Agriculture Cooperative Closing in 0 days TDR #24874604

Competitive E-Bidding For Fabrication, Erection And Dismantling From Reputed Contractors

Issued by Cooperative · Hasanpur Amroha, Uttar Pradesh
Tender Value
13 Lakhs
Estimated cost
Bid Submission
20 Jul 2020
0 days left
EMD
25000
Bank guarantee accepted
Document Fee
590
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Hasanpur Amroha → Uttar Pradesh
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Competitive E-Bidding For Fabrication, Erection And Dismantling From Reputed Contractors-2 General Work 3 Dismantling Of M.S. Pipe 2 Cm To 35 Cm Size. 4 Erection Of M.S. Pipe 2 Cm To 35 Cm Size. 5 Dismantling , Fabrication And Erection Of Pipe Fitting Size 2Cm To 35 Cm 6 Bend 7 Flange 8 Nipple 9 Cross / Tee 10 Valve 11 Reducer 12 Dismantling Of M.S. Pipe Above To 35 Cm Size & Shifting It To Scrap Yard. 13 Fabrication And Erection Of M.S. Pipe Above To 35 Cm Size By 6 / 8 / 10 Mm Plate. 14 Dismantling , Fabrication And Erection Of Pipe Fitting Above 35 Cm Size. 15 Bend 16 Reducer 17 Nipple 18 Cross / Tee 19 Valve 20 Dismantling Of Old Bed And Fabrication, Erection, Alignment & Trial Of New Bed Of Motor, Pump Or R / G Box. 21 10 Hp To 20 Hp 22 25 Hp To 60 Hp 23 75 Hp To 125 Hp 24 150 Hp To 250 Hp 25 Patching Work In Different Type Of Rectanglur, Square & Ciruler Old Equipments By New / Old Plate As Available. 26 Dismantling Of Old Rectangular / Circular Tank And Shifting Them To Scrap Yard. 27 Fabrication And Erection Of New Rectangular / Circular Tank By New / Old Plate. 28 Flat Bottom 29 Conical Bottom 30 Dismantling Of Light Structure 31 Fabrication And Erection Of Light Structure. 32 Dismantling Of Heavy Structure. 33 Fabrication And Erection Of Heavy Structure. 34 Replacement Of Old Worn-Out Platform By New Or Old Plate. 35 Fabrication And Fitting Of Shed By Old G.I. Sheet For Db, Motor Etc In Different Places. 36 Repairing Of Trusses Of Mill House, Boiling House Etc By Welding Or Fitting Missing Or Worn-Out Nut And Bolts. 37 Straightening Bent M.S. Plates For Reuse. 38 Dismantling Fabrication And Erection Of Header With Flange And Nipple Etc. 39 Size 2.5 Cm To 12.5 Cm 40 Size 15 Cm To 30 Cm 41 Replacement Of Cone Of Different Equipments By Old / New M.S. Plate. 42 Up To 1 Meter Dia 43 Above 1 Meter Dia 44 Repairing Of M.S. Gutter At Different Places. 45 Fabrication And Erection Of New Gutter In Place Of Worn-Out Gutters By Old / New Plates. 46 Fabrication And Erection Of New Gutter By Old / New M.S. Plate. 47 Repairing Of Worn-Out Column And Beam In Mill 48 Dismantling Of Worn-Out Coils And Fabrication Erection Of New Coil By New Pipe. 49 Fabrication Of Electric Pole Up To 27 Long With Base By 4, 6, 8 Old Or New Pipes. Cross Arm To Be Fitted. 50 Fabrication And Erection Of Step Type Stairs With Railing Etc For Different Places. 51 Mill House 52 Forzing Of Cane Carrier / Bagasse Carrier Side Links As Per Required Size. 53 Dismantling And Erection Of Worn-Out Runner Of Cane Carrier / Src / Rake Carrier / Bagasse Elevator / Rbc. 54 Repairing Of Old Rakes Of S.R.C. / Inter Rake Carrier. 55 Repairing Of R.B.C. And Bagasse Elevator Slates 56 Fabrication Of New Rakes For Src / Inter Rake Carrier By M.S. Plate 57 Replacement Of Worn Out Side Plate Of Rake Carrier / Bagasse Elevator / Rbc / Up To 300 Mm Height By New / Old Plate. 58 Replacement Of Worn Out Side Plate Of Cane Carrier By New / Old Plate And Strengthening Of Its Lower Side Support. 59 Dismantling And Erection Of Side & Bottom Plate Of Src / Rake Carrier / Bagasse Elevator & Rbc Above To 300 Mm Size. Flat And Angle To Be Fitted Out Side Of Bottom Plate For Strengthening. 60 Fabrication & Erection Of Guide In Cane Carrier / Src / Bagasse Elevator And Rbc By Bending Angle And Plate. 61 Dismantling Of Worn-Out Box Of Src / Rake Carrier And Erection Of New Box In Place Of It. 62 150 X 150 Mm 63 200 X 200 Mm 64 Replacement Of Weak Side And Top Plate From Cane Chopper To Fibrizer By Old / New Plate. 65 Fabrication And Erection Of Juice Distribution Chute. 66 Dismantling Of Worn Out Rail Of Cane Unloader And Erection Of New Rail At Its Place. 67 Dismantling Of Worn-Out Squire Bar Of Unloader And Erecting Of New Squire Bar At Its Place. 68 Dismantling Of Bottom And Side Worn Out Portion Of D.S.M. Screen And Fitting Of New Plate In Its Place. 69 Dismantling Of Old Screw Conveyor And Fabrication And Erection Of New Screw Conveyor In Its Place According To Size 70 Replacement Of Worn Out Portion Of Bottom Trough Of Screw Conveyor By New / Old Plate 71 Half Circumference Portion 72 Hole Type Half Circumference Portion By M.S. Plate 73 Hole Type Half Circumference Portion By S.S. Plate 74 Repairing Of Defective Tawas Of Mill Screw Conveyor. 75 Hard Facing Work Of Mill Roller Crown Pinion Teethes. 76 Replacemen Of Worn-Out Angle / Channel / Beam Of Cane Carrier / Rake Carrier / Bagasse Elevator And Rbc. 77 Angle 78 Chanel 79 Beam 80 Fabrication And Erection Of Trpf Rollers Top & Bottom Cover By New / Old M.S. Plate 81 Hard Facing Work Of Trpf Rollers Shell And Teeth. 82 Dismantling Of Mill Head Stock And Its Erection Accordingly With All Accessories. 83 Line Level Of Inter Rake Carrier And Worn Out Side Plates Of Tail And Driving End Shafts Guides To Be Replace By M.S. Plate. Erection After Line Alignment With Satisfactory Trial. 84 Fabrication And Erection Of Mill Pressure Chute By New M.S. Plate. Lining Of S.S. Plate To Be Fitted On It And Strengthening Of Top And Bottom Plate To Be Done. Fitting Accordingly As Per Old Chute To Be Done. 85 Replacement Of Old S.S. Lining Of Pressure Chute . New S.S. Lining To Be Fitted Accordingly As Per Old Chute. Assembly And Strengthening To Be Done. 86 Bagacilo Screens Of Bagasse Elevator To Be Taken Out And Their Fitting To Proper Place After Repairing / Setting Them Straight / Right. 87 Checking Of Mill Juice Tray, Replacement Of Worn Out Portion, Arresting Of Leakages With Welding Of S.S. / M.S. Electrodes With Satisfactory Trial. 88 Repairing Work Of Worn Out Blades Of Bagacillo Blower With Satisfactory Trial. 89 Fabrication Erection And Satisfactory Trial Work Of New Bagacillo Blower. 90 Dismantling Of Worn-Out Deflector Plate Of Fibrizer With Beam. Fabrication And Erection Of New Deflector Plate Accordingly As Perold Plate. 91 Cane Carriers All Three Runners Beams Line Alignment And Level To Be Set Right And Satisfactory Trial Work To Be Done. 92 Line Alignment Work Of Head And Tail End Shaft Of Secondary Rake Carrier / Irc To Be Done. Its Worn Out Runner And Angle To Be Replaced And Satisfactory Trial To Be Done. 93 Boiler House 94 Fabrication Of New Rakes For Rbc And Bagasse Elevator. Approximate Weight Of 01 Rake Is 12 Kg. 95 Repairing Of Old Rakes Of Rbc And Bagasse Elevator. 96 Replacement Of Worn Out Portion Of Boiler Flue Gas / Air Heater Ducting By Old / New Plate. 97 Patching Work Over Worn Out Portion Of Boiler Flue Gas Ducting By Old / New Plate. 98 After Dismantling Of Old Flue Gas Ducting Damper, New Damper To Be Fabricated And Erected. 99 After Dismantling Of Old F.D. Fan Air Ducting Damper, New Damper To Be Fabricated And Erected. 100 Repairing Of Bagasse Feeding Sliding Gate Of Boilers . 101 Erection Of Id Fan Casing After Replacement Or Patching Of Worn Out Portion Of It By Old / New Plate. 102 Fabrication And Erection Of Worn Out Bagasse Feeding Chute Of Boilers By Old / New Plates. 103 Repairing / Replacing Of Old Worn Out Fins Of 20 Ton Boilers Economizer Tube. 104 Dismantling , Modification And Erection Of Boiler Flue Gas Ducting As Per Instruction. 105 After Dismantling Worn Out Wear Plate Of Id Fan Impeller Vain, New Plate To Be Fitted And Hard Faced As Per Instruction. 106 Fabrication And Erection Of New Suction Cone Of Boiler Id Fan By Old / New Plate. 107 Worn-Out Portion Of Boiler Ash Discharge Chute To Be Taken Out. Fabrication And Erection Of New Ash Discharge Chute Of Boilers. 108 Replacement Of Old Tubes Of Air Heater By New Tubes. 109 Fabrication Of Old Tubes Of Boilers According To The Size Of Air Heater Tubes And Their Erection To Air Heater. 110 Dismantling Of Old I.D. Fan With Casing Of Boilers And Shifting It To Scrap Yard And Erection Of New I.D. Fan With Casing And Inlet , Outlet Connections In Its Place And Satisfactory Trial To Be Done. 111 Dismantling Of Old I.D. Fan And Erection Of New I.D. Fan Inplace Of Old One With Satisfactory Trial. 112 Boiling House 113 Old Brass / Ss Tubes Of Quad / Juice Heater / Pans To Be Taken Out And Depositing Them To Store. New Tubes To Be Fitted, Expended And To Be Trialed At 80 Lbs Pressure. 114 Juice Heater / Semikestner 115 Vapor Shell / Quad / Pan 116 Weak Save All Of Quad / Pans To Be Repaired By New / Old Plate And To Fit / Erect Them. 117 Fabrication And Erection Work Of Save-All By 8 Mm M.S. Plate In Place Of Quad / Pans Worn-Out Save-All According To Instructions. Satisfactory Trial Is Needed. 118 Fabrication And Erection Of Steiner With Nipple In Place Of Raw Juice / Sulphited Juice / Syrup / Melter Pumps Worn Out / Old Strainers. 119 Weak Catchers Worn Out Portion Of Quad / Pan To Be Taken Out. Repairing To Be Done By Provided Plates. Fins To Be Prepared And Fitted To Them. 120 Top And Bottom Portion Worn-Out Partition Plate Of Juice Heater / Vapor Line Juice Heater Dismantling And New Partition Plate Fabrication Erection Work To Be Done . 121 For Fitting Of Rubber Strip On Partition Plate Of Juice Heater / Vapor Line Juice Heater, Flat Iron To Be Fitted According To Instruction And Rubber Strip To Be Fitted And Trial To Be Done. 122 Dismantling, Fabrication And Erection Of Worn Out Condenser Of Vacuum Filter Along With All Connections And Satisfactory Trial. 123 Dismantling Fabrication Erection Of Condensate Bottle Of Quad / Semekestner / Vapor Cell / Juice Heater Along With All Connections. Dismantled Material To Be Shifted To Scrap Yard. 124 Repairing Work Of Aerator Of Effluent Treatment Plant. 125 C.I.Cross 6 Size Dismantling Fabrication And Erection Work At Sulphur Station. Blinds To Be Fitted To Both End Of Cross. 126 Dismantling Fabrication And Erection Work Of Steiner For Spray / Injection Pump Suction Pipe. 127 Dismantling Of Worn-Out Portion Of Vacuum Filter Trough . Plate To Be Bend According To Size And To Be Fitted In Trough. 128 Dismantling Fabrication And Erection Of Channel And Beam Of Condenser. 129 Quad / Pan Entrainment Catcher Inside Worn-Out Channel, Angle Dismantling And New Channel, Angle Erection Work. 130 6 Size Worn Out Coils Of Clarifier Dismantling, New Fabricating Erection With Nipple And Trial To Be Done. 131 Dismantling Of Worn-Out Down Take Of Semikestner, Vapor Cell, Quad, Pan And Fabrication Erection Of New Down Take By 6 / 8 Mm Plate With Trial. 132 Crystallizers Broken / Tilted Arms To Be Taken Out. After Repairing Them Or Making New To Be Fitted To Proper Place And Trial To Be Given. 133 40 / 60 Ton Pan Discharge Valves Worn Out Body / Chute Dismantling Work And Fabrication Erection Work Of New Body / Chute. 134 Weak Catcher Of Quad And Pans Dismantling Work And Fabrication Erection Work Of New Catcher According To Instructions. 135 Crystallizers Worn-Out Gland, Bush, Replacing Work, Shaft Repairing Work , Worm Wheel Opening And Fitting Work And Satisfactory Trial To Be Given. 136 Spray System Pipe Line Blinds To Be Opened, Cleaned And To Be Fitted After Cleaning With Satisfactory Trial. 137 Spray System Worn Out Branch Pipe Line Dismantling And New Branch Line Erection Work And Satisfactory Trial To Be Done. 138 Quad / Pan Worn-Out Umbrella Dismantling And New Umbrella Fabrication Erection Work To Be Done. 139 Weak Syrup / Molasses Tanks Of Pan Station To Be Taken Out .New Tanks To Be Fabricate And Erect By 6 / 8 Mm Thick Plate. Braising Of Angles To Be Provided Along With Necessary Connection To Tanks. 140 Vapor Shell / Semikestner / Quad Pans Worn Out Ammonia Coil Dismantling And New Ammonia Coil Fabrication Erction Work With Trial. 141 Sugar Hopper Weak And Worn Out Driving Unit / Trough To Be Dismantled. Fabrication And Erection Of New Drive Unit / Trough With Angle . Trial To Be Done. 142 Fabrication And Erection Of New Chute Of S.D. Machine Pug Mill Gate. 143 A Machines Old Hood Dismantling And New Hood Fabrication Erection Work . 144 Fabrication Of New Bucket As Per Sample For Dry Seed Elevator / Sugar Elevator. 145 Fabrication And Erection Of Stirrer To Molasses Condenser Of Pan Station. By Making Bed Plate , Motor Reduction Gear To Be Fitted For Operating Stirrer. Satisfactory Trial To Be Done. 146 Fabrication And Erection Of New Coil By Pipe For Super Heated Wash Water System. Hydraulic Testing To Be Done. 147 Broken Shaft Of Pug Mill Drive To Be Linked To Proper Place. New Flange Type Coupling To Be Made Fit To Fit In It . Rib To Be Provided According To Instruction. 148 New Belt Conveyor Is To Be Fabricated And Fitted On 8 X 16 Vacuum Filter With Satisfactory Trial. 149 New Coil For D Super Heater Is To Be Fabricated And To Be Fitted As Directed With Nozzles And Satisfactory Trial Is To Be Given. 150 Fabrication, Erection With Shaft And Satisfactory Trial Of Screw Conveyor For Vacuum Filter Mud Mixture. 151 Dismantling, Fabrication And Erection Of Vacuum Filter Mud Mixture With Satisfactory Trial. 152 Vacuum Crystallizer Weak And Worn-Out Shell Dismantling Work And Fabrication Erection Of New Shell In Its Place. 153 Dismantling And Erection Of Worn-Out Beam / Channel Of Centrifugal Machine . 154 Clarifier Top And Flocculaty Chamber Worn Out Plate Dismantling Work And Fabrication Erection By New Plate. Leak Proof Trial To Be Done. 155 Sulphur Furnace Weak And Worn Out Body Shell With Water Jacket To Be Dismantled And Shift To Scrap Yard. Fabrication Erection Of New Shell And Water Jacket Alongwith All Necessary Connections. Leak Proof Trial To Be Done. 156 Vacuum Filter Weak And Worn Out Filtrate Bottle To Be Dismantled And Shift To Scrap Yard. Fabrication And Erection Of New Bottle Along With All Connections. Leak Proof Trial To Be Done. 157 Sulphur Furnace Cooler Worn Out Coil Pipe To Be Taken Out , New Pipe To Be Fitted And Leak Proof Trial To Be Done. 158 Worn Out Quad / Juice Heater Condensate Bottle To Be Dismantled And Shift To Scrap Yard. Fabrication And Erection Of New Bottle With Partition Plate In Its Place. Trial To Be Given. 159 Replacement Of Partition Plate Of Quad / Juice Heater Condensate Bottle. 160 Junction Box Of Spray Pipe Line To Be Opened, Taken Out, Their Pipes And Nozzles To Be Cleaned And O Fit Them Again After Necessary Repairing . 161 Weak And Worn Out Portion Of Spray / Injection Pump Suction Pipe To Be Taken Out And To Repair By New / Old Plates. 162 Weak And Worn-Out Duck Foot Bend Of Pan / Quad Tail Pipe To Be Dismantled. Fabrication And Erection Of New Duck Foot Bend In Its Place. 163 Agitator Of Vacuum Filter To Be Repaired. 164 For Hydraulic Testing Of Vapor Line Juice Heater M.S. Pipe Blinds Be Provided Inside Suction And Delivery Vapor Pipe Of V.L.J.H. And Blinds Be Taken Out After Hydraulic Testing. 165 Exhaust Vapor Valve To Be Opened Its Weak Portion To Be Patched By 8 / 10 Mm Thick Plate. Assembled After Patching And Leak Proof Trial To Be Done. 166 Juice / Syrup Sulphiter Recovery Tower Worn Out Shell Size 1 Meter Dia X 3 Meter Height To Be Dismantled And To Shift Scrap Yard . Fabrication And Erection Of Above Shell By Old / New Plate According To Drawing. Leak Proof Trial To Be Done. 167 Dismantling Of Worn Out Melter Of Sulphur Furnace, Shifting It To Scrap Yard. Fabrication And Erection Of New Melter By 8 / 10 Mm Plate. Coils To Be Made And To Erect It By New Pipe. Trial To Be Done. 168 Dismantling Of Worn Out Circular Tank Of Juice / Water / Molasses Weighing Scale. Fabrication And Erection Of New Tank By Provided Old / New Plates. Its Valve Seat Work To Be Done And Trial To Be Done. 169 Dismantling Of Worn Out Spruzer Of Juiced Sulphiter. Fabrication And Erection Of Spruzer By New Pipe. Leak Proof Trial To Be Done. 170 Dismantling Of Worn Out Mud Distribution Box Of Clarifier. Fabrication And Erection Of New Mud Distribution Box By New Plate. Trial To Be Done. 171 Worn-Out Agitator Of Vacuum Filter Is To Be Taken Out And New Is To Be Fabricated And Fitted. Satisfactory Trial Is To Be Given. 172 Partition Plate Of Compartment Of Clarifier To Be Replaced 173 Dismantling Of Clarifier Flash Tank. New To Be Erected. Its Worn-Out Pipe To Be Replaced And Leak Proof Trial To Be Done. 174 Dismantling Of Weak Shell And Top Of 40 Ton Cap Pan And Shifting It To Scrap Yard. Fabrication And Erection Of New Shall And Top. 175 Dismantling Of Weak Shell And Top 60 Ton Cap Pan And Shifting It To Scrap Yard. Fabrication And Erection Of New Shell And Top By New / Old Plate. 176 Dismantling Of Save-All Of Top Cone Of 60 Ton Pan And Shifting It To Scrap Yard. Fabrication And Erection Of New Save-All Top Cone In Its Place. Trial To Be Done. 177 Dismantling Of Save-All Of Top Cone Of 40 Ton Pan And Shifting It To Scrap Yard. Fabrication And Erection Of New Save-All Top Cone In Its Place. Trial To Be Done. 178 60 / 40 Ton Pans Discharge Valve Bearing Housings Plate To Be Replaced By New Plate And Trial To Be Done. 179 60 / 40 Ton Pans Condensers Tail Pipes Duck Foot Bend To Be Dismantled And Fabrication Erection Of New Duck Foot Bend To Be Done By New Plate And Trial To Be Done. 180 Dismantling Of Worn Out Shell And Bottom Of Juice Sulphiter. Fabrication And Erection Of New Shell And Bottom By 8 / 10 Mm Thick Plate With Juice, Gas And Lime Line Connection .Partition Plate And Stirrer To Be Fitted To Proper Place In Side Sulphiter. Satisfactory Trial To Be Done. 181 Dismantling Of Worn Out Coolers Of Sulphur Furnace. Fabrication And Erection Of Coolers By 8 Mm M.S. Plate. Cooling Pipe, Gas Pipe Connection To Be Done. Satisfactory Trial To Be Done. And Dismantled Material To Be Shifted In Scrap Yard. 182 Weak Lower Portion Of Shell Of Sulphur Furnace Coolers To Be Dismantled. Fabrication Erection To Be Done. Worn-Out Cooler Pipes To Be Replaced. 183 Dismantling Fabrication Erection Of Weak Roof Of Clarifier By 8 Mm Thick Plate. Weak Tray Of Dorr To Be Taken Out And 6Mm Thick Plate To Be Patched In Its Place. 184 Dismantling Of Worn Out Catcher Bottle Of Vacuum Filter. Fabrication And Erection Of New Catcher Bottle In Its Place. All Connections And Trials To Be Done. 185 Dismantling Of Worn Out Cyclone Of Vacuum Filter Station. Fabrication And Erection Of New Cyclones By 3 / 5 Mm Thick Plate With Satisfactory Trial. 186 800 M² Old Semikestner Worn Out Roof, Bottom And 30 % Shall To Be Dismantled. Fabrication And Erection To Be Done By 10 Mm Thick Plate And Trial To Be Done. 187 Quad Body Weak Bottom To Be Dismantled. Fabrication And Erection To Be Done By Old Or New Plate. All Connections To Be Done . Trial To Be Done. 188 Spray / Injection Pumps Delivery Headers Weak Portion To Be Dismantled. New To Be Fabricated By New / Old Plates And Erected With Satisfactory Trial. 189 Dismantling Of 3 Size Worn Out Steam Coil Of B Heavy Molasses Conditioner And Fabrication Erection Of New Coil With Its Trial. 190 Fabrication And Erection Of Sulphur Furnace Melter Coil In Place Of Worn-Out Coil With All Connections And Satisfactory Trial. 191 Dismantling Of Old Worn Out Air Plate Of Hopper . Fabrication And Erection Of New Plate By 3Mm New M.S. Plate In Its Place. 192 Old Tank Of A Light And A Molasses To Be Dismantled. New To Be Fabricated By 6 / 8 Mm M.S. Plate And Erected In Its Place. Satisfactory Trial To Be Done. 193 All 04 No Fins Of Pan No. 7 Mechanical Circulator To Be Taken Out. New Fins With Housing To Be Erected In Its Place. Trial To Be Done. 194 Worn Out Bottom Portion Of B Heavy Molasses Conditioner To Be Dismantled. New To Be Fabricated By 6 / 8 Mm M.S. Plate And Erected In Its Place. 195 Worn Out Circular Bottom Plate Of Crystallizer To Be Dismantled. New To Be Fabricated By New M.S. Plate And Erected In Its Plate. Leek Proof Trial To Be Done. 196 Dismantling Of Complete Shell Of 60 Ton Pan And Shift It To Scrap Yard. Fabrication And Erection Of Complete Shell Of 60 Ton Pan By 10 / 12 Mm Thick Plate. Satisfactory Water And Vacuum Trial To Be Given. 197 Dismantling Of Save-All Dome Of 60 Ton Pan And Shift It To Scrap Yard. Fabrication And Erection Of Save-All Dome Of 60 Ton Pan By 10 / 12 Mm Thick Plate. Satisfactory Water And Vacuum Trial To Be Given. 198 Syrup Sulphiter Weak And Worn Out Portion Of Shell To Be Dismantled And Shift It To Scrap Yard. Fabrication And Erection Of Above Shell By Provided New Plate Of 8 Mm Thick. Satisfactory Trial To Be Given. 199 Dismantling Of Weak Old Hot Water Overhead Tank And Condensate Water Receiving Tank Of Pan And Shift Them To Scrap Yard. Fabrication And Erection Of New Tanks By 8 / 10 Mm Thick Plate With All Necessary Connections. 200 Dismantling Of Worn-Out Baffle Plate Of Juice Sulphiter And Shifting It To Scrap Yard. Fabrication And Erection Of New Baffle Plate In Its Place. 201 Dismantling Of Worn-Out Dorr Clear Juice Distribution Box And Shifting It To Scrap Yard. Fabrication And Erection Of New Clear Juice Distribution Box In Its Place With All Connections. 202 Dismantling Of Old Trough Of Hoppers And Shifting Them To Scrap Yard. Fabrication And Erection Of New Trough With Support Angle And Fitting Of Wooden Strip. Satisfactory Trial To Be Given. 203 Erection Of Magma Mixture For B Or C C / F M / C With Its Drive System, Bed And All Pipe Line Connection. Satisfactory Trial Is To Be Given. 204 Dismantling Of All 03 Sulphur Furnaces With Their Auxiliary Equipments, Accessories And Pipe Lines From Old Plate Farm And Shift Them To Directed Place And Their Erection At New Platform Along With All Equipments, Connections And Satisfactory Trial. 205 Dismantling Of Clarifier Central Shaft With Stirrer Arms And R.G. Box. Fabrication And Erection Of New Central Shaft With All Accessories. Satisfactory Trial To Be Given. 206 Dismantling Of Old Juice Sulphiter / Clear Juice / Syrup Receiving Bottle And Shifting Them To Scrap Yard. Fabrication And Erection Of New Bottle With All Connections. Satisfactory Trial To Be Given. 207 Fabrication And Erection Of B And C C / F M / C Top Cover By Provided New / Old M.S. Plate With Satisfactory Trial. 208 Fabrication And Erection Of B And C C / F M / C Molasses Separator By Provided New / Old M.S. Plate And Satisfactory Trial To Be Given. 209 Fitting Of Diffusers In Aeration Tank With All Connections And Satisfactory Trial To Be Given. 210 Fabrication Of M.S. Perforated Box Of Size 1½ ?X 1 X 2 ? And Fitting It In Mgf / Acf 211 Dismantling Of A Centrifugal Machine Size Kcp 32 ? X 49 ? With Its Pug Mill, Column And Structure And Sift It To Directed Place. 212 Repairing Of Pugmill With Drive Arms By Providing Plates And Angle. Satisfactory Trial To Be Given. 213 Dismantling Of Old Trough Of Hopper And Shifting Them To Scrap Yard. Fabrication And Erection Of New Trough With Dubbing Plate, And Wooden Connecting Rod Housing In Those Places. Satisfactory Trial To Be Given.

BOQ

Name of Work: COMPETITIVE e-bidding FOR Fabrication, Erection and dismantling from reputed Contractors
Sl.No.ParticularsItem Code / MakeQuantityUnits
11Febrication
21.01General Workitem11do not write in this line
31.02Dismantling of M.S. pipe 2 cm to 35 cm size.item21P CM dia P mtr
41.03Erection of M.S. pipe 2 cm to 35 cm size.item31P CM dia P mtr
51.04Dismantling ,fabrication and erection of Pipe fitting size 2cm to 35 cmitem41do not write in this line
61.05Benditem51per cm dia per no
71.06Flangeitem61per cm dia per no
81.07Nippleitem71per cm dia per no
91.08Cross/Teeitem81per cm dia per no
101.09Valveitem91per cm dia per no
111.1Reduceritem101per cm dia per no
121.11Dismantling of M.S. pipe above to 35 cm size & shifting it to scrap yard.item111Per Ton
131.12Fabrication and erection of M.S. Pipe above to 35 cm size by 6/8/10 mm plate.item121Per Ton
141.13Dismantling ,fabrication and erection of Pipe fitting above 35 cm size.item131do not write in this line
151.14Benditem141Per Ton.
161.15Reduceritem151Per Ton.
171.16Nippleitem161Per Ton.
181.17Cross/Teeitem171Per Ton.
191.18Valveitem181per cm \ per no
201.19Dismantling of old bed and fabrication, erection, alignment & trial of new bed of Motor, Pump or R/G box.item191do not write in this line
211.210 HP to 20 HPitem201per Bed
221.2125 HP to 60 HPitem211per Bed
231.2275 HP to 125 HPitem221per Bed
241.23150 HP to 250 HPitem231per Bed
251.24Patching work in different type of rectanglur,Square & ciruler old equipments by new/old plate as available.item241per m²
261.25dismantling of old Rectangular/circular tank and shifting them to scrap yard.item251Per ton
271.26Fabrication and erection of new Rectangular/circular tank by new/old Plate.item261do not write in this line
281.27Flat Bottomitem271Per ton
291.28Conical Bottomitem281Per ton
301.29Dismantling of light structureitem291per ton
311.3Fabrication and erection of light structure.item301per ton
321.31Dismantling of Heavy structure.item311per ton
331.32Fabrication and erection of heavy structure.item321Per ton
341.33Replacement of old worn-out platform by new or old plate.item331per m²
351.34Fabrication and fitting of Shed by old G.I. Sheet for DB, Motor etc in different places.item341per m²
361.35Repairing of trusses of Mill House, Boiling House etc by welding or fitting missing or worn-out nut and bolts.item351Per Trush
371.36Straightening bent M.S. Plates for reuse.item361per m²
381.37dismantling fabrication and erection of header with flange and nipple etc.item371do not write in this line
391.38Size 2.5 cm to 12.5 cmitem381per cm dia per m
401.39Size 15 cm to 30 cmitem391Per no
411.4Replacement of cone of different equipments by old/new M.S. Plate.item401do not write in this line
421.41Up to 1 meter diaitem411Per cone
431.42Above 1 meter diaitem421Per meter dia per cone
441.43Repairing of M.S. Gutter at different places.item431Per R.Meter
451.44Fabrication and erection of new gutter in place of worn-out gutters by old /new plates.item441per m²
461.45Fabrication and erection of new gutter by old / new M.S. plate.item451per m²
471.46Repairing of worn-out column and beam in millitem461Per R.Meter
481.47Dismantling of worn-out coils and fabrication erection of new coil by new pipe.item471P CM dia P mtr
491.48Fabrication of electric pole up to 27' long with base by 4\",6\",8\" old or new pipes. Cross arm to be fitted.item481Per no
501.49Fabrication and erection of Step type stairs with railing etc for different Places.item491per m
511.5MILL HOUSEitem501do not write in this line
521.51Forzing of Cane Carrier/Bagasse Carrier side links as per required size.item511per link
531.52Dismantling and erection of worn-out runner of Cane carrier/SRC/Rake Carrier/Bagasse Elevator /RBC.item521Per Running meter
541.53Repairing of Old rakes of S.R.C./Inter Rake carrier.item531per rake
551.54Repairing of R.B.C. and Bagasse Elevator Slatesitem541Per Slate
561.55Fabrication of new rakes for SRC/Inter rake carrier by M.S. plateitem551per rake
571.56Replacement of worn out side plate of Rake Carrier/Bagasse Elevator/RBC/up to 300 mm height by new / old plate.item561Per Running meter
581.57Replacement of worn out side plate of cane carrier by new /old plate and strengthening of its lower side support.item571per m²
591.58Dismantling and erection of side & bottom plate of SRC/Rake Carrier/Bagasse elevator & RBC above to 300 mm size. Flat and angle to be fitted out side of bottom plate for strengthening.item581per m²
601.59Fabrication & erection of guide in Cane Carrier/SRC/Bagasse elevator and RBC by bending angle and plate.item591per meter
611.6Dismantling of worn-out box of SRC/Rake Carrier and erection of new box in place of it.item601do not write in this line
621.61150 x 150 mmitem611per meter
631.62200 x 200 mmitem621per meter
641.63Replacement of weak side and top plate from Cane chopper to Fibrizer by old / new plate.item631per m²
651.64Fabrication and Erection of Juice distribution Chute.item641Per chute
661.65Dismantling of worn out rail of cane unloader and erection of new rail at its place.item651Per meter
671.66Dismantling of worn-out squire bar of unloader and erecting of new squire bar at its place.item661Per meter
681.67Dismantling of bottom and side worn out portion of D.S.M. Screen and fitting of new plate in its place.item671per m²
691.68Dismantling of old screw conveyor and fabrication and erection of new screw conveyor in its place according to sizeitem681Per Screw conveyor
701.69Replacement of worn out portion of bottom trough of Screw Conveyor by new/old plateitem691do not write in this line
711.7Half Circumference portionitem701per meter
721.71Hole type half circumference portion by M.S. Plateitem711per meter
731.72Hole type half circumference portion by S.S. Plateitem721per meter
741.73Repairing of Defective Tawas of Mill Screw Conveyor.item731Per Tawas
751.74Hard facing work of Mill roller crown pinion teethes.item741per pinion
761.75Replacemen of Worn-out Angle/Channel/Beam of Cane Carrier/Rake Carrier/Bagasse Elevator and RBC.item751do not write in this line
771.76Angleitem761Per meter
781.77Chanelitem771per 100mm per M
791.78Beamitem781per 100mm per M
801.79Fabrication and erection of TRPF Rollers top & bottom cover by new/old M.S. Plateitem791per cover
811.8Hard facing work of TRPF roller's Shell and teeth.item801Per roller
821.81Dismantling of mill head stock and its erection accordingly with all accessories.item811Per head stock
831.82Line level of Inter Rake Carrier and worn out side plates of Tail and driving end shafts guides to be replace by M.S. Plate. Erection after line alignment with satisfactory trial.item821Per Rake Carrier
841.83Fabrication and erection of Mill pressure chute by new M.S. Plate. Lining of S.S. plate to be fitted on it and strengthening of top and bottom plate to be done. Fitting accordingly as per old chute to be done.item831Per Chute
851.84Replacement of old S.S. lining of Pressure Chute . New S.S. lining to be fitted accordingly as per old chute. Assembly and strengthening to be done.item841Per Chute
861.85Bagacilo screens of Bagasse elevator to be taken out and their fitting to proper place after repairing/setting them straight/right.item851Per screen
871.86Checking of Mill Juice tray, replacement of worn out portion, arresting of leakages with welding of S.S./M.S. Electrodes with satisfactory trial.item861Per Tray
881.87Repairing work of worn out Blades of Bagacillo blower with satisfactory trial.item871Per blower
891.88Fabrication erection and satisfactory trial work of new Bagacillo blower.item881Per blower
901.89Dismantling of Worn-out deflector plate of Fibrizer with beam. Fabrication and erection of new deflector plate accordingly as perold plate.item891per m²
911.9Cane Carrier's all three runners beams line alignment and level to be set right and satisfactory trial work to be done.item901per meter
921.91Line alignment work of head and tail end shaft of secondary rake carrier/ IRC to be done. Its worn out runner and angle to be replaced and satisfactory trial to be done.item91101 job LS
931.92BOILER HOUSEitem921do not write in this line
941.93Fabrication of new rakes for RBC and Bagasse elevator. Approximate weight of 01 rake is 12 Kg.item931Per Rake
951.94Repairing of old rakes of RBC and Bagasse Elevator.item941Per Rake
961.95Replacement of worn out portion of Boiler flue gas/Air heater ducting by old /new plate.item951per m²
971.96Patching work over worn out portion of Boiler flue gas ducting by old /new plate.item961per m²
981.97After dismantling of old flue gas ducting damper, new damper to be fabricated and erected.item971per damper
991.98After dismantling of old F.D. Fan air ducting damper, new damper to be fabricated and erected.item981per damper
1001.99Repairing of Bagasse feeding sliding gate of Boilers .item991Per gate
1012Erection of ID Fan casing after replacement or patching of worn out portion of it by old/ new plate.item1001per casing
1022.01Fabrication and erection of worn out Bagasse feeding chute of boilers by old/ new plates.item1011per chute
1032.02Repairing/replacing of old worn out fins of 20 ton boilers economizer tube.item1021per tube
1042.03Dismantling ,modification and erection of Boiler flue gas ducting as per instruction.item1031per m²
1052.04After dismantling worn out wear plate of ID fan impeller vain, new plate to be fitted and hard faced as per instruction.item1041Per vain
1062.05Fabrication and erection of new suction cone of Boiler ID Fan by old/new plate.item1051Per cone
1072.06Worn-out portion of Boiler Ash discharge chute to be taken out. Fabrication and erection of new Ash discharge chute of boilers.item1061per m²
1082.07Replacement of old tubes of Air heater by new tubes.item1071per tube
1092.08Fabrication of old tubes of boilers according to the size of Air heater tubes and their erection to Air heater.item1081per tube
1102.09Dismantling of old I.D. Fan with casing of Boilers and shifting it to scrap yard and erection of new I.D. Fan with casing and inlet , outlet connections in its place and satisfactory trial to be done.item1091Per no
1112.1Dismantling of Old I.D. Fan and erection of New I.D. Fan inplace of old one with satisfactory trial.item1101Per no
1122.11BOILING HOUSEitem1111do not write in this line
1132.12Old Brass/SS Tubes of Quad/ Juice Heater/Pans to be taken out and depositing them to Store. New tubes to be fitted, expended and to be trialed at 80 lbs pressure.item1121do not write in this line
1142.13Juice Heater/ Semikestneritem1131Per tube
1152.14Vapor Shell/ Quad /Panitem1141per tube
1162.15Weak save all of Quad /Pans to be repaired by new/old plate and to fit/erect them.item1151per ton
1172.16Fabrication and erection work of Save-all by 8 mm M.S. Plate in place of Quad/Pans worn-out Save-all according to instructions. Satisfactory trial is needed.item1161Per Save-all
1182.17Fabrication and erection of Steiner with nipple in place of Raw Juice/Sulphited Juice/Syrup/Melter pump's worn out/old strainers.item1171Per Steiner
1192.18Weak Catchers worn out portion of Quad /Pan to be taken out. Repairing to be done by provided plates. Fins to be prepared and fitted to them.item1181Per catcher
1202.19Top and bottom portion Worn-out Partition Plate of Juice heater/ Vapor line juice heater dismantling and new partition plate fabrication erection work to be done .item1191Per Juice heater
1212.2For fitting of rubber strip on partition plate of Juice heater/vapor line juice heater, Flat Iron to be fitted according to instruction and rubber strip to be fitted and trial to be done.item1201Per Juice heater
1222.21Dismantling, fabrication and erection of worn out condenser of vacuum filter along with all connections and satisfactory trial.item1211Per no.
1232.22Dismantling fabrication erection of Condensate bottle of Quad / Semekestner / Vapor cell / Juice heater along with all connections. Dismantled material to be shifted to scrap yard.item1221Per bottle
1242.23Repairing work of Aerator of Effluent treatment plant.item1231Per no
1252.24C.I.Cross 6\" size dismantling fabrication and erection work at Sulphur station. Blinds to be fitted to both end of cross.item1241Per Cross
1262.25Dismantling fabrication and erection work of Steiner for Spray/ Injection pump suction pipe.item1251Per strainer
1272.26Dismantling of worn-out portion of Vacuum filter trough . Plate to be bend according to size and to be fitted in trough.item1261per m²
1282.27Dismantling fabrication and erection of Channel and beam of condenser.item1271per no.
1292.28Quad /Pan entrainment catcher inside worn-out Channel, angle dismantling and new channel, angle erection work.item1281Per catcher
1302.296\" size worn out coils of Clarifier dismantling, new fabricating erection with nipple and trial to be done.item1291per no
1312.3Dismantling of worn-out down take of Semikestner, Vapor cell, Quad, Pan and fabrication erection of new down take by 6/8 mm plate with trial.item1301Per no
1322.31Crystallizers broken/tilted arms to be taken out. After repairing them or making new to be fitted to proper place and trial to be given.item1311Per Cryst
1332.3240/60 Ton Pan Discharge valves worn out Body / chute dismantling work and fabrication erection work of new body/chute.item1321Per Pan
1342.33Weak Catcher of Quad and Pans dismantling work and fabrication erection work of new catcher according to instructions.item1331Per ton
1352.34Crystallizers worn-out gland, bush, replacing work, Shaft repairing work , worm wheel opening and fitting work and satisfactory trial to be given.item1341Per Cryst
1362.35Spray system Pipe line blinds to be opened, cleaned and to be fitted after cleaning with satisfactory trial.item1351Per Set
1372.36Spray system worn out branch pipe line dismantling and new branch line erection work and satisfactory trial to be done.item1361Per set
1382.37Quad/Pan worn-out umbrella dismantling and new umbrella fabrication erection work to be done.item1371Per no
1392.38Weak Syrup/ Molasses tanks of Pan station to be taken out .New tanks to be fabricate and erect by 6/8 mm thick plate. Braising of angles to be provided along with necessary connection to tanks.item1381Per ton
1402.39Vapor Shell/ Semikestner/Quad Pans worn out Ammonia coil dismantling and new ammonia coil fabrication erction work with trial.item1391Per coil
1412.4Sugar hopper Weak and worn out driving unit / trough to be dismantled. Fabrication and erection of new drive unit/trough with angle . Trial to be done.item1401per m²
1422.41Fabrication and erection of new chute of S.D. Machine Pug mill gate.item1411Per no
1432.42A Machines Old hood dismantling and new hood fabrication erection work .item1421Per no
1442.43Fabrication of new bucket as per sample for Dry seed elevator/Sugar Elevator.item1431Per no
1452.44fabrication and erection of stirrer to Molasses condenser of Pan station. By making bed plate , motor reduction gear to be fitted for operating stirrer. Satisfactory trial to be done.item1441Per set
1462.45Fabrication and erection of new coil by pipe for super heated wash water system. Hydraulic testing to be done.item1451per coil
1472.46Broken shaft of Pug mill drive to be linked to proper place. New flange type coupling to be made fit to fit in it . Rib to be provided according to instruction.item1461Per no
1482.47New belt conveyor is to be fabricated and fitted on 8' x 16' vacuum filter with satisfactory trial.item1471Per no
1492.48New coil for D super heater is to be fabricated and to be fitted as directed with nozzles and satisfactory trial is to be given.item1481Per coil
1502.49Fabrication, erection with shaft and satisfactory trial of screw conveyor for vacuum filter mud mixture.item1491Per conveyor
1512.5Dismantling, fabrication and erection of vacuum filter mud mixture with satisfactory trial.item1501per no
1522.51Vacuum crystallizer weak and worn-out Shell dismantling work and fabrication erection of new shell in its place.item1511per m²
1532.52Dismantling and erection of worn-out Beam/Channel of Centrifugal machine .item1521per meter
1542.53Clarifier top and flocculaty chamber worn out plate dismantling work and fabrication erection by new plate. Leak proof trial to be done.item1531per m²
1552.54Sulphur furnace weak and worn out body shell with water jacket to be dismantled and shift to scrap yard. Fabrication erection of new shell and water jacket alongwith all necessary connections. Leak proof trial to be done.item1541Per furnace
1562.55Vacuum filter weak and worn out filtrate bottle to be dismantled and shift to scrap yard. Fabrication and erection of new bottle along with all connections. Leak proof trial to be done.item1551Per ton
1572.56Sulphur furnace cooler worn out coil pipe to be taken out , new pipe to be fitted and leak proof trial to be done.item1561per cooler.
1582.57Worn out Quad/Juice heater condensate bottle to be dismantled and shift to scrap yard. Fabrication and erection of new bottle with partition plate in its place. Trial to be given.item1571Per ton
1592.58Replacement of Partition plate of Quad/ Juice Heater condensate bottle.item15811 job L.S.
1602.59Junction box of spray pipe line to be opened, taken out, their pipes and nozzles to be cleaned and o fit them again after necessary repairing .item1591Per box
1612.6Weak and worn out portion of Spray /Injection pump suction pipe to be taken out and to repair by new /old plates.item1601Per suction pipe
1622.61Weak and worn-out duck foot bend of Pan / quad tail pipe to be dismantled. Fabrication and erection of new duck foot bend in its place.item1611per no.
1632.62Agitator of Vacuum filter to be repaired.item1621Per no.
1642.63For hydraulic testing of vapor line juice heater m.s. Pipe blinds be provided inside suction and delivery vapor pipe of V.L.J.H. And blinds be taken out after hydraulic testing.item1631L.S. 1 job.
1652.64Exhaust vapor valve to be opened its Weak portion to be patched by 8/10 mm thick plate. Assembled after patching and leak proof trial to be done.item1641Per valve.
1662.65Juice/Syrup sulphiter recovery tower worn out shell size 1 meter dia x 3 meter height to be dismantled and to shift scrap yard . Fabrication and erection of above shell by old/ new plate according to drawing. Leak proof trial to be done.item1651Per ton
1672.66Dismantling of worn out Melter of sulphur furnace, shifting it to scrap yard. Fabrication and erection of new Melter by 8/10 mm plate. Coils to be made and to erect it by new pipe. Trial to be done.item1661Per Melter
1682.67Dismantling of worn out Circular tank of Juice/ Water/Molasses weighing scale. Fabrication and erection of new tank by provided old/ new plates. Its valve seat work to be done and trial to be done.item1671Per ton
1692.68Dismantling of worn out spruzer of juiced sulphiter. Fabrication and erection of spruzer by new pipe. Leak proof trial to be done.item1681L.S. 1 job.
1702.69Dismantling of worn out mud distribution box of Clarifier. Fabrication and erection of new mud distribution box by new plate. Trial to be done.item1691Per no.
1712.7Worn-out Agitator of Vacuum filter is to be taken out and new is to be fabricated and fitted. Satisfactory trial is to be given.item1701Per no.
1722.71Partition Plate of Compartment of Clarifier to be replaceditem1711per m²
1732.72Dismantling of Clarifier flash tank. New to be erected. Its worn-out pipe to be replaced and leak proof trial to be done.item1721L.S. 1 job.
1742.73Dismantling of weak shell and top of 40 ton cap pan and shifting it to scrap yard. Fabrication and erection of new shall and top.item1731per m²
1752.74Dismantling of weak shell and top 60 ton cap pan and shifting it to scrap yard. Fabrication and erection of new shell and top by new/old plate.item1741per m²
1762.75Dismantling of save-all of top cone of 60 ton Pan and shifting it to scrap yard. Fabrication and erection of new save-all top cone in its place. Trial to be done.item1751per m²
1772.76Dismantling of save-all of top cone of 40 ton Pan and shifting it to scrap yard. Fabrication and erection of new save-all top cone in its place. Trial to be done.item1761per m²
1782.7760/40 ton pan's discharge valve bearing housing's plate to be replaced by new plate and trial to be done.item1771Per no.
1792.7860/40 ton pan's condenser's tail pipe's duck foot bend to be dismantled and fabrication erection of new duck foot bend to be done by new plate and trial to be done.item1781Per no.
1802.79Dismantling of worn out shell and bottom of juice sulphiter. Fabrication and erection of new shell and bottom by 8/10 mm thick plate with Juice, gas and lime line connection .Partition plate and stirrer to be fitted to proper place in side sulphiter. satisfactory trial to be done.item1791Per ton
1812.8Dismantling of worn out coolers of sulphur furnace. Fabrication and erection of coolers by 8 mm m.s. Plate. Cooling pipe, gas pipe connection to be done. Satisfactory trial to be done. And dismantled material to be shifted in scrap yard.item1801Per no.
1822.81Weak lower portion of shell of sulphur furnace coolers to be dismantled. Fabrication erection to be done. Worn-out cooler pipes to be replaced.item1811per m²
1832.82Dismantling fabrication erection of weak roof of Clarifier by 8 mm thick plate. Weak tray of Dorr to be taken out and 6mm thick plate to be patched in its place.item1821Per ton
1842.83Dismantling of worn out catcher bottle of vacuum filter. Fabrication and erection of new catcher bottle in its place. All connections and trials to be done.item1831Per no.
1852.84Dismantling of worn out cyclone of vacuum filter station. Fabrication and erection of new cyclones by 3/5 mm thick plate with satisfactory trial.item1841Per no.
1862.85800 m² old semikestner worn out roof, bottom and 30 % shall to be dismantled. Fabrication and erection to be done by 10 mm thick plate and trial to be done.item1851per ton
1872.86Quad body weak bottom to be dismantled. Fabrication and erection to be done by old or new plate. All connections to be done . Trial to be done.item1861per ton
1882.87Spray/ Injection pump's delivery header's weak portion to be dismantled. New to be fabricated by new /old plates and erected with satisfactory trial.item1871per ton
1892.88Dismantling of 3\" size worn out steam coil of B heavy molasses conditioner and fabrication erection of new coil with its trial.item1881Per coil
1902.89Fabrication and erection of Sulphur Furnace Melter coil in place of worn-out coil with all connections and satisfactory trial.item1891Per Coil
1912.9Dismantling of old worn out Air plate of Hopper . Fabrication and erection of new plate by 3mm new M.S. plate in its place.item1901per plate.
1922.91Old tank of A light and A molasses to be dismantled. New to be fabricated by 6/8 mm M.S. plate and erected in its place. Satisfactory trial to be done.item1911per ton
1932.92All 04 no fins of Pan no. 7 Mechanical circulator to be taken out. New fins with housing to be erected in its place. Trial to be done.item1921L.S. 1 job.
1942.93Worn out bottom portion of B heavy molasses conditioner to be dismantled. New to be fabricated by 6/8 mm M.S. plate and erected in its place.item1931Per ton
1952.94Worn out circular bottom plate of Crystallizer to be dismantled. New to be fabricated by new M.S. plate and erected in its plate. Leek proof trial to be done.item1941Per ton
1962.95Dismantling of complete Shell of 60 ton Pan and shift it to scrap yard. Fabrication and erection of complete shell of 60 ton pan by 10/12 mm thick plate. Satisfactory water and vacuum trial to be given.item1951per ton
1972.96Dismantling of Save-all Dome of 60 ton Pan and shift it to scrap yard. Fabrication and erection of Save-all Dome of 60 ton pan by 10/12 mm thick plate. Satisfactory water and vacuum trial to be given.item1961per ton
1982.97Syrup Sulphiter weak and worn out portion of Shell to be dismantled and shift it to Scrap yard. Fabrication and erection of above Shell by provided new plate of 8 mm thick. Satisfactory trial to be given.item1971per ton
1992.98Dismantling of weak old hot water overhead tank and condensate water receiving tank of pan and shift them to scrap yard. Fabrication and erection of new tanks by 8/10 mm thick plate with all necessary connections.item1981per ton
2002.99Dismantling of Worn-out Baffle plate of Juice sulphiter and shifting it to scrap yard. Fabrication and erection of new baffle plate in its place.item1991per ton
2013Dismantling of worn-out Dorr clear juice distribution box and shifting it to scrap yard. Fabrication and erection of new clear juice distribution box in its place with all connections.item2001per ton
2023.01Dismantling of old trough of hoppers and shifting them to scrap yard. Fabrication and erection of new trough with support Angle and fitting of wooden strip. Satisfactory trial to be given.item2011per trough
2033.02Erection of Magma mixture for 'B' or 'C' C/F M/C with its drive system, bed and all pipe line connection. Satisfactory trial is to be given.item2021L.S. 1 job.
2043.03Dismantling of all 03 Sulphur Furnaces with their auxiliary equipments, accessories and pipe lines from old plate farm and shift them to directed place and their erection at new Platform along with all equipments, connections and satisfactory trial.item2031L.S. 1 job.
2053.04Dismantling of Clarifier central shaft with stirrer arms and R.G. Box. Fabrication and erection of new central shaft with all accessories. Satisfactory trial to be given.item2041L.S. 1 job.
2063.05Dismantling of old Juice Sulphiter/ Clear juice/Syrup receiving bottle and shifting them to scrap yard. Fabrication and erection of New Bottle with all connections. Satisfactory trial to be given.item2051Per Ton
2073.06Fabrication and erection of B and C C/F M/C top cover by provided new /old M.S. Plate with satisfactory trial.item2061Per No
2083.07Fabrication and erection of B and C C/F M/C Molasses Separator by provided new /old M.S. Plate and satisfactory trial to be given.item2071Per no.
2093.08Fitting of Diffusers in Aeration tank with all connections and satisfactory trial to be given.item2081Per Tank
2103.09Fabrication of M.S. perforated box of size 1½ ?x 1' x 2 ? and fitting it in MGF/ACFitem2091Per box
2113.1Dismantling of A Centrifugal Machine size KCP 32 ? x 49 ? with its pug mill,column and structure and sift it to directed place.item2101per no
2123.11Repairing of Pugmill with drive arms by providing plates and Angle. Satisfactory trial to be given.item2111L.S. 1 job.
2133.12Dismantling of old trough of hopper and shifting them to scrap yard. Fabrication and erection of new trough with dubbing plate, and wooden connecting rod housing in those places. Satisfactory trial to be given.item2121per trough

AI Tender Summary

OUR REF NO 24874604
AUTHORITY Cooperative
TENDER VALUE 13 Lakhs
LAST DATE 20-07-2020
Authority
Authority Name Uttar Pradesh Cooperative Sugar Factories Federation Limited
Work Description Competitive E-Bidding For Fabrication, Erection And Dismantling From Reputed Contractors-2 General Work 3 Dismantling Of M.S. Pipe 2 Cm To 35 Cm Size. 4 Erection Of M.S. Pipe 2 Cm To 35 Cm Size. 5 Dismantling , Fabrication And Erection Of Pipe Fitting Size 2Cm To 35 Cm 6 Bend 7 Flange 8 Nipple 9 Cross / Tee 10 Valve 11 Reducer 12 Dismantling Of M.S. Pipe Above To 35 Cm Size & Shifting It To Scrap Yard. 13 Fabrication And Erection Of M.S. Pipe Above To 35 Cm Size By 6 / 8 / 10 Mm Plate. 14 Dismantling , Fabrication And Erection Of Pipe Fitting Above 35 Cm Size. 15 Bend 16 Reducer 17 Nipple 18 Cross / Tee 19 Valve 20 Dismantling Of Old Bed And Fabrication, Erection, Alignment & Trial Of New Bed Of Motor, Pump Or R / G Box. 21 10 Hp To 20 Hp 22 25 Hp To 60 Hp 23 75 Hp To 125 Hp 24 150 Hp To 250 Hp 25 Patching Work In Different Type Of Rectanglur, Square & Ciruler Old Equipments By New / Old Plate As Available. 26 Dismantling Of Old Rectangular / Circular Tank And Shifting Them To Scrap Yard. 27 Fabrication And Erection Of New Rectangular / Circular Tank By New / Old Plate. 28 Flat Bottom 29 Conical Bottom 30 Dismantling Of Light Structure 31 Fabrication And Erection Of Light Structure. 32 Dismantling Of Heavy Structure. 33 Fabrication And Erection Of Heavy Structure. 34 Replacement Of Old Worn-Out Platform By New Or Old Plate. 35 Fabrication And Fitting Of Shed By Old G.I. Sheet For Db, Motor Etc In Different Places. 36 Repairing Of Trusses Of Mill House, Boiling House Etc By Welding Or Fitting Missing Or Worn-Out Nut And Bolts. 37 Straightening Bent M.S. Plates For Reuse. 38 Dismantling Fabrication And Erection Of Header With Flange And Nipple Etc. 39 Size 2.5 Cm To 12.5 Cm 40 Size 15 Cm To 30 Cm 41 Replacement Of Cone Of Different Equipments By Old / New M.S. Plate. 42 Up To 1 Meter Dia 43 Above 1 Meter Dia 44 Repairing Of M.S. Gutter At Different Places. 45 Fabrication And Erection Of New Gutter In Place Of Worn-Out Gutters By Old / New Plates. 46 Fabrication And Erection Of New Gutter By Old / New M.S. Plate. 47 Repairing Of Worn-Out Column And Beam In Mill 48 Dismantling Of Worn-Out Coils And Fabrication Erection Of New Coil By New Pipe. 49 Fabrication Of Electric Pole Up To 27 Long With Base By 4, 6, 8 Old Or New Pipes. Cross Arm To Be Fitted. 50 Fabrication And Erection Of Step Type Stairs With Railing Etc For Different Places. 51 Mill House 52 Forzing Of Cane Carrier / Bagasse Carrier Side Links As Per Required Size. 53 Dismantling And Erection Of Worn-Out Runner Of Cane Carrier / Src / Rake Carrier / Bagasse Elevator / Rbc. 54 Repairing Of Old Rakes Of S.R.C. / Inter Rake Carrier. 55 Repairing Of R.B.C. And Bagasse Elevator Slates 56 Fabrication Of New Rakes For Src / Inter Rake Carrier By M.S. Plate 57 Replacement Of Worn Out Side Plate Of Rake Carrier / Bagasse Elevator / Rbc / Up To 300 Mm Height By New / Old Plate. 58 Replacement Of Worn Out Side Plate Of Cane Carrier By New / Old Plate And Strengthening Of Its Lower Side Support. 59 Dismantling And Erection Of Side & Bottom Plate Of Src / Rake Carrier / Bagasse Elevator & Rbc Above To 300 Mm Size. Flat And Angle To Be Fitted Out Side Of Bottom Plate For Strengthening. 60 Fabrication & Erection Of Guide In Cane Carrier / Src / Bagasse Elevator And Rbc By Bending Angle And Plate. 61 Dismantling Of Worn-Out Box Of Src / Rake Carrier And Erection Of New Box In Place Of It. 62 150 X 150 Mm 63 200 X 200 Mm 64 Replacement Of Weak Side And Top Plate From Cane Chopper To Fibrizer By Old / New Plate. 65 Fabrication And Erection Of Juice Distribution Chute. 66 Dismantling Of Worn Out Rail Of Cane Unloader And Erection Of New Rail At Its Place. 67 Dismantling Of Worn-Out Squire Bar Of Unloader And Erecting Of New Squire Bar At Its Place. 68 Dismantling Of Bottom And Side Worn Out Portion Of D.S.M. Screen And Fitting Of New Plate In Its Place. 69 Dismantling Of Old Screw Conveyor And Fabrication And Erection Of New Screw Conveyor In Its Place According To Size 70 Replacement Of Worn Out Portion Of Bottom Trough Of Screw Conveyor By New / Old Plate 71 Half Circumference Portion 72 Hole Type Half Circumference Portion By M.S. Plate 73 Hole Type Half Circumference Portion By S.S. Plate 74 Repairing Of Defective Tawas Of Mill Screw Conveyor. 75 Hard Facing Work Of Mill Roller Crown Pinion Teethes. 76 Replacemen Of Worn-Out Angle / Channel / Beam Of Cane Carrier / Rake Carrier / Bagasse Elevator And Rbc. 77 Angle 78 Chanel 79 Beam 80 Fabrication And Erection Of Trpf Rollers Top & Bottom Cover By New / Old M.S. Plate 81 Hard Facing Work Of Trpf Rollers Shell And Teeth. 82 Dismantling Of Mill Head Stock And Its Erection Accordingly With All Accessories. 83 Line Level Of Inter Rake Carrier And Worn Out Side Plates Of Tail And Driving End Shafts Guides To Be Replace By M.S. Plate. Erection After Line Alignment With Satisfactory Trial. 84 Fabrication And Erection Of Mill Pressure Chute By New M.S. Plate. Lining Of S.S. Plate To Be Fitted On It And Strengthening Of Top And Bottom Plate To Be Done. Fitting Accordingly As Per Old Chute To Be Done. 85 Replacement Of Old S.S. Lining Of Pressure Chute . New S.S. Lining To Be Fitted Accordingly As Per Old Chute. Assembly And Strengthening To Be Done. 86 Bagacilo Screens Of Bagasse Elevator To Be Taken Out And Their Fitting To Proper Place After Repairing / Setting Them Straight / Right. 87 Checking Of Mill Juice Tray, Replacement Of Worn Out Portion, Arresting Of Leakages With Welding Of S.S. / M.S. Electrodes With Satisfactory Trial. 88 Repairing Work Of Worn Out Blades Of Bagacillo Blower With Satisfactory Trial. 89 Fabrication Erection And Satisfactory Trial Work Of New Bagacillo Blower. 90 Dismantling Of Worn-Out Deflector Plate Of Fibrizer With Beam. Fabrication And Erection Of New Deflector Plate Accordingly As Perold Plate. 91 Cane Carriers All Three Runners Beams Line Alignment And Level To Be Set Right And Satisfactory Trial Work To Be Done. 92 Line Alignment Work Of Head And Tail End Shaft Of Secondary Rake Carrier / Irc To Be Done. Its Worn Out Runner And Angle To Be Replaced And Satisfactory Trial To Be Done. 93 Boiler House 94 Fabrication Of New Rakes For Rbc And Bagasse Elevator. Approximate Weight Of 01 Rake Is 12 Kg. 95 Repairing Of Old Rakes Of Rbc And Bagasse Elevator. 96 Replacement Of Worn Out Portion Of Boiler Flue Gas / Air Heater Ducting By Old / New Plate. 97 Patching Work Over Worn Out Portion Of Boiler Flue Gas Ducting By Old / New Plate. 98 After Dismantling Of Old Flue Gas Ducting Damper, New Damper To Be Fabricated And Erected. 99 After Dismantling Of Old F.D. Fan Air Ducting Damper, New Damper To Be Fabricated And Erected. 100 Repairing Of Bagasse Feeding Sliding Gate Of Boilers . 101 Erection Of Id Fan Casing After Replacement Or Patching Of Worn Out Portion Of It By Old / New Plate. 102 Fabrication And Erection Of Worn Out Bagasse Feeding Chute Of Boilers By Old / New Plates. 103 Repairing / Replacing Of Old Worn Out Fins Of 20 Ton Boilers Economizer Tube. 104 Dismantling , Modification And Erection Of Boiler Flue Gas Ducting As Per Instruction. 105 After Dismantling Worn Out Wear Plate Of Id Fan Impeller Vain, New Plate To Be Fitted And Hard Faced As Per Instruction. 106 Fabrication And Erection Of New Suction Cone Of Boiler Id Fan By Old / New Plate. 107 Worn-Out Portion Of Boiler Ash Discharge Chute To Be Taken Out. Fabrication And Erection Of New Ash Discharge Chute Of Boilers. 108 Replacement Of Old Tubes Of Air Heater By New Tubes. 109 Fabrication Of Old Tubes Of Boilers According To The Size Of Air Heater Tubes And Their Erection To Air Heater. 110 Dismantling Of Old I.D. Fan With Casing Of Boilers And Shifting It To Scrap Yard And Erection Of New I.D. Fan With Casing And Inlet , Outlet Connections In Its Place And Satisfactory Trial To Be Done. 111 Dismantling Of Old I.D. Fan And Erection Of New I.D. Fan Inplace Of Old One With Satisfactory Trial. 112 Boiling House 113 Old Brass / Ss Tubes Of Quad / Juice Heater / Pans To Be Taken Out And Depositing Them To Store. New Tubes To Be Fitted, Expended And To Be Trialed At 80 Lbs Pressure. 114 Juice Heater / Semikestner 115 Vapor Shell / Quad / Pan 116 Weak Save All Of Quad / Pans To Be Repaired By New / Old Plate And To Fit / Erect Them. 117 Fabrication And Erection Work Of Save-All By 8 Mm M.S. Plate In Place Of Quad / Pans Worn-Out Save-All According To Instructions. Satisfactory Trial Is Needed. 118 Fabrication And Erection Of Steiner With Nipple In Place Of Raw Juice / Sulphited Juice / Syrup / Melter Pumps Worn Out / Old Strainers. 119 Weak Catchers Worn Out Portion Of Quad / Pan To Be Taken Out. Repairing To Be Done By Provided Plates. Fins To Be Prepared And Fitted To Them. 120 Top And Bottom Portion Worn-Out Partition Plate Of Juice Heater / Vapor Line Juice Heater Dismantling And New Partition Plate Fabrication Erection Work To Be Done . 121 For Fitting Of Rubber Strip On Partition Plate Of Juice Heater / Vapor Line Juice Heater, Flat Iron To Be Fitted According To Instruction And Rubber Strip To Be Fitted And Trial To Be Done. 122 Dismantling, Fabrication And Erection Of Worn Out Condenser Of Vacuum Filter Along With All Connections And Satisfactory Trial. 123 Dismantling Fabrication Erection Of Condensate Bottle Of Quad / Semekestner / Vapor Cell / Juice Heater Along With All Connections. Dismantled Material To Be Shifted To Scrap Yard. 124 Repairing Work Of Aerator Of Effluent Treatment Plant. 125 C.I.Cross 6 Size Dismantling Fabrication And Erection Work At Sulphur Station. Blinds To Be Fitted To Both End Of Cross. 126 Dismantling Fabrication And Erection Work Of Steiner For Spray / Injection Pump Suction Pipe. 127 Dismantling Of Worn-Out Portion Of Vacuum Filter Trough . Plate To Be Bend According To Size And To Be Fitted In Trough. 128 Dismantling Fabrication And Erection Of Channel And Beam Of Condenser. 129 Quad / Pan Entrainment Catcher Inside Worn-Out Channel, Angle Dismantling And New Channel, Angle Erection Work. 130 6 Size Worn Out Coils Of Clarifier Dismantling, New Fabricating Erection With Nipple And Trial To Be Done. 131 Dismantling Of Worn-Out Down Take Of Semikestner, Vapor Cell, Quad, Pan And Fabrication Erection Of New Down Take By 6 / 8 Mm Plate With Trial. 132 Crystallizers Broken / Tilted Arms To Be Taken Out. After Repairing Them Or Making New To Be Fitted To Proper Place And Trial To Be Given. 133 40 / 60 Ton Pan Discharge Valves Worn Out Body / Chute Dismantling Work And Fabrication Erection Work Of New Body / Chute. 134 Weak Catcher Of Quad And Pans Dismantling Work And Fabrication Erection Work Of New Catcher According To Instructions. 135 Crystallizers Worn-Out Gland, Bush, Replacing Work, Shaft Repairing Work , Worm Wheel Opening And Fitting Work And Satisfactory Trial To Be Given. 136 Spray System Pipe Line Blinds To Be Opened, Cleaned And To Be Fitted After Cleaning With Satisfactory Trial. 137 Spray System Worn Out Branch Pipe Line Dismantling And New Branch Line Erection Work And Satisfactory Trial To Be Done. 138 Quad / Pan Worn-Out Umbrella Dismantling And New Umbrella Fabrication Erection Work To Be Done. 139 Weak Syrup / Molasses Tanks Of Pan Station To Be Taken Out .New Tanks To Be Fabricate And Erect By 6 / 8 Mm Thick Plate. Braising Of Angles To Be Provided Along With Necessary Connection To Tanks. 140 Vapor Shell / Semikestner / Quad Pans Worn Out Ammonia Coil Dismantling And New Ammonia Coil Fabrication Erction Work With Trial. 141 Sugar Hopper Weak And Worn Out Driving Unit / Trough To Be Dismantled. Fabrication And Erection Of New Drive Unit / Trough With Angle . Trial To Be Done. 142 Fabrication And Erection Of New Chute Of S.D. Machine Pug Mill Gate. 143 A Machines Old Hood Dismantling And New Hood Fabrication Erection Work . 144 Fabrication Of New Bucket As Per Sample For Dry Seed Elevator / Sugar Elevator. 145 Fabrication And Erection Of Stirrer To Molasses Condenser Of Pan Station. By Making Bed Plate , Motor Reduction Gear To Be Fitted For Operating Stirrer. Satisfactory Trial To Be Done. 146 Fabrication And Erection Of New Coil By Pipe For Super Heated Wash Water System. Hydraulic Testing To Be Done. 147 Broken Shaft Of Pug Mill Drive To Be Linked To Proper Place. New Flange Type Coupling To Be Made Fit To Fit In It . Rib To Be Provided According To Instruction. 148 New Belt Conveyor Is To Be Fabricated And Fitted On 8 X 16 Vacuum Filter With Satisfactory Trial. 149 New Coil For D Super Heater Is To Be Fabricated And To Be Fitted As Directed With Nozzles And Satisfactory Trial Is To Be Given. 150 Fabrication, Erection With Shaft And Satisfactory Trial Of Screw Conveyor For Vacuum Filter Mud Mixture. 151 Dismantling, Fabrication And Erection Of Vacuum Filter Mud Mixture With Satisfactory Trial. 152 Vacuum Crystallizer Weak And Worn-Out Shell Dismantling Work And Fabrication Erection Of New Shell In Its Place. 153 Dismantling And Erection Of Worn-Out Beam / Channel Of Centrifugal Machine . 154 Clarifier Top And Flocculaty Chamber Worn Out Plate Dismantling Work And Fabrication Erection By New Plate. Leak Proof Trial To Be Done. 155 Sulphur Furnace Weak And Worn Out Body Shell With Water Jacket To Be Dismantled And Shift To Scrap Yard. Fabrication Erection Of New Shell And Water Jacket Alongwith All Necessary Connections. Leak Proof Trial To Be Done. 156 Vacuum Filter Weak And Worn Out Filtrate Bottle To Be Dismantled And Shift To Scrap Yard. Fabrication And Erection Of New Bottle Along With All Connections. Leak Proof Trial To Be Done. 157 Sulphur Furnace Cooler Worn Out Coil Pipe To Be Taken Out , New Pipe To Be Fitted And Leak Proof Trial To Be Done. 158 Worn Out Quad / Juice Heater Condensate Bottle To Be Dismantled And Shift To Scrap Yard. Fabrication And Erection Of New Bottle With Partition Plate In Its Place. Trial To Be Given. 159 Replacement Of Partition Plate Of Quad / Juice Heater Condensate Bottle. 160 Junction Box Of Spray Pipe Line To Be Opened, Taken Out, Their Pipes And Nozzles To Be Cleaned And O Fit Them Again After Necessary Repairing . 161 Weak And Worn Out Portion Of Spray / Injection Pump Suction Pipe To Be Taken Out And To Repair By New / Old Plates. 162 Weak And Worn-Out Duck Foot Bend Of Pan / Quad Tail Pipe To Be Dismantled. Fabrication And Erection Of New Duck Foot Bend In Its Place. 163 Agitator Of Vacuum Filter To Be Repaired. 164 For Hydraulic Testing Of Vapor Line Juice Heater M.S. Pipe Blinds Be Provided Inside Suction And Delivery Vapor Pipe Of V.L.J.H. And Blinds Be Taken Out After Hydraulic Testing. 165 Exhaust Vapor Valve To Be Opened Its Weak Portion To Be Patched By 8 / 10 Mm Thick Plate. Assembled After Patching And Leak Proof Trial To Be Done. 166 Juice / Syrup Sulphiter Recovery Tower Worn Out Shell Size 1 Meter Dia X 3 Meter Height To Be Dismantled And To Shift Scrap Yard . Fabrication And Erection Of Above Shell By Old / New Plate According To Drawing. Leak Proof Trial To Be Done. 167 Dismantling Of Worn Out Melter Of Sulphur Furnace, Shifting It To Scrap Yard. Fabrication And Erection Of New Melter By 8 / 10 Mm Plate. Coils To Be Made And To Erect It By New Pipe. Trial To Be Done. 168 Dismantling Of Worn Out Circular Tank Of Juice / Water / Molasses Weighing Scale. Fabrication And Erection Of New Tank By Provided Old / New Plates. Its Valve Seat Work To Be Done And Trial To Be Done. 169 Dismantling Of Worn Out Spruzer Of Juiced Sulphiter. Fabrication And Erection Of Spruzer By New Pipe. Leak Proof Trial To Be Done. 170 Dismantling Of Worn Out Mud Distribution Box Of Clarifier. Fabrication And Erection Of New Mud Distribution Box By New Plate. Trial To Be Done. 171 Worn-Out Agitator Of Vacuum Filter Is To Be Taken Out And New Is To Be Fabricated And Fitted. Satisfactory Trial Is To Be Given. 172 Partition Plate Of Compartment Of Clarifier To Be Replaced 173 Dismantling Of Clarifier Flash Tank. New To Be Erected. Its Worn-Out Pipe To Be Replaced And Leak Proof Trial To Be Done. 174 Dismantling Of Weak Shell And Top Of 40 Ton Cap Pan And Shifting It To Scrap Yard. Fabrication And Erection Of New Shall And Top. 175 Dismantling Of Weak Shell And Top 60 Ton Cap Pan And Shifting It To Scrap Yard. Fabrication And Erection Of New Shell And Top By New / Old Plate. 176 Dismantling Of Save-All Of Top Cone Of 60 Ton Pan And Shifting It To Scrap Yard. Fabrication And Erection Of New Save-All Top Cone In Its Place. Trial To Be Done. 177 Dismantling Of Save-All Of Top Cone Of 40 Ton Pan And Shifting It To Scrap Yard. Fabrication And Erection Of New Save-All Top Cone In Its Place. Trial To Be Done. 178 60 / 40 Ton Pans Discharge Valve Bearing Housings Plate To Be Replaced By New Plate And Trial To Be Done. 179 60 / 40 Ton Pans Condensers Tail Pipes Duck Foot Bend To Be Dismantled And Fabrication Erection Of New Duck Foot Bend To Be Done By New Plate And Trial To Be Done. 180 Dismantling Of Worn Out Shell And Bottom Of Juice Sulphiter. Fabrication And Erection Of New Shell And Bottom By 8 / 10 Mm Thick Plate With Juice, Gas And Lime Line Connection .Partition Plate And Stirrer To Be Fitted To Proper Place In Side Sulphiter. Satisfactory Trial To Be Done. 181 Dismantling Of Worn Out Coolers Of Sulphur Furnace. Fabrication And Erection Of Coolers By 8 Mm M.S. Plate. Cooling Pipe, Gas Pipe Connection To Be Done. Satisfactory Trial To Be Done. And Dismantled Material To Be Shifted In Scrap Yard. 182 Weak Lower Portion Of Shell Of Sulphur Furnace Coolers To Be Dismantled. Fabrication Erection To Be Done. Worn-Out Cooler Pipes To Be Replaced. 183 Dismantling Fabrication Erection Of Weak Roof Of Clarifier By 8 Mm Thick Plate. Weak Tray Of Dorr To Be Taken Out And 6Mm Thick Plate To Be Patched In Its Place. 184 Dismantling Of Worn Out Catcher Bottle Of Vacuum Filter. Fabrication And Erection Of New Catcher Bottle In Its Place. All Connections And Trials To Be Done. 185 Dismantling Of Worn Out Cyclone Of Vacuum Filter Station. Fabrication And Erection Of New Cyclones By 3 / 5 Mm Thick Plate With Satisfactory Trial. 186 800 M² Old Semikestner Worn Out Roof, Bottom And 30 % Shall To Be Dismantled. Fabrication And Erection To Be Done By 10 Mm Thick Plate And Trial To Be Done. 187 Quad Body Weak Bottom To Be Dismantled. Fabrication And Erection To Be Done By Old Or New Plate. All Connections To Be Done . Trial To Be Done. 188 Spray / Injection Pumps Delivery Headers Weak Portion To Be Dismantled. New To Be Fabricated By New / Old Plates And Erected With Satisfactory Trial. 189 Dismantling Of 3 Size Worn Out Steam Coil Of B Heavy Molasses Conditioner And Fabrication Erection Of New Coil With Its Trial. 190 Fabrication And Erection Of Sulphur Furnace Melter Coil In Place Of Worn-Out Coil With All Connections And Satisfactory Trial. 191 Dismantling Of Old Worn Out Air Plate Of Hopper . Fabrication And Erection Of New Plate By 3Mm New M.S. Plate In Its Place. 192 Old Tank Of A Light And A Molasses To Be Dismantled. New To Be Fabricated By 6 / 8 Mm M.S. Plate And Erected In Its Place. Satisfactory Trial To Be Done. 193 All 04 No Fins Of Pan No. 7 Mechanical Circulator To Be Taken Out. New Fins With Housing To Be Erected In Its Place. Trial To Be Done. 194 Worn Out Bottom Portion Of B Heavy Molasses Conditioner To Be Dismantled. New To Be Fabricated By 6 / 8 Mm M.S. Plate And Erected In Its Place. 195 Worn Out Circular Bottom Plate Of Crystallizer To Be Dismantled. New To Be Fabricated By New M.S. Plate And Erected In Its Plate. Leek Proof Trial To Be Done. 196 Dismantling Of Complete Shell Of 60 Ton Pan And Shift It To Scrap Yard. Fabrication And Erection Of Complete Shell Of 60 Ton Pan By 10 / 12 Mm Thick Plate. Satisfactory Water And Vacuum Trial To Be Given. 197 Dismantling Of Save-All Dome Of 60 Ton Pan And Shift It To Scrap Yard. Fabrication And Erection Of Save-All Dome Of 60 Ton Pan By 10 / 12 Mm Thick Plate. Satisfactory Water And Vacuum Trial To Be Given. 198 Syrup Sulphiter Weak And Worn Out Portion Of Shell To Be Dismantled And Shift It To Scrap Yard. Fabrication And Erection Of Above Shell By Provided New Plate Of 8 Mm Thick. Satisfactory Trial To Be Given. 199 Dismantling Of Weak Old Hot Water Overhead Tank And Condensate Water Receiving Tank Of Pan And Shift Them To Scrap Yard. Fabrication And Erection Of New Tanks By 8 / 10 Mm Thick Plate With All Necessary Connections. 200 Dismantling Of Worn-Out Baffle Plate Of Juice Sulphiter And Shifting It To Scrap Yard. Fabrication And Erection Of New Baffle Plate In Its Place. 201 Dismantling Of Worn-Out Dorr Clear Juice Distribution Box And Shifting It To Scrap Yard. Fabrication And Erection Of New Clear Juice Distribution Box In Its Place With All Connections. 202 Dismantling Of Old Trough Of Hoppers And Shifting Them To Scrap Yard. Fabrication And Erection Of New Trough With Support Angle And Fitting Of Wooden Strip. Satisfactory Trial To Be Given. 203 Erection Of Magma Mixture For B Or C C / F M / C With Its Drive System, Bed And All Pipe Line Connection. Satisfactory Trial Is To Be Given. 204 Dismantling Of All 03 Sulphur Furnaces With Their Auxiliary Equipments, Accessories And Pipe Lines From Old Plate Farm And Shift Them To Directed Place And Their Erection At New Platform Along With All Equipments, Connections And Satisfactory Trial. 205 Dismantling Of Clarifier Central Shaft With Stirrer Arms And R.G. Box. Fabrication And Erection Of New Central Shaft With All Accessories. Satisfactory Trial To Be Given. 206 Dismantling Of Old Juice Sulphiter / Clear Juice / Syrup Receiving Bottle And Shifting Them To Scrap Yard. Fabrication And Erection Of New Bottle With All Connections. Satisfactory Trial To Be Given. 207 Fabrication And Erection Of B And C C / F M / C Top Cover By Provided New / Old M.S. Plate With Satisfactory Trial. 208 Fabrication And Erection Of B And C C / F M / C Molasses Separator By Provided New / Old M.S. Plate And Satisfactory Trial To Be Given. 209 Fitting Of Diffusers In Aeration Tank With All Connections And Satisfactory Trial To Be Given. 210 Fabrication Of M.S. Perforated Box Of Size 1½ ?X 1 X 2 ? And Fitting It In Mgf / Acf 211 Dismantling Of A Centrifugal Machine Size Kcp 32 ? X 49 ? With Its Pug Mill, Column And Structure And Sift It To Directed Place. 212 Repairing Of Pugmill With Drive Arms By Providing Plates And Angle. Satisfactory Trial To Be Given. 213 Dismantling Of Old Trough Of Hopper And Shifting Them To Scrap Yard. Fabrication And Erection Of New Trough With Dubbing Plate, And Wooden Connecting Rod Housing In Those Places. Satisfactory Trial To Be Given.
Basic Detail
Tender No 637/c/PS/Tender/01/2020-21
Bidding Type Tender
Location
City Hasanpur Amroha
State Uttar Pradesh
Key Dates
Publish Date 13 Jul 2020
Submission Date 20 Jul 2020
Open Date 20 Jul 2020
Finance
Tender Value 13 Lakhs
Tender Fee 590
EMD 25000
Exemption Not Available
Document List
BOQ_739038.xls
docfeb2021.pdf
Tendernotice_1.pdf
117F56D5-E2A4-4245-ABDA-55A777A86D85.html

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Jul 13, 2020
11:30 IST

Tender Published

Tender notice published.

Completed
Jul 20, 2020
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Jul 20, 2020

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
xls

BOQ_739038.xls

pdf

docfeb2021.pdf

pdf

Tendernotice_1.pdf

html

117F56D5-E2A4-4245-ABDA-55A777A86D85.html

TenderDetail
Loading tenders