Rural Development And Panchayats Department has published Providing Extension Of Pipe Line With Fhtc At Kattoorani Village In Peravoor Panchayat , Part Ii: Construction Of 60000 Lit Capacity Of Oht Tank At Kattoorani Village In Peravoor Panchayat, Part Iii: Construction Of 30000 Lit Capacity Of Oht Tank And Prov. Submission Date for this Tender is 27-07-2020. Pipe Laying Tenders in Ramanathapuram Tamil Nadu. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 23-Jul-2020 | Date corrigendum to Ramnad/Providing FHTC to Rural Households/Package No. 01/JJM/2020-21 under JJM Scheme | Date | 27-07-2020 |
Name of Work : Part I: Providing Extension of pipe line With FHTC at Kattoorani Village in Peravoor Panchayat , Part II: Construction of 60000 lit Capacity of OHT Tank at Kattoorani Village in Peravoor Panchayat, Part III: Construction of 30000 lit Capacity Of OHT Tank and Providing Extension of pipe line With FHTC at MGR Nagar in Peravoor Panchayat | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1 | Part I: Providing Extension of pipe line With FHTC at Kattoorani Village in Peravoor Panchayat , | 1 | ||
2 | 2 | Distribution System | 2 | ||
3 | 3 | Supply,delivery, laying and jointing of 90mm OD PVC 4Ksc pipe inlcuding earth work excavation in all strata soil, refilling and hydraulic testing, adopting standard specification and as directed by TWAD Board Officer. | 3 | 7.3 | Km |
4 | 4 | Supply of PVC specials as per BIS 10124/1988 Part 1 to 13 &BIS 7834/1975 with ISI Marks to site of works | 4 | ||
5 | 5 | 90mm PVC Bend | 5 | 128 | Nos |
6 | 6 | 90mm X 80mm PVC Threaded coupler | 6 | 115 | Nos |
7 | 7 | 90mm x 75 mm PVC Tee | 7 | 48 | Nos |
8 | 8 | 90mm PVC End cap | 8 | 42 | Nos |
9 | 9 | Supply and delivery of GI pipes medium class as per IS.1239/part I/ 1990 to site of work with ISI Marking | 9 | ||
10 | 10 | 80mm GI pipe | 10 | 192 | m |
11 | 11 | Supply and delivery of GI specials to site of work as per IS specification with ISI marking | 11 | ||
12 | 12 | 80mm GI Elbow | 12 | 20 | Nos |
13 | 13 | 80mm GI coupling | 13 | 42 | Nos |
14 | 14 | Laying and jointing of GI Pipes with GI specials and PVC specials etc (80mm Dia GI Pipe) | 14 | 192 | m |
15 | 15 | BT Road or Macadam Road | 15 | 97.2 | m |
16 | 16 | Provision for gate value 80 mm | 16 | 1 | Nos |
17 | 17 | Provision for pit for Gate Value 90X75cm | 17 | 1 | Nos |
18 | 18 | DISTRIBUTION MAIN - Fixing of Water meter | 18 | ||
19 | 19 | Provision for 50 mm Water meter | 19 | 1 | Nos |
20 | 20 | Provision for Water meter Dirt BOX | 20 | 1 | Nos |
21 | 21 | Provision for Water meter erection charges | 21 | 1 | Nos |
22 | 22 | Provision for pit for Water metre 90X75cm | 22 | 1 | Nos |
23 | 23 | Provision for FHTC's(8 meter length per FHTC) | 23 | 365 | Nos |
24 | 24 | Restoration of the Road for Road cut portion | 24 | ||
25 | 25 | Construction of Granular Sub base (Gr III) by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method) | 25 | 16.2 | Cum |
26 | 26 | Cement concrete 1:4:8 mix using 20mm ISS metal including cost and all cost and conveyance of materials and all labour charges etc complete | 26 | 10.8 | Cum |
27 | 27 | Cement concrete 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance and all other labour charges etc complete. | 27 | 10.8 | Cum |
28 | 28 | Part II: Construction of 60000 lit Capacity of OHT Tank at Kattoorani Village in Peravoor Panchayat, | 28 | ||
29 | 29 | Earthwork excavation and depositing on bank with an initial lead of 10 m and lift of 2m in Hard stiff clay blcak cotton, hard red earth, shales, murram, ordinary gravel, stoney earth and earth (First Depth of 2m) | 29 | 121.68 | Cum |
30 | 30 | Earthwork excavation and depositing on bank with an initial lead of 10 m and lift of 2m in Hard stiff clay blcak cotton, hard red earth, shales, murram, ordinary gravel, stoney earth and earth (Second Depth of 2m) | 30 | 33.462 | Cum |
31 | 31 | Sand filling with clear river sand including cost of sand watering, ramming and consolidation etc. complete | 31 | 18.252 | Cum |
32 | 32 | Cement concrete 1:4:8 (One cement four sand and eight aggregates) using 40mm HBGS for leveling course including the cost of mixing concrete, ramming, curing etc. complete | 32 | 9.126 | Cum |
33 | 33 | RCC 1:1.5:3 using 20mm HBGS excluding cost of reinforcement, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating with mechanical vibrator, finishing, curing etc. complete (1.5m to 4.5m below GL) | 33 | 34.656 | Cum |
34 | 34 | RCC 1:1.5:3 using 20mm HBGS excluding cost of reinforcement, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating with mechanical vibrator, finishing, curing etc. complete ( 0 to 1.5m below GL) | 34 | 2.778 | Cum |
35 | 35 | RCC 1:1.5:3 using 20mm HBGS excluding cost of reinforcement, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating with mechanical vibrator, finishing, curing etc. complete (0 m to 4.5m from GL) | 35 | 3.559 | Cum |
36 | 36 | RCC 1:1.5:3 using 20mm HBGS excluding cost of reinforcement, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating with mechanical vibrator, finishing, curing etc. complete (4.5m to 7.32m from GL) | 36 | 3.069 | Cum |
37 | 37 | RCC 1:1.5:3 using 20mm HBGS excluding cost of reinforcement, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating with mechanical vibrator, finishing, curing etc.complete (7.33m to 10.98m from GL) | 37 | 3.637 | Cum |
38 | 38 | RCC 1:1.5:3 using 20mm HBGS excluding cost of reinforcement, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating with mechanical vibrator, finishing, curing etc.complete (10.98m to 14.64m from GL) | 38 | 15.803 | Cum |
39 | 39 | RCC 1:1.5:3 using 20mm HBGS excluding cost of reinforcement, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating with mechanical vibrator, finishing, curing etc.complete (14.64m to 18.30m from GL) | 39 | 7.552 | Cum |
40 | 40 | Supplying and erecting steel centering for sides and soffits including necessary supports and shuttering to the required height for RCC items using MS sheets or suitable size of BG 10 stiffened with welded MS angles of size 25mm x 25mm x 3mm of boarding, laid over Silver Oak joists of size 10cm X 6.5cm space at 10cm c/c and supported by Casurino Props 10cm - 13cm spaced at 75cm c/c etc., complete | 40 | ||
41 | 41 | Plane Surface (Below G.L.) | 41 | 33.273 | Sqm |
42 | 42 | Plane Surface (G.L. to 3.30m) | 42 | 38.465 | Sqm |
43 | 43 | Plane Surface (5.31 to 6.30m) | 43 | 16.929 | Sqm |
44 | 44 | Plane Surface (8.30 to 9.30m) | 44 | 16.929 | Sqm |
45 | 45 | Plane Surface (11.30 to 12.30m) | 45 | 52.906 | Sqm |
46 | 46 | Square columns (Below Ground Level) | 46 | 25.74 | Sqm |
47 | 47 | Square columns (3.31 to 4.30m) | 47 | 4.64 | Sqm |
48 | 48 | Square columns (4.31 to 5.30m) | 48 | 5.6 | Sqm |
49 | 49 | Square columns (5.31 to 6.30m) | 49 | 4.64 | Sqm |
50 | 50 | Square columns (6.31 to 7.30m) | 50 | 5.6 | Sqm |
51 | 51 | Square columns (7.31 to 8.30m) | 51 | 5.6 | Sqm |
52 | 52 | Square columns (8.31 to 9.30m) | 52 | 4.55 | Sqm |
53 | 53 | Square columns (9.31 to 10.30m) | 53 | 5.6 | Sqm |
54 | 54 | Square columns (10.31 to 11.30m) | 54 | 5.6 | Sqm |
55 | 55 | Square columns (11.31 to 12.30m) | 55 | 0.56 | Sqm |
56 | 56 | Curved Surface | 56 | ||
57 | 57 | Curved Surface (11.31m to 12.30m) | 57 | 4.607 | Sqm |
58 | 58 | Curved Surface (12.31m to 13.30m) | 58 | 32.484 | Sqm |
59 | 59 | Curved Surface (13.31m to 14.30m) | 59 | 32.484 | Sqm |
60 | 60 | Curved Surface (14.31m to 15.30m) | 60 | 47.106 | Sqm |
61 | 61 | Painting two coats with approved Cement paint over one coat of priming coat over cement plastered exposed surface of the Reservoir including cleaning, preparing the surface and curing etc. complete | 61 | 226.401 | Sqm |
62 | 62 | Supplying fabricating and placing in position of HSD steel rods for reinforcement including the cost of steel and binding wire etc. complete | 62 | 8893 | Kg |
63 | 63 | Fabrication, supply, delivery and fixing of outside MS ladder wide 45cm made out of 50x50x6mm MS angle for sides and steps in 16mm MS plain rods fixed at 30cm centre to centre with hand rails at top top for 2 m inclined height and also with necessary projecting arms at the top and bottom for proper resting with one coat of redoxide paint, loading, transit, unloading, insurance charges, taxes etc., complete and as directed by Departmental officers. | 63 | 1 | Nos |
64 | 64 | Providing and fixing of RCC inner access ladder in RCC 1:1.5:3 (One cement, one and half sand and three aggregates) using 20mm HBG stone for OHT including cost of reinforcement, placing grill in position, centering shuttering charges, mixing concrete curing etc., complete | 64 | 1 | Nos |
65 | 65 | Providing 110mm PVC ventilating arrangements mosquito proof nylon net with and as directed by departmental Officers. | 65 | 2 | Nos |
66 | 66 | Supplying and fixing cut stone of size 0.30mX0.30mX.15m in CM 1:3 below inlet pipe for service reservior as directed | 66 | 1 | Nos |
67 | 67 | Providing manhole cover of size 0.60 x 0.60M in RCC 1:1.5:3 with suitable reinforcement and 50x50x6mm MS angle fixed along edges | 67 | 1 | Nos |
68 | 68 | Provision for pipe connection arrangements for inlet, outlet scour and overflow etc. including cost of pipes, specials, valve, labour charge for lifting, aligning, cutting, threading, fixing and painting of GI pipes with two coats of approved quality enamel paint etc., complete | 68 | ||
69 | 69 | 65mm G.I. Pipe inlet & Out let | 69 | 47 | m |
70 | 70 | 90mm PVC Threaded coupler | 70 | 1 | Nos |
71 | 71 | 63mm PVC Threaded coupler | 71 | 2 | Nos |
72 | 72 | GI Bend 90 | 72 | 5 | Nos |
73 | 73 | 65mm dia G.I. Coupling | 73 | 5 | Nos |
74 | 74 | 65mm dia G.I.Tee | 74 | 4 | Nos |
75 | 75 | 65mm dia G.I.union | 75 | 2 | Nos |
76 | 76 | 65mm dia G.I.Elbow | 76 | 1 | Nos |
77 | 77 | 50mm dia G.I.Elbow | 77 | 1 | Nos |
78 | 78 | 50mm dia G.I.union | 78 | 2 | Nos |
79 | 79 | 65mm X50mm GI Reducer | 79 | 1 | Nos |
80 | 80 | 75mm X63mm PVC Reducer | 80 | 2 | Nos |
81 | 81 | 65mmG.M. Gate Valve | 81 | 2 | Nos |
82 | 82 | 50mmG.M. Gate Valve | 82 | 1 | Nos |
83 | 83 | 63mm PVC Pipe | 83 | 6 | Nos |
84 | 84 | Refilling the foundation with excavated earth including consolidation as directed by the Departmental officers | 84 | 90.33 | Cum |
85 | 85 | Part III: Construction of 30000 lit Capacity Of OHT Tank and Providing Extension of pipe line With FHTC at MGR Nagar in Peravoor Panchayat | 85 | ||
86 | 86 | Distribution System | 86 | ||
87 | 87 | Supply,delivery, laying and jointing of 90mm OD PVC 4Ksc pipe inlcuding earth work excavation in all strata soil, refilling and hydraulic testing, adopting standard specification and as directed by TWAD Board Officer. | 87 | 3.78 | Km |
88 | 88 | Supply of PVC specials as per BIS 10124/1988 Part 1 to 13 &BIS 7834/1975 with ISI Marks to site of works | 88 | ||
89 | 89 | 90mm PVC Bend | 89 | 68 | Nos |
90 | 90 | 90mm X 80mm PVC Threaded coupler | 90 | 42 | Nos |
91 | 91 | 90mm x 75 mm PVC Tee | 91 | 48 | Nos |
92 | 92 | 90mm PVC End cap | 92 | 32 | Nos |
93 | 93 | Supply and delivery of GI pipes medium class as per IS.1239/part I/ 1990 to site of work with ISI Marking | 93 | ||
94 | 94 | 80mm GI pipe | 94 | 140 | m |
95 | 95 | Supply and delivery of GI specials to site of work as per IS specification with ISI marking | 95 | ||
96 | 96 | 80mm GI Elbow | 96 | 22 | Nos |
97 | 97 | 80mm GI coupling | 97 | 40 | Nos |
98 | 98 | Laying and jointing of GI Pipes with GI specials and PVC specials etc (80mm Dia GI Pipe) | 98 | 140 | m |
99 | 99 | BT Road or Macadam Road | 99 | 70.88 | m |
100 | 100 | Provision for gate value 80 mm | 100 | 1 | Nos |
101 | 101 | Provision for pit for Gate Value 90X75cm | 101 | 1 | Nos |
102 | 102 | DISTRIBUTION MAIN - Fixing of Water meter | 102 | ||
103 | 103 | Provision for 50 mm Water meter | 103 | 1 | Nos |
104 | 104 | Provision for Water meter Dirt BOX | 104 | 1 | Nos |
105 | 105 | Provision for Water meter erection charges | 105 | 1 | Nos |
106 | 106 | Provision for pit for Water metre 90X75cm | 106 | 1 | Nos |
107 | 107 | Provision for FHTC's(8 meter length per FHTC) | 107 | 151 | Nos |
108 | 108 | Restoration of the Road for Road cut portion | 108 | ||
109 | 109 | Construction of Granular Sub base (Gr III) by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method) | 109 | 11.475 | Cum |
110 | 110 | Cement concrete 1:4:8 mix using 20mm ISS metal including cost and all cost and conveyance of materials and all labour charges etc complete | 110 | 7.65 | Cum |
111 | 111 | Cement concrete 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance and all other labour charges etc complete. | 111 | 7.65 | Cum |
112 | 112 | Provision for 30000 Lit OHT | 112 | ||
113 | 113 | Earthwork excavation and depositing on bank with an initial lead of 10 m and lift of 2m in Hard stiff clay blcak cotton, hard red earth, shales, murram, ordinary gravel, stoney earth and earth (First Depth of 2m) | 113 | 58.55 | Cum |
114 | 114 | Earthwork excavation and depositing on bank with an initial lead of 10 m and lift of 2m in Hard stiff clay blcak cotton, hard red earth, shales, murram, ordinary gravel, stoney earth and earth (Second Depth of 2m) | 114 | 13.12 | Cum |
115 | 115 | Sand filling with clear river sand including cost of sand watering, ramming and consolidation etc. complete | 115 | 8.75 | Cum |
116 | 116 | Cement concrete 1:4:8 (One cement four sand and eight aggregates) using 40mm HBGS for leveling course including the cost of mixing concrete, ramming, curing etc. complete | 116 | 4.37 | Cum |
117 | 117 | RCC 1:1.5:3 using 20mm HBGS excluding cost of reinforcement, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating with mechanical vibrator, finishing, curing etc. complete (1.5m to 4.5m below GL) | 117 | 13.52 | Cum |
118 | 118 | RCC 1:1.5:3 using 20mm HBGS excluding cost of reinforcement, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating with mechanical vibrator, finishing, curing etc. complete ( 0 to 1.5m below GL) | 118 | 1.75 | Cum |
119 | 119 | RCC 1:1.5:3 using 20mm HBGS excluding cost of reinforcement, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating with mechanical vibrator, finishing, curing etc. complete (0 m to 4.5m from GL) | 119 | 2.83 | Cum |
120 | 120 | RCC 1:1.5:3 using 20mm HBGS excluding cost of reinforcement, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating with mechanical vibrator, finishing, curing etc. complete (4.5m to 7.32m from GL) | 120 | 2.22 | Cum |
121 | 121 | RCC 1:1.5:3 using 20mm HBGS excluding cost of reinforcement, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating with mechanical vibrator, finishing, curing etc.complete (7.33m to 10.98m from GL) | 121 | 2.53 | Cum |
122 | 122 | RCC 1:1.5:3 using 20mm HBGS excluding cost of reinforcement, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating with mechanical vibrator, finishing, curing etc.complete (10.98m to 14.64m from GL) | 122 | 11.4 | Cum |
123 | 123 | RCC 1:1.5:3 using 20mm HBGS excluding cost of reinforcement, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating with mechanical vibrator, finishing, curing etc.complete (14.64m to 18.30m from GL) | 123 | 3.09 | Cum |
124 | 124 | Supplying and erecting steel centering for sides and soffits including necessary supports and shuttering to the required height for RCC items using MS sheets or suitable size of BG 10 stiffened with welded MS angles of size 25mm x 25mm x 3mm of boarding, laid over Silver Oak joists of size 10cm X 6.5cm space at 10cm c/c and supported by Casurino Props 10cm - 13cm spaced at 75cm c/c etc., complete | 124 | ||
125 | 125 | Plane Surface (Below G.L.) | 125 | 19.94 | Sqm |
126 | 126 | Plane Surface (G.L. to 3.30m) | 126 | 25.92 | Sqm |
127 | 127 | Plane Surface (5.31 to 6.30m) | 127 | 11.91 | Sqm |
128 | 128 | Plane Surface (8.30 to 9.30m) | 128 | 11.91 | Sqm |
129 | 129 | Plane Surface (11.30 to 12.30m) | 129 | 40.03 | Sqm |
130 | 130 | Square columns (Below Ground Level) | 130 | 21.42 | Sqm |
131 | 131 | Square columns (3.31 to 4.30m) | 131 | 4.08 | Sqm |
132 | 132 | Square columns (4.31 to 5.30m) | 132 | 4.8 | Sqm |
133 | 133 | Square columns (5.31 to 6.30m) | 133 | 3.99 | Sqm |
134 | 134 | Square columns (6.31 to 7.30m) | 134 | 4.8 | Sqm |
135 | 135 | Square columns (7.31 to 8.30m) | 135 | 4.8 | Sqm |
136 | 136 | Square columns (8.31 to 9.30m) | 136 | 3.99 | Sqm |
137 | 137 | Square columns (9.31 to 10.30m) | 137 | 4.8 | Sqm |
138 | 138 | Square columns (10.31 to 11.30m) | 138 | 4.8 | Sqm |
139 | 139 | Square columns (11.31 to 12.30m) | 139 | 0.72 | Sqm |
140 | 140 | Curved Surface | 140 | ||
141 | 141 | Curved Surface (11.31m to 12.30m) | 141 | 2.48 | Sqm |
142 | 142 | Curved Surface (12.31m to 13.30m) | 142 | 26.2 | Sqm |
143 | 143 | Curved Surface (13.31m to 14.30m) | 143 | 26.2 | Sqm |
144 | 144 | Curved Surface (14.31m to 15.30m) | 144 | 26.86 | Sqm |
145 | 145 | Painting two coats with approved Cement paint over one coat of priming coat over cement plastered exposed surface of the Reservoir including cleaning, preparing the surface and curing etc. complete | 145 | 166.57 | Sqm |
146 | 146 | Supplying fabricating and placing in position of HSD steel rods for reinforcement including the cost of steel and binding wire etc. complete | 146 | 5103 | Kg |
147 | 147 | Fabrication, supply, delivery and fixing of outside MS ladder wide 45cm made out of 50x50x6mm MS angle for sides and steps in 16mm MS plain rods fixed at 30cm centre to centre with hand rails at top top for 2 m inclined height and also with necessary projecting arms at the top and bottom for proper resting with one coat of redoxide paint, loading, transit, unloading, insurance charges, taxes etc., complete and as directed by Departmental officers. | 147 | 1 | Nos |
148 | 148 | Providing and fixing of RCC inner access ladder in RCC 1:1.5:3 (One cement, one and half sand and three aggregates) using 20mm HBG stone for OHT including cost of reinforcement, placing grill in position, centering shuttering charges, mixing concrete curing etc., complete | 148 | 1 | Nos |
149 | 149 | Providing 110mm PVC ventilating arrangements mosquito proof nylon net with and as directed by departmental Officers. | 149 | 2 | Nos |
150 | 150 | Supplying and fixing cut stone of size 0.30mX0.30mX.15m in CM 1:3 below inlet pipe for service reservior as directed | 150 | 1 | Nos |
151 | 151 | Providing manhole cover of size 0.60 x 0.60M in RCC 1:1.5:3 with suitable reinforcement and 50x50x6mm MS angle fixed along edges | 151 | 1 | Nos |
152 | 152 | Provision for pipe connection arrangements for inlet, outlet scour and overflow etc. including cost of pipes, specials, valve, labour charge for lifting, aligning, cutting, threading, fixing and painting of GI pipes with two coats of approved quality enamel paint etc., complete | 152 | ||
153 | 153 | 65mm G.I. Pipe inlet & Out let | 153 | 47 | m |
154 | 154 | 50mm G.I. Pipe inlet & Out let | 154 | 13 | m |
155 | 155 | 90mm PVC Threaded coupler | 155 | 1 | Nos |
156 | 156 | 63mm PVC Threaded coupler | 156 | 2 | Nos |
157 | 157 | GI Bend 90 | 157 | 5 | Nos |
158 | 158 | GI Bend Short | 158 | 1 | Nos |
159 | 159 | 65mm dia G.I. Coupling | 159 | 5 | Nos |
160 | 160 | 65mm dia G.I.Tee | 160 | 4 | Nos |
161 | 161 | 65mm dia G.I.union | 161 | 2 | Nos |
162 | 162 | 65mm dia G.I.Elbow | 162 | 1 | Nos |
163 | 163 | 50mm dia G.I.Elbow | 163 | 1 | Nos |
164 | 164 | 50mm dia G.I.union | 164 | 2 | Nos |
165 | 165 | 65mm X50mm GI Reducer | 165 | 1 | Nos |
166 | 166 | 75mm X63mm PVC Reducer | 166 | 2 | Nos |
167 | 167 | 65mmG.M. Gate Valve | 167 | 2 | Nos |
168 | 168 | 50mmG.M. Gate Valve | 168 | 1 | Nos |
169 | 169 | 63mm PVC Pipe | 169 | 6 | Nos |
170 | 170 | Refilling the foundation with excavated earth including consolidation as directed by the Departmental officers | 170 | 43.54 | Cum |
171 | 171 | GST | 171 | ||
172 | 172 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}\n | 172 | 1 | GST Amount (in Rupees) |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail