Biennial Maintenance Contract For Maintenance , Calibration , Testing , Vaccumization And Supply Of Spares Of Liquid Oxygen Tanks And Vaporizers
Tender Overview
Project Description
Biennial Maintenance Contract For Maintenance , Calibration , Testing , Vaccumization And Supply Of Spares Of Liquid Oxygen Tanks And Vaporizers , Quarterly Preventive Maintenance Of Both Liquid Oxygen Tanks , All Gauges , Safety Valves , Vaporisers And Regulating System After Vaporisers Inside Our Liquid Oxygen Tank Area . , Testing And Certification 08 Nos Of Safety Valves And Providing All Relevant Certificates ( Issued Under The Rules 18 Of Smpv ( U ) Rules 2016 ) , Calibration Of 7 Nos Pressure Gauges From Nabl Approved Lab , Calibration 02 Nos Of Level Gauges From Nabl Approved Lab , Testing And Certification 2 Nos Of Tank As Per Peso Under The Smpv ( U ) Rules-2016 , Rule -19 , Vaccumizing Of Two ( 02Nos ) The Crycogenic Storage Tanks If There Is Excessive Rise Of Pressure Due To Poor Vaccum . , Mandays For Attending Emergency Breakdown On First Day , Mandays For Attending Emergency Breakdown After First Day , Supply Of 40 Nb Cryogenic Globe Valves , Supply Of 25 Nb Cryogenic Globevalves , Supply Of 20 Nb Cryogenic Globe Valves , Supply Of 15 Nb Cryogenic Globe Valves , Supply Of Pressure Gauge , Supply Of Level Gauge , Supply Of Safety Relief Valve , Supply Rupture Disc , Supply Trvs , Supply Pressure Buildup Regulator , Supply Of Seat For 40 Nb Cryogenic Globe Valves , Supply Of Seat For 25 Nb Cryogenic Globe Valves , Supply Of Seat For 20 Nb Cryogenic Globe Valves , Supply Of Seat For 15 Nb Cryogenic Globe Valves , Maruti Ciaz-Vxi- Sedan T-Cars ( Petrol/ Cng Verson ) With Driver And Fuel On Daily Rate Basis Approximate Days Required For Three Years: 1250 Days , Rate Per Extra Hrs Beyond 10 Hrs /Day For 2000 Hrs
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 28-Jul-2020 | Tender Closing Date Extended Up to 04.08.2020 | Date | 04-Aug-2020 |
BOQ
| Name of Work: “Non Comprehensive Bienial Maintenance Contract of Liquid Oxygen Plant manufactured by M/s Super Cryogenics system Pvt ltd. comprises of Preventive maintenance, Breakdown maintenance, Calibration, Testing ,Vacuumization & Supply of spares of Liquid Oxygen tank (LOX) and Vaporizer.” | |||||
|---|---|---|---|---|---|
| Sl.No. | Item Description | Item Code / Make | Quantity | Unit | |
| 1 | 1.01 | Quarterly Preventive maintenance of both liquid oxygen tanks,all gauges,safety valves,vaporisers and regulating system after vaporisers inside our Liquid Oxygen tank area. | Item 1 | 8 | Unit 1 |
| 2 | 1.02 | Testing and Certification 08 nos of safety valves and providing all relevant certificates(issued Under the Rules 18 of SMPV (U) RULES 2016), Calibration of 7 nos Pressure gauges from NABL approved Lab, Calibration 02 nos of Level gauges from NABL approved Lab | Item2 | 2 | Unit 2 |
| 3 | 1.03 | Testing and certification 2 nos of tank as per PESO Under the SMPV (U) Rules-2016,Rule -19 | Item 3 | 1 | Unit 3 |
| 4 | 1.04 | Vaccumizing of two (02nos) the crycogenic storage tanks if there is excessive rise of pressure due to poor vaccum. | Item 4 | 1 | Unit 4 |
| 5 | 1.05 | Mandays for attending emergency breakdown on first day | Item 5 | 10 | Unit 5 |
| 6 | 1.06 | Mandays for attending emergency breakdown after first day | Item 6 | 10 | Unit 6 |
| 7 | 1.07 | Supply of 40 NB Cryogenic Globe Valves | Item 7 | 2 | Unit 7 |
| 8 | 1.08 | Supply of 25 NB Cryogenic Globe Valves | Item 8 | 2 | Unit 8 |
| 9 | 1.09 | Supply of 20 NB Cryogenic Globe Valves | Item 9 | 2 | Unit 9 |
| 10 | 1.1 | Supply of 15 NB Cryogenic Globe Valves | Item 10 | 2 | Unit 10 |
| 11 | 1.11 | Supply of Pressure Gauge | Item 11 | 1 | Unit 11 |
| 12 | 1.12 | Supply of Level Gauge | Item 12 | 1 | Unit 12 |
| 13 | 1.13 | Supply of Safety Relief Valve | Item 13 | 2 | Unit 13 |
| 14 | 1.14 | Supply Rupture Disc | Item 14 | 4 | Unit 14 |
| 15 | 1.15 | Supply TRVs | Item 15 | 2 | Unit 15 |
| 16 | 1.16 | Supply Pressure Buildup Regulator | Item 16 | 2 | Unit 16 |
| 17 | 1.17 | Supply of Seat for 40 NB Cryogenic Globe Valves | Item 17 | 4 | Unit 17 |
| 18 | 1.18 | Supply of Seat for 25 NB Cryogenic Globe Valves | Item 18 | 4 | Unit 18 |
| 19 | 1.19 | Supply of Seat for 20 NB Cryogenic Globe Valves | Item 19 | 4 | Unit 19 |
| 20 | 1.2 | Supply of Seat for 15 NB Cryogenic Globe Valves | Item 20 | 4 | Unit 20 |
| 21 | 1.21 | Maruti CIAZ-Vxi- sedan T-Cars (Petrol/ CNG Verson) with driver and fuel on daily rate basis approximate days required For three years: 1250 days\n | Item 21 | 1250 | Unit 21 |
| 22 | 1.22 | Rate per extra Hrs beyond 10 Hrs /day \nFor 2000 hrs \n | Item 22 | 2000 | Unit 22 |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
Completed