Power Government Departments Closing in 0 days TDR #24821084

Various Works Under Business Plan Against Sanctioned Package No . 40/2020-21 In The Jurisdiction Of Edd-Iv , Iglas .

Issued by Government Departments · IGLAS, Uttar Pradesh
Tender Value
1.10 Lakhs
Estimated cost
Bid Submission
13 Jul 2020
0 days left
EMD
1100
Bank guarantee accepted
Document Fee
1000
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
IGLAS → Uttar Pradesh
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Various Works Under Business Plan Against Sanctioned Package No . 40 / 2020-21 In The Jurisdiction Of Edd-Iv , Iglas .-1 Cartage Of Following Pcc / St Poles Store Centre Or From Any Other Place To The Respective Site Of Work Through The Kachha Pacca Road Including The Work Of Its Loading & Unloading At The Respective Ends Also Including The Work Of Dragging Etc. And Also Including The Cost Of Labour, T&P Carrier Etc. Required For Proper Completion Of Work. ( Dist. 0 To 50 Kms. ) . 2 Pcc Poles 8.5 Mtr. / 9 Mtr. 3 St Poles 9 / 11 Mtr. 4 Cartage Of Line Material Viz Conductor / Cable, Ab Cable, Transformer, Gi Earth Wire, Cross Arm, Angle, Channel, Insulator, Clamps & Other Line Material From Store Centre Or From Any Other Place To The Respective Site Of Work Through The Kachha Pacca Road Including The Work Of Its Loading & Unloading At The Respective Ends Also Including The Work Of Dragging Etc. And Also Including The Cost Of Labour, T&P Carrier Etc. Required For Proper Completion Of Work. ( Dist. 0 To 50 Kms. ) . 5 Erection Of Single Support Including Complete H.T / L.T Fittings As Per Respo Manual And As Per Direction Of Engineer Incharge Including The Cost Of Labour, T & P And Carrier Etc. Required For Proper Completion Of Work. 6 Pcc Poles 8.5 Mtr. / 9 Mtr. 7 St Poles 9 / 11 Mtr. 8 Laying, Sagging, Stringing, Binding And Jumpering Etc. Of New / Old Line Conductor On The Newly Erected Pole As Per Respo Manual And As Per Direction Of Supervising Engineer, Including The Cost Of Arrangement Of Labour, T&P Carrier Etc. Required For Proper Completion Of Work. 9 Acsr Raccoon Conductor 10 Replacement / Re-Fixing Of Following Damaged / Disturbed / De-Aligned Accessories:- 11 11 Kv Pin Insulator 12 11 Kv V-Type Cross Arm 13 F-Bracket 14 Grouting Of Poles As Per Respo Norms Including Cost Of Grouting Material ( Cement: Sand: Brick Ballast ) Size As Per Respo Norms. This Qty Also Includes The Additional Work Of Old & Existing Lt Line Which Has To Be Converted Into Ht Line. Presently The Supports Of Old Line Do Not Have Grouting. 15 Pcc Poles 8.5 Mtr. 16 St Poles 9 / 11 Mtr. 17 Making The Plinth Of St Pole 9 / 11 Mtr. 18 Chopping Of Tree Branches Which Are Touching To 11 Kv / Lt Lines. 19 Guarding Of 11 Kv Line By Laying Two Nos. Gi Wire Parallel And Fixing Of Lacings ( Tilli ) At A Distance At 2-3 Mtr. As Per Respo Manual And Also Including The Cost Of Arragement Of Labour, T & P Etc. Required For Proper Completion Of Work. 20 Dismantling And Removal Of Existing Conductor / Cable / Gi Wire From The Various Area Preparing Their Coils And Then Stacking In The Respective Je’S ( Store ) As Per Direction Of Supervising Engineer. It Includes The Work Of Cartage, Cost Of Labour, T&P Carrier Etc. Required For Proper Completion Of Work. 21 Acsr Weasal Conductor / Gi Wire 22 Fixing Of Earthing Rod As Per Respo Manual And As Per Direction Of Supervising Engineer Including The Cost Of Labour, T&P Etc. Required For Proper Completion Of Work. 23 Erection And Grouting Of Stay Set Including The Work Of Nozzling Etc. As Per Respo Manual And Also Including The Cost Of Arrangement Of All Grouting Material, Labour, T&P Etc. Required For Proper Completion Of Work. 24 Providing And Fixing Of Stay Insulator. 25 Dismentling Of Old And Damaged Pole After Dismentling Of All Accessories. 26 Pcc Poles 8.5 Mtr. / 9 Mtr. 27 St Poles 9 / 11 Mtr. 28 Safe Carriage Of Old Line Material Viz. Conductor, G.I. Earth Wire, Abc Conductor, Cross Arm, Angle, Channel, Insulators, Clamps & Other Line Material From Any Other Place Or From Site Of Work To Store Centre / J.E. Store Of Its Loading & Unloading At The Respective Ends Including The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work. 29 Straightening Of Tilted Pcc / St Poles At Various Places As Per Direction Of Je.

