic pump of keeps including draining and cleaning of hydraulic tanks | 26 | Nos | |
44 | 2.13 | Overhaul lift cover drive hydraulic hinge assembly | 4 | Nos | |
45 | 2.14 | Overhaul all hydraulic keep assemblies | 3 | Nos | |
46 | 2.15 | Overhaul all hydraulic manipulators | 3 | Nos | |
47 | 2.16 | Overhaul all speed regulators | 3 | Nos | |
48 | 2.17 | Inspect complete hydraulic pipelines for leakages, rectify leakages | 3 | Nos | |
49 | 2.18 | Auxiliary Brake | |||
50 | 2.19 | Dismantle plunger unit and check oil brake winding | 3 | Nos | |
51 | 2.2 | Clean brake mechanism and renew all corroded parts of brake liner | 3 | Nos | |
52 | 2.21 | Overhaul electromagnetic brake, renew brake pads and brake coil | 3 | Nos | |
53 | 2.22 | Doors and stanchions | |||
54 | 2.23 | Overhaul magazine door opening actuators | 3 | Nos | |
55 | 2.24 | Renew/ repair stanchions and rod gearing assembly including bevel gear and worm/ sprocket assembly | 3 | Nos | |
56 | 2.25 | Replace rubber beading of opening at Deck 1. Beading to be manufactured as per sample | 3 | Nos | |
57 | 2.26 | Electrical Panels and Controls | |||
58 | 2.27 | Service all limit/ control switches for proper operation | 3 | Nos | |
59 | 2.28 | Overhaul main control panel, local operating panel and repair/ renew defective components including renewal of corroded panel boxes. | 3 | Nos | |
60 | 2.29 | Renew magazine door limit switches | 3 | Nos | |
61 | 2.3 | Undertake serviceability checks of electrical interlocks and sequencing of lift operation controls. Rectify defects as necessary to ensure AUTO operation of lift. | 3 | Nos | |
62 | 2.31 | Tests and Trials | |||
63 | 2.32 | Carry out alignment checks of chain tracks. | 3 | Nos | |
64 | 2.33 | STW and trials of lift in AUTO mode | 3 | Nos | |
65 | 2.34 | Load Test of AA Lifts and Load Test of AA Lifts and during load test. | 3 | Nos | |
66 | 3 | GALLEY LIFT 1 & 2 | |||
67 | 3.01 | Lift Mechanism | |||
68 | 3.02 | Overhaul electric winch including motor. Renewal of DE&NDE Bearings as necessary | 2 | Nos | |
69 | 3.03 | Overhauling of brake unit and renew of brake pads as necessary | 2 | Nos | |
70 | 3.04 | Repair/ Renew electromagnetic brake mechanism and renew all brake liners | 2 | Nos | |
71 | 3.05 | Check clearances of guides and adjust as per document | 2 | Nos | |
72 | 3.06 | Undertake maintenance of counter weights | 2 | Nos | |
73 | 3.07 | Inspect and repair top snatch blocks and rope driving sheaves | 2 | Nos | |
74 | 3.08 | Inspect and renew steel wire ropes as necessary | 2 | Nos | |
75 | 3.09 | Clean trunk of Galley lift | 2 | Nos | |
76 | 3.1 | Lift Cabin | |||
77 | 3.11 | Overhaul lift cabin top and bottom safety catchers | 2 | Nos | |
78 | 3.12 | Repair cabin door and deck door to ensure free operation | 2 | Nos | |
79 | 3.13 | Clean and Paint lift cabin | 2 | Nos | |
80 | 3.14 | Controls | |||
81 | 3.15 | Inspect control cabinet for defects in wiring, circuit-breakers, signal lamps and push buttons, renew as necessary | 2 | Nos | |
82 | 3.16 | Check and adjust all limit/ unit switches for proper operation | 2 | Nos | |
83 | 3.17 | Inspect all safety circuit/ switches for proper operation, repair/modify as necessary | 2 | Nos | |
84 | 3.18 | Trials | |||
85 | 3.19 | Carry out alignment checks of lift | 2 | Nos | |
86 | 3.2 | STW and trials of lift in AUTO mode | 2 | Nos | |
87 | 3.21 | Load Test of Lift, rectify defects observed during load test | 2 | Nos | |
88 | 4 | PASSENGER /CARGO LIFT | |||
89 | 4.01 | Lift Mechanism | |||
90 | 4.02 | Overhaul main drive motor of main drive winch assembly, including renewal of bearings and balancing of the rotor | 4 | Nos | |
91 | 4.03 | Overhaul gear box assembly | 4 | Nos | |
92 | 4.04 | Overhaul brake unit and renew of brake pads as necessary | 4 | Nos | |
93 | 4.05 | Repair/ Renew electromagnetic brake mechanism and renew all brake liners | 4 | Nos | |
94 | 4.06 | Check clearances of counterweight and cabin guides and adjust as per document | 1 | Nos | |
95 | 4.07 | Undertake maintenance of counter weights | 4 | Nos | |
96 | 4.08 | Inspect and repair top snatch blocks and rope driving sheaves | 4 | Nos | |
97 | 4.09 | Inspect and renew steel wire ropes as necessary | 4 | Nos | |
98 | 4.1 | Clean trunk of Lift | 4 | Nos | |
99 | 4.11 | Check cabin and counterweight buffer springs, renew as necessary | 4 | Nos | |
100 | 4.12 | Overhaul cabin & counter weight securing mechanism | 4 | Nos | |
101 | 4.13 | Lift Cabin | |||
102 | 4.14 | Overhaul lift cabin top and bottom safety catchers | 4 | Nos | |
103 | 4.15 | Repair cabin door and deck door to ensure free operation | 4 | Nos | |
104 | 4.16 | Clean and Paint lift cabin | 4 | Nos | |
105 | 4.17 | Refurbish/renew/modify all cabin and deck locking mechanism. | 4 | Nos | |
106 | 4.18 | Controls | |||
107 | 4.19 | Inspect control cabinet for defects in wiring, circuit-breakers, signal lamps and push buttons, renew as necessary. | 4 | Nos | |
108 | 4.2 | Check and adjust all limit/ unit switches for proper operation | 4 | Nos | |
109 | 4.21 | Inspect all safety circuit/ switches for proper operation, repair/modify as necessary. | 4 | Nos | |
110 | 4.22 | Trials | |||
111 | 4.23 | Carry out alignment checks of lift | 4 | Nos | |
112 | 4.24 | STW and trials of lift in AUTO mode | 4 | Nos | |
113 | 4.25 | Load Test of Lift, rectify defects observed during load test | 4 | Nos | |
114 | 5 | SPARES | |||
115 | 5.1 | Sheave bearing. | 8 | Nos | |
116 | 5.2 | Bush Bearing. | 12 | Nos |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail