| 1 | 1 | GROUND COVERS: Maintenance of ground covers: Watering @ 10-15 litres /Sqm/day basing on the season and weather conditions ( (sub soil moisture shall be maintained continuously), weeding,trimming and keeping the ground cover in healthy condition with manual watering for a period 12 months etc., as directed by the Engineer-in-Charge / Horticulturist, complete. But excluding supply of water | | 948 | 100 Sqm/month |
|---|
| 2 | 2 | HEDGE/SHRUB : Maintenance of hedge/shrub planting: i.e i)Trimming of hedges/shrubs once in 15 days,ii) Watering hedge/shrubs once in a day @ 5 litres /per sqm/per day (sub soil moisture shall be maintained continuously), iii)Formation of basins for each and every hedge up to 1'-0 ft away from the hedge and Application of fertilisers,insecticides,fungicides @ 20 gms/pit/sqmt) etc., as required and as directed by the Engineer-in-cahrge/ horticulturist for a period of 12 months complete. But excluding supply of water. | | 15215 | 100 Sqm/month |
|---|
| 3 | 3 | LAWN/GRASS:Maintenance of lawns:i) watering the lawns @ 10-15 litres /sqm/day basing on the season and weather conditions (sub soil moisture shall be maintained continuously) ii)Lawn mowing and edging of the lawns in the following frequency. Keeping the lawn grass blade not more than 2 cms .i)(june to November -once in 15 days . ii) December to May -once in 30 days . iii)Edging of the lawns in such a way that the lawn grass do not penetrate in tothe plants and in a defined perfect geometric shapes or smooth curves. iv) Keeping the lawns always in lush green & weedfree condition. v) Application of fertilisers,insecticides,fungicides etc. with manual watering for a period of 12 months etc., as directed by the Engineer-in-charge / Horticulturist, complete. but excluding supply of water | | 126840 | 100 Sqm/month |
|---|
| 4 | 4 | TOPIARY/PALMS/TREE PLANTING/ INDIVIDUAL SHRUBS Etc.,Maintenance of Individual shrubs,rose plants,topiary, ornamental bamboo and palms etc., i.e i)Trimming once in 15 days,i) Watering once in a day @ 5 litres /per plant/per day (sub soil moisture shall be maintained continuously) iii)Formation of basins for each and every plant upto 1'-0 ft away from the plant. iv)Application of fertilisers,insecticides, fungicides (@ 20 gms/pit/sqmt) etc., with manual watering for a period of 12 months etc., as directed by the Engineer-in-charge/ Horticultrist, complete, but excluding supply of water | | 194712 | 100 plants / month |
|---|
| 5 | 5 | Water supply :Supplying and transportation of drinking water in tankers including water tanker filling, and delivery of water at site of work , crew charges ,fuel charges, hire charges, waiting charges, hose pipes, and taxes if any with all .equipments and charges etc as required & as directed by the EIC ,Complete.All hire and operational charges .(Water will be supplied by Port and the Water charge is recoverable.) | | 19726 | KL |
|---|
| 6 | 6 | supply the following various types of plantmaterials to site of work including transportation,loading ,unloading and stacking etc., as directed by the Engineer-in-Charge /Horticulturist, complete. All Labour and materials. | | | |
|---|
| 7 | 6.1 | A) Wodyetia Bifurcata(21\"x21\")ht 9 to 10.0ft | | 12 | 1 No. |
|---|
| 8 | 6.2 | B) Bogunvillliea Thimma creeper :(13\"x13\")ht 2.0ft | | 500 | 1 No. |
|---|
| 9 | 6.3 | C) Bismarkia nobilisa(21?x21\") 3.0ft | | 4 | 1 No. |
|---|
| 10 | 7 | supply of Korean carpet grass of approved quality in good condition including cost of grass transportation, loading ,unloading and stacking etc., as directed by the EIC/Harticulturist, complete. All Labour and materials. | | 400 | 1 m2 |
|---|
| 11 | 8 | Planting of bag plants after refilling the pits/ supporting sticks etc., as required and as directed by the Engineer-in-charge/ Horticulturist, complete. All labour and materials. for bag sizes 10\"x16\", 12\"x16\", 14\"x18\" &16\"x18\" | | 516 | 100 Plants |
|---|
| 12 | 9 | Supplying and stacking good earth, tank silt or alluvial soil at site (at desired points) good earth to be obtained from the approved source and measured in stacks and 20% deduction will be made for voids to arrive net quantity etc., as required and as directed by the Engineer-in-charge/ Horticulturist, complete. All Labour and materials. | | 36 | 1 m3 |
|---|
| 13 | 10 | Supplying cattle manure at site of work including stacking etc., as required and as directed by the Engineer-in-Charge, complete. All labour and materials | | 12 | 1 m3 |
|---|
| 14 | 11 | Supplying verme compost at site of work etc., as required and as directed by the Engineer-in-Charge, complete. All labour and materials | | 5000 | 1 kg |
|---|
| 15 | 12 | Supplying Urea at site of work etc., as required and as directed by the Engineer-in-Charge, complete. All labour and materials | | 4800 | 1 kg |
|---|
| 16 | 13 | Mixing earth and sludge or manure in proportion as specified by the horticulturist and spreading sludge from yards & mannure and good earth in required thickness etc., as directed by the Engineer-in-charge/ Horticulturist, complete | | 48 | 1 m3 |
|---|
| 17 | 14 | Carpet grass laying and ramming etc., as directed by the Engineer-in-charge /Horticulturist, complete. | | 400 | 1 m2 |
|---|
| 18 | 15 | Supplying DAP at site of work etc., as required and as directed by the Engineer-in-Charge / Horticulturist, complete. All labour and materials | | 1000 | 1 kg |
|---|