BOQ

Name of Work: Various works under business plan against sanctioned package No. 40/2020-21 in the jurisdiction of EDD-IV IGLAS.
Sl.No.Item DescriptionItem Code / MakeQuantityUnits
11Cartage of following PCC/ST poles Store centre or from any other place to the respective site of work through the Kachha Pacca road including the work of its loading & unloading at the respective ends also including the work of dragging etc. and also including the cost of labour, T&P carrier etc. required for proper completion of work. (Dist. 0 to 50 Kms.).
21.01PCC poles 8.5 Mtr./ 9 Mtr.12Nos.
31.02ST poles 9/11 Mtr.2Nos.
42Cartage of line material viz Conductor/Cable, AB Cable, Transformer, GI earth wire, Cross Arm, Angle, Channel, Insulator, Clamps & other line material from Store centre or from any other place to the respective site of work through the Kachha Pacca road including the work of its loading & unloading at the respective ends also including the work of dragging etc. and also including the cost of labour, T&P carrier etc. required for proper completion of work. (Dist. 0 to 50 Kms.).14Qtl.
53Erection of single support including complete H.T/L.T fittings as per RESPO manual and as per direction of Engineer incharge including the cost of labour, T & P and carrier etc. required for proper completion of work.
63.01PCC poles 8.5 Mtr./ 9 Mtr.12Nos.
73.02ST poles 9/11 Mtr.2Nos.
84Laying, sagging, stringing, binding and jumpering etc. of new/old line conductor on the newly erected pole as per RESPO manual and as per direction of supervising engineer, including the cost of arrangement of labour, T&P carrier etc. required for proper completion of work.
94.01ACSR Raccoon Conductor10877Mtr.
105Replacement/Re-fixing of following damaged/ disturbed/de-aligned accessories:-
115.0111 KV Pin Insulator27Nos.
125.0211 KV V-type Cross Arm14Nos.
135.03F-Bracket14Nos.
146Grouting of poles as per RESPO norms including cost of grouting material (cement: sand: brick ballast) size as per RESPO norms. This qty also includes the additional work of old & existing LT line which has to be converted into HT line. Presently the supports of old line do not have grouting.
156.01PCC poles 8.5 Mtr.12Nos.
166.02ST poles 9/11 Mtr.2Nos.
177Making the plinth of ST pole 9/11 Mtr.2Nos.
188Chopping of tree branches which are touching to 11 KV/LT lines.10Nos.
199Guarding of 11 KV line by laying two nos. GI wire parallel and fixing of lacings (tilli) at a distance at 2-3 Mtr. as per RESPO manual and also including the cost of arragement of labour, T & P etc. required for proper completion of work.480Mtr.
2010Dismantling and removal of existing conductor/cable/GI Wire from the various area preparing their coils and then stacking in the respective JE’s (Store) as per direction of Supervising Engineer. It includes the work of cartage, cost of labour, T&P carrier etc. required for proper completion of work.
2110.01ACSR Weasal Conductor/ GI Wire1300Mtr.
2211Fixing of earthing rod as per RESPO manual and as per direction of supervising engineer including the cost of labour, T&P etc. Required for proper completion of work.14Nos.
2312Erection and grouting of stay set including the work of nozzling etc. as per RESPO manual and also including the cost of arrangement of all grouting material, labour, T&P etc. required for proper completion of work.12Nos.
2413Providing and fixing of stay insulator.12Nos.
2514Dismentling of old and damaged pole after dismentling of all accessories.
2614.01PCC poles 8.5 Mtr./ 9 Mtr.12Nos.
2714.02ST poles 9/11 Mtr.2Nos.
2815Safe carriage of Old line material viz. Conductor, G.I. Earth wire, ABC conductor, Cross Arm, Angle, Channel, Insulators, Clamps & other line material from any other place or from site of work to store centre/ J.E. Store of its loading & unloading at the respective ends including the cost of labour, T&P and carrier etc. required for proper completion of work.1Job
2916Straightening of tilted PCC/ST poles at various places as per direction of JE.2Nos.

AI Tender Summary

OUR REF NO 24821084
AUTHORITY Government Departments
TENDER VALUE 1.10 Lakhs
LAST DATE 13-07-2020
Authority
Authority Name Dakshinanchal Vidyut Vitran Nigam Limited
Work Description Various Works Under Business Plan Against Sanctioned Package No . 40 / 2020-21 In The Jurisdiction Of Edd-Iv , Iglas .-1 Cartage Of Following Pcc / St Poles Store Centre Or From Any Other Place To The Respective Site Of Work Through The Kachha Pacca Road Including The Work Of Its Loading & Unloading At The Respective Ends Also Including The Work Of Dragging Etc. And Also Including The Cost Of Labour, T&P Carrier Etc. Required For Proper Completion Of Work. ( Dist. 0 To 50 Kms. ) . 2 Pcc Poles 8.5 Mtr. / 9 Mtr. 3 St Poles 9 / 11 Mtr. 4 Cartage Of Line Material Viz Conductor / Cable, Ab Cable, Transformer, Gi Earth Wire, Cross Arm, Angle, Channel, Insulator, Clamps & Other Line Material From Store Centre Or From Any Other Place To The Respective Site Of Work Through The Kachha Pacca Road Including The Work Of Its Loading & Unloading At The Respective Ends Also Including The Work Of Dragging Etc. And Also Including The Cost Of Labour, T&P Carrier Etc. Required For Proper Completion Of Work. ( Dist. 0 To 50 Kms. ) . 5 Erection Of Single Support Including Complete H.T / L.T Fittings As Per Respo Manual And As Per Direction Of Engineer Incharge Including The Cost Of Labour, T & P And Carrier Etc. Required For Proper Completion Of Work. 6 Pcc Poles 8.5 Mtr. / 9 Mtr. 7 St Poles 9 / 11 Mtr. 8 Laying, Sagging, Stringing, Binding And Jumpering Etc. Of New / Old Line Conductor On The Newly Erected Pole As Per Respo Manual And As Per Direction Of Supervising Engineer, Including The Cost Of Arrangement Of Labour, T&P Carrier Etc. Required For Proper Completion Of Work. 9 Acsr Raccoon Conductor 10 Replacement / Re-Fixing Of Following Damaged / Disturbed / De-Aligned Accessories:- 11 11 Kv Pin Insulator 12 11 Kv V-Type Cross Arm 13 F-Bracket 14 Grouting Of Poles As Per Respo Norms Including Cost Of Grouting Material ( Cement: Sand: Brick Ballast ) Size As Per Respo Norms. This Qty Also Includes The Additional Work Of Old & Existing Lt Line Which Has To Be Converted Into Ht Line. Presently The Supports Of Old Line Do Not Have Grouting. 15 Pcc Poles 8.5 Mtr. 16 St Poles 9 / 11 Mtr. 17 Making The Plinth Of St Pole 9 / 11 Mtr. 18 Chopping Of Tree Branches Which Are Touching To 11 Kv / Lt Lines. 19 Guarding Of 11 Kv Line By Laying Two Nos. Gi Wire Parallel And Fixing Of Lacings ( Tilli ) At A Distance At 2-3 Mtr. As Per Respo Manual And Also Including The Cost Of Arragement Of Labour, T & P Etc. Required For Proper Completion Of Work. 20 Dismantling And Removal Of Existing Conductor / Cable / Gi Wire From The Various Area Preparing Their Coils And Then Stacking In The Respective Je’S ( Store ) As Per Direction Of Supervising Engineer. It Includes The Work Of Cartage, Cost Of Labour, T&P Carrier Etc. Required For Proper Completion Of Work. 21 Acsr Weasal Conductor / Gi Wire 22 Fixing Of Earthing Rod As Per Respo Manual And As Per Direction Of Supervising Engineer Including The Cost Of Labour, T&P Etc. Required For Proper Completion Of Work. 23 Erection And Grouting Of Stay Set Including The Work Of Nozzling Etc. As Per Respo Manual And Also Including The Cost Of Arrangement Of All Grouting Material, Labour, T&P Etc. Required For Proper Completion Of Work. 24 Providing And Fixing Of Stay Insulator. 25 Dismentling Of Old And Damaged Pole After Dismentling Of All Accessories. 26 Pcc Poles 8.5 Mtr. / 9 Mtr. 27 St Poles 9 / 11 Mtr. 28 Safe Carriage Of Old Line Material Viz. Conductor, G.I. Earth Wire, Abc Conductor, Cross Arm, Angle, Channel, Insulators, Clamps & Other Line Material From Any Other Place Or From Site Of Work To Store Centre / J.E. Store Of Its Loading & Unloading At The Respective Ends Including The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work. 29 Straightening Of Tilted Pcc / St Poles At Various Places As Per Direction Of Je.
Basic Detail
Tender No EDC2A-20/2020-21
Bidding Type Tender
Location
City IGLAS
State Uttar Pradesh
Key Dates
Publish Date 08 Jul 2020
Submission Date 13 Jul 2020
Open Date 13 Jul 2020
Finance
Tender Value 1.10 Lakhs
Tender Fee 1000
EMD 1100
Exemption Not Available
Document List
FC763DFE-034D-43A9-958F-321DA6DB1971.html
Tendernotice_1.pdf
BOQ_736997.xls
Doc20.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Jul 08, 2020
11:30 IST

Tender Published

Tender notice published.

Completed
Jul 13, 2020
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Jul 13, 2020

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
html

FC763DFE-034D-43A9-958F-321DA6DB1971.html

pdf

Tendernotice_1.pdf

xls

BOQ_736997.xls

pdf

Doc20.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders