| 1 | 1 | Tarring | BI01010001010000000000000515BI0100001113 | | |
|---|
| 2 | 1.001 | 3.15.2 : Compacting Original Ground<br>\n(ii) Compacting original ground supporting subgrade<br>\nLoosening of the ground upto a level of 300 mm below the subgrade level, watered, graded and compacted in layers to meet requirement of Tables 300.1 and 300.2 for subgrade construction as per Technical Specification Clause 303.5.2. | BI01010001010000000000000515BI0100001114 | 56 | cum |
|---|
| 3 | 1.002 | 4.11.2 : Granular sub-base/base/surface course with local materials (Table 400.13) by mix in place method normal. Construction of granular sub-base by providing local material spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at once and compacting with smooth wheel roller to achieve the desired density complete as per Clause 401.4 as per Technical Specification Clause 408. <br>(ii)\tUsing Gravel mix soil. | BI01010001010000000000000515BI0100001115 | 56 | cum |
|---|
| 4 | 1.003 | 4.9 : Wet Mix Macadam\t<br>\t\t\nProviding, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406.\t\t<br>\t\nBy Mechanical Means with 1 km lead | BI01010001010000000000000515BI0100001116 | 63 | cum |
|---|
| 5 | 1.004 | 75.5.1.1pb : Prime Coat - Low porosity - With Packed Bitumen Rates <br> Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502 | BI01010001010000000000000515BI0100001117 | 420 | sqm |
|---|
| 6 | 1.005 | 75.5.2.3pb : Tack Coat - With Packed Bitumen Rates <br> Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503. | BI01010001010000000000000515BI0100001118 | 420 | sqm |
|---|
| 7 | 1.006 | od723438/2020_2021 : Plastic Roads - Bitumen S-65 <br><br>20mm thick Open-Graded Premix Carpet using Bituminous (penetration grade/modified bitumen) Binder<br><br>Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of either Type A or Type B or Type C as per Technical Specification Clause 508 (with 7% of bitumen replaced by shredded waste plastic) packed bitumen rates<br><br>Case - I By Manual Means<br><br>(II)Bitumen (S-65) (VG - 30) 14.6 kg/10sqm | BI01010001010000000000000515BI0100001119 | 420 | sqm |
|---|
| 8 | 1.007 | 75.5.12.A.3.2pb : Seal Coat - Manual Means - Type C - Bitumen S-65 - Packed Bitumen Rates <br> Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type A, Type B and Type C as per Technical Specification Clause 510\t<br>\nA.\tBy Manual Means\t<br>\nCase III : Type C\t<br>\t\t\t\n(II)\tBitumen (S-65) | BI01010001010000000000000515BI0100001120 | 420 | sqm |
|---|
| 9 | 2 | Concreting | BI01010001010000000000000515BI0100001121 | | |
|---|
| 10 | 2.001 | 16.42 : Cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 40 mm nominal size ) in pavements, laid to required slope and camber in panels as required including consolidation finishing and tamping complete | BI01010001010000000000000515BI0100001122 | 38.663 | cum |
|---|
| 11 | 2.002 | 51.2.3 : Filling with Quarry Muck <br> Filling up low lying and water logged areas with local material/ quarry muck, spreading in layers, leveling the top at site and consolidation by ramming, etc complete for improving the CBR value of subgrade | BI01010001010000000000000515BI0100001123 | 11.775 | cum |
|---|
| 12 | 2.003 | od561845/2019_2020 : Charges for name board including fabrication, lettering, painting, fixing in position etc complete | BI01010001010000000000000515BI0100001124 | 1 | each |
|---|