1 . Civil Branch Related Equipments Soil/P . H . E . Lab .
Tender Overview
Project Description
1 . Civil Branch Related Equipments Soil / P . H . E . Lab . -1 Digital Ph Meter Nfull Specification As Per Annexure “H” 2 Nephelometer Nfull Specification As Per Annexure “H” 3 Muffle Furnace Nfull Specification As Per Annexure “H” 4 Water Distillation Unit Nfull Specification As Per Annexure “H” 5 Digital Conductivity Meter Nfull Specification As Per Annexure “H” 6 Water Analysis Kit Nfull Specification As Per Annexure “H” 7 Digital Electronic Balance :- Nfull Specification As Per Annexure “H” 8 B. O. D. Incubator Nfull Specification As Per Annexure “H” 9 Cod Analysis System Nfull Specification As Per Annexure “H” 10 Do Meter Nfull Specification As Per Annexure “H” 11 Refrigerator: Nfull Specification As Per Annexure “H” 12 Jar Test Apparatus Nfull Specification As Per Annexure “H” 13 Oven Universal : Nfull Specification As Per Annexure “H” 14 Digital Turbidity Meters Nfull Specification As Per Annexure “H” 15 Plastic Limit Set ( Is: 2720 Part 7 ) Nfull Specification As Per Annexure “H” 16 Liquid Limit Cone Penetrometer ( Is: 2720 Part 5 ) Nfull Specification As Per Annexure “H” 17 Liquid Limit Device ( Is: 2720 Part 5 ) Nfull Specification As Per Annexure “H” 18 Core Cutter ( Is: 2720 Part 29 ) Nfull Specification As Per Annexure “H” 19 Standard Compaction Test ( Is: 2720 Part 7 ) Nfull Specification As Per Annexure “H” 20 Heavy Compaction Test ( Is: 2720 Part 8 ) Nfull Specification As Per Annexure “H” 21 Pycnometer: Nfull Specification As Per Annexure “H” 22 Infra-Red Moisture Meter: Nfull Specification As Per Annexure “H” 23 Direct Shear Apparatus Should Be Conforming To Nfull Specification As Per Annexure “H” 24 Sand Pouring Cylinder Nfull Specification As Per Annexure “H” 25 Unconfined Compression Tester- Proving Ring Type ( Motorised ) Nfull Specification As Per Annexure “H” 26 Permeability Apparatus Nfull Specification As Per Annexure “H” 27 Standard Penetration Test Nfull Specification As Per Annexure “H” 28 Sieves: Nfull Specification As Per Annexure “H” 29 Sieves: Nfull Specification As Per Annexure “H” 30 Sieve Shaker ‘Gyratory’ Nfull Specification As Per Annexure “H” 31 Auger Outfit ( Helical Type ) Nfull Specification As Per Annexure “H” 32 Auger Outfit ( Helical Type ) Nfull Specification As Per Annexure “H” 33 Oven Universal : Nfull Specification As Per Annexure “H”
BOQ
| Name of Work: 1. Civil Branch Related Equipments Soil/P.H.E. Lab. | |||||
|---|---|---|---|---|---|
| Sl.No. | Item DescriptionFull Specification as per Annexure “H” | Item Code / Make | Quantity | Units | |
| 1 | 1 | Digital PH Meter\nFull Specification as per Annexure “H” | item1 | 5 | Nos |
| 2 | 2 | Nephelometer\nFull Specification as per Annexure “H” | item2 | 4 | Nos |
| 3 | 3 | Muffle Furnace\nFull Specification as per Annexure “H” | item3 | 4 | Nos |
| 4 | 4 | Water Distillation unit \nFull Specification as per Annexure “H” | item4 | 4 | Nos |
| 5 | 5 | Digital Conductivity Meter\nFull Specification as per Annexure “H” | item5 | 4 | Nos |
| 6 | 6 | Water Analysis Kit\nFull Specification as per Annexure “H” | item6 | 4 | Nos |
| 7 | 7 | Digital Electronic Balance :- \nFull Specification as per Annexure “H” | item7 | 4 | Nos |
| 8 | 8 | B. O. D. Incubator\nFull Specification as per Annexure “H” | item8 | 4 | Nos |
| 9 | 9 | COD ANALYSIS SYSTEM\nFull Specification as per Annexure “H” | item9 | 5 | Nos |
| 10 | 10 | DO Meter\nFull Specification as per Annexure “H” | item10 | 4 | Nos |
| 11 | 11 | Refrigerator: \nFull Specification as per Annexure “H” | item11 | 4 | Nos |
| 12 | 12 | Jar test apparatus\nFull Specification as per Annexure “H” | item12 | 5 | Nos |
| 13 | 13 | Oven Universal :\nFull Specification as per Annexure “H” | item13 | 4 | Nos |
| 14 | 14 | Digital Turbidity Meters\nFull Specification as per Annexure “H” | item14 | 5 | Nos |
| 15 | 15 | Plastic Limit Set (IS: 2720 Part 7)\nFull Specification as per Annexure “H” | item15 | 20 | Nos |
| 16 | 16 | Liquid Limit Cone Penetrometer (IS: 2720 Part 5)\nFull Specification as per Annexure “H” | item16 | 4 | Nos |
| 17 | 17 | Liquid Limit Device (IS: 2720 Part 5 )\nFull Specification as per Annexure “H” | item17 | 8 | Nos |
| 18 | 18 | Core cutter (IS: 2720 Part 29)\nFull Specification as per Annexure “H” | item18 | 8 | Nos |
| 19 | 19 | Standard Compaction Test (IS: 2720 Part 7)\nFull Specification as per Annexure “H” | item19 | 8 | Nos |
| 20 | 20 | Heavy compaction Test (IS: 2720 Part 8)\nFull Specification as per Annexure “H” | item20 | 4 | Nos |
| 21 | 21 | Pycnometer: \nFull Specification as per Annexure “H” | item21 | 24 | Nos |
| 22 | 22 | Infra-Red Moisture Meter: \nFull Specification as per Annexure “H” | item22 | 4 | Nos |
| 23 | 23 | Direct Shear Apparatus should be conforming to \nFull Specification as per Annexure “H” | item23 | 5 | Nos |
| 24 | 24 | Sand Pouring Cylinder \nFull Specification as per Annexure “H” | item24 | 8 | Nos |
| 25 | 25 | Unconfined Compression Tester- Proving Ring Type (Motorised) \nFull Specification as per Annexure “H” | item25 | 4 | Nos |
| 26 | 26 | Permeability Apparatus \nFull Specification as per Annexure “H” | item26 | 4 | Nos |
| 27 | 27 | Standard Penetration Test \nFull Specification as per Annexure “H” | item27 | 4 | Nos |
| 28 | 28 | Sieves:\nFull Specification as per Annexure “H” | item28 | 24 | Nos |
| 29 | 29 | Sieves:\nFull Specification as per Annexure “H” | item29 | 24 | Nos |
| 30 | 30 | Sieve Shaker ‘Gyratory’\nFull Specification as per Annexure “H” | item30 | 4 | Nos |
| 31 | 31 | Auger outfit (Helical type)\nFull Specification as per Annexure “H” | item31 | 12 | Nos |
| 32 | 32 | Auger outfit (Helical type)\nFull Specification as per Annexure “H” | item32 | 12 | Nos |
| 33 | 33 | Oven Universal : \nFull Specification as per Annexure “H” | item33 | 8 | Nos |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
Completed