Outsourcing Of Services For Operation And Maintenance Of Electric Supply At Mil Stn Vairengte Lailapur And Aizwal Under Ge Silchar
Tender Overview
Project Description
Outsourcing Of Services For Operation And Maintenance Of Electric Supply At Mil Stn Vairengte Lailapur And Aizwal Under Ge Silchar
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 23-Jul-2020 | Corrigendum_Amdt_1 | Other | 29-Jul-2020 |
| 2 | 29-Jul-2020 | Bid Auto Extn Corrigendum | Bid Auto Extn Corrigendum | 05-Aug-2020 |
BOQ
| Name of Work: OUTSOURCING OF SERVICES FOR OPERATION AND MAINT OF ELECTRIC SUPPLY AT MIL STN VAIRENGTE, LAILAPUR & AIZWAL UNDER GE SILCHAR. | |||||
|---|---|---|---|---|---|
| Sl.No. | Item Description | Item Code / Make | Quantity | Units | |
| 1 | 1 | Outsourcing of service for operation and maint of main receiving station (HT) located at 11/0.433 KV sub station at sector \"A\" AIZWAL by deploying ONE ELECTRICIAN (SKILLED) IN EACH SHIFT ROUND THE CLOCK(24 Hours) IN THREE SHIFT PER DAY (8 HOURS PER SHIFT)(First shift 0600 hrs to 1400 hrs, Second shift 1400 hrs to 2200 hrs and Third shift 2200 Hours to 0600 Hours), including Sundays & Holidays, maintaining the log sheet/register for incoming & outgoing feeders as directed & shown by Engr-in-Charge and also attending breakdowns/ repairs on break down complaint calls of LT supply of any nature in the area and rectifying the problems by replacing fuses and repair / replacement of MCCB / MCBs etc and restore the electric supply in area with necessary arrangement etc consisting of following:- (a) Main LT panel and connecting sub LT panel..\n(b) LT Over head conductor/ UG cables - 12 KM approx\nNOTE:-\n(a) Cost include the rate of the fuses, aluminium conductor for jumper aluminium lugs & misc items atc as requiredas required.\n(b) Safety equipments of workmen shall be provided by the contractor on his own cost. | 1002 | Per Shift | |
| 2 | 1.01 | (c) Protective clothing as per IS and safety instructions are to be provided by the contractor and will be continuously in use of the Operator on duty. No extra payment shall be made to the contractor for the same.\n(d) SHIFT DUTIES (TIMMINGS)\n (i) Morning Shift : 0600 Hours to 1400 Hours\n (ii) Evening Shift : 1400 Hours to 2200 Hours\n (iii) Night Shift : 2200 Hours to 0600 Hours (Note: 01 operator per shift i.e total three shift -03 No operator)\n(e) All tradesmen being deployed by the contractor for rendering manning and operation services for E/M installation should posses adequate and minimum educational qualification (i.e ITI in requisite trade) from any Govt. Recognized institution.\n(f) Attendance register and nominal roll of tradesmen depolyed in each location must be meticuously maintained.\n(g) All tradesmen deployed by the contractor should not wear loose clothes while operating plant and machinery. Proper clothing (preferably a overall combination) with name plate and required protective gears (like helmets, hand goves goggles, rubber boots etc wherever necessitated) will be made available by the contractor.\n(h) Under no circumstances the tradesmen is engaged for more than eight (8) hours per day in a shift and more than 48 hours per week.\n(j) The fire point with requisite equipments and first aid boxes will be kept in readiness in the E/M installation.\n | |||
| 3 | 2 | Outsourcing of service for operation and maint of main receiving station (HT) located at 11/0.433 KV sub station at VAIRENGTE by deploying ONE ELECTRICIAN (SKILLED) IN EACH SHIFT ROUND THE CLOCK(24 Hours) IN THREE SHIFT PER DAY (8 HOURS PER SHIFT)(First shift 0600 hrs to 1400 hrs, Second shift 1400 hrs to 2200 hrs and Third shift 2200 Hours to 0600 Hours), including Sundays & Holidays, maintaining the log sheet/register for incoming & outgoing feeders as directed & shown by Engr-in-Charge and also attending breakdowns/ repairs on break down complaint calls of LT supply of any nature in the area and rectifying the problems by replacing fuses and repair / replacement of MCCB / MCBs etc and restore the electric supply in area with necessary arrangement etc consisting of following:- (a) Main LT panel and connecting sub LT panel..\n(b) LT Over head conductor/ UG cables - 12 KM approx\nNOTE:-\n(a) Cost include the rate of the fuses, aluminium conductor for jumper aluminium lugs & misc items atc as requiredas required.\n(b) Safety equipments of workmen shall be provided by the contractor on his own cost. | 1002 | Per Shift | |
| 4 | 2.01 | (c) Protective clothing as per IS and safety instructions are to be provided by the contractor and will be continuously in use of the Operator on duty. No extra payment shall be made to the contractor for the same.\n(d) SHIFT DUTIES (TIMMINGS)\n (i) Morning Shift : 0600 Hours to 1400 Hours\n (ii) Evening Shift : 1400 Hours to 2200 Hours\n (iii) Night Shift : 2200 Hours to 0600 Hours (Note: 01 operator per shift i.e total three shift -03 No operator)\n(e) All tradesmen being deployed by the contractor for rendering manning and operation services for E/M installation should posses adequate and minimum educational qualification (i.e ITI in requisite trade) from any Govt. Recognized institution.\n(f) Attendance register and nominal roll of tradesmen depolyed in each location must be meticuously maintained.\n(g) All tradesmen deployed by the contractor should not wear loose clothes while operating plant and machinery. Proper clothing (preferably a overall combination) with name plate and required protective gears (like helmets, hand goves goggles, rubber boots etc wherever necessitated) will be made available by the contractor.\n(h) Under no circumstances the tradesmen is engaged for more than eight (8) hours per day in a shift and more than 48 hours per week.\n(j) The fire point with requisite equipments and first aid boxes will be kept in readiness in the E/M installation.\n |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-2 Issued
Clarifications on tender conditions and amendments issued.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender