}

Transformers Maintenance And Other Electrification Work In All District Hospital ( M/S ) And Other Pch/Chc Of Moradabad Mandal, MORADABAD-Uttar Pradesh

Medical And Health Services -MAHS has published Transformers Maintenance And Other Electrification Work In All District Hospital ( M/S ) And Other Pch/Chc Of Moradabad Mandal. Submission Date for this Tender is 09-07-2020. Bushings Tenders in MORADABAD Uttar Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

24793837
Transformers Maintenance And Other Electrification Work In All District Hospital ( M/S ) And Other Pch/Chc Of Moradabad Mandal
Open Tender
Indian
Uttar Pradesh
MORADABAD
09-07-2020

Tender Details

Transformers Maintenance And Other Electrification Work In All District Hospital ( M/S ) And Other Pch/Chc Of Moradabad Mandal , ( A ) . Maintinace Work Of Transformer 11 Kv/100Kva . ( A ) . 1 New Aluminium Coil . , Retrun Of Old Aluminium Coil . , Oil Dehydration Work Of Transformer , Supply Of Transformer Oil , Replacement Of Lt Bushing ( 1*4 ) , Replacement Of Ht Bushing ( 1*3 ) , Complete Repair Of Transformer Tank , Miner Repair Of Transformer Tank At Site , Major Repair Of Transformer Tank At Workshop , Supply Of New Tank , Supply Of Silica Gel 250 Gm With Box , Supply Of Silica Gel 500 Gm With Box , Supply Of Silica Gel 1000 Gm With Box , Replacement Work For One Radiator , Replacement Of Brass Fittings In Lv Side ( 1*4 ) , Replacement Of Brass Fittings In Hv Side ( 1*3 ) , Replacement Of Tape Changer , Transportation From Site To Contractor Workshop . ( Including Loading/Unloading , Before And After Repairing For Each Unit Of Hospitals In Moradabad Division ) , ( B ) . Maintinace Work Of Transformer 11 Kv/250Kva . ( B ) . 1 New Copper Coil . , Retrun Of Old Copper Coil . , Oil Dehydration Work Of Transformer , Supply Of Transformer Oil , Replacement Of Lt Bushing ( 1*4 ) , Replacement Of Ht Bushing ( 1*3 ) , Complete Repair Of Transformer Tank , Miner Repair Of Transformer Tank At Site , Major Repair Of Transformer Tank At Workshop , Supply Of New Tank , Supply Of Silica Gel 250 Gm With Box , Supply Of Silica Gel 500 Gm With Box , Supply Of Silica Gel 1000 Gm With Box , Replacement Work For One Radiator , Replacement Of Brass Fittings In Lv Side ( 1*4 ) , Replacement Of Brass Fittings In Hv Side ( 1*3 ) , Replacement Of Tape Changer , Transportation From Site To Contractor Workshop . ( Including Loading/Unloading , Before And After Repairing For Each Unit Of Hospitals In Moradabad Division ) , ( C . ) Maintinace Work Of Transformer 11 Kv/315Kva . C . 1 New Copper Coil . , Retrun Of Old Copper Coil . , Oil Dehydration Work Of Transformer , Supply Of Transformer Oil ( 1*4 ) , Replacement Of Lt Bushing ( 1*3 ) , Replacement Of Ht Bushing , Complete Repair Of Transformer Tank , Miner Repair Of Transformer Tank At Site , Major Repair Of Transformer Tank At Workshop , Supply Of New Tank , Supply Of Silica Gel 250 Gm With Box , Supply Of Silica Gel 500 Gm With Box , Supply Of Silica Gel 1000 Gm With Box , Replacement Work For One Radiator , Replacement Of Brass Fittings In Lv Side ( 1*4 ) , Replacement Of Brass Fittings In Hv Side ( 1*3 ) , Replacement Of Tape Changer , Transportation From Site To Contractor Workshop . ( Including Loading/Unloading , Before And After Repairing For Each Unit Of Hospitals In Moradabad Division ) , ( D ) Maintinace Work Of Transformer 11 Kv/400Kva . D . 1New Copper Coil . , Retrun Of Old Copper Coil . , Oil Dehydration Work Of Transformer , Supply Of Transformer Oil , Replacement Of Lt Bushing ( 1*4 ) , Replacement Of Ht Bushing ( 1*3 ) , Complete Repair Of Transformer Tank , Miner Repair Of Transformer Tank At Site , Major Repair Of Transformer Tank At Workshop , Supply Of New Tank , Supply Of Silica Gel 250 Gm With Box , Supply Of Silica Gel 500 Gm With Box , Supply Of Silica Gel 1000 Gm With Box , Replacement Work For One Radiator , Replacement Of Brass Fittings In Lv Side ( 1*4 ) , Replacement Of Brass Fittings In Hv Side ( 1*3 ) , Replacement Of Tape Changer , Transportation From Site To Contractor Workshop . ( Including Loading/Unloading , Before And After Repairing For Each Unit Of Hospitals In Moradabad Division ) , ( E ) Maintinace Work Of Transformer 11 Kv/630Kva . E . 1New Copper Coil . , Retrun Of Old Copper Coil . , Oil Dehydration Work Of Transformer , Supply Of Transformer Oil , Replacement Of Lt Bushing ( 1*4 ) , Replacement Of Ht Bushing ( 1*3 ) , Complete Repair Of Transformer Tank , Miner Repair Of Transformer Tank At Site , Major Repair Of Transformer Tank At Workshop , Supply Of New Tank , Supply Of Silica Gel 250 Gm With Box , Supply Of Silica Gel 500 Gm With Box , Supply Of Silica Gel 1000 Gm With Box , Replacement Work For One Radiator , Replacement Of Brass Fittings In Lv Side ( 1*4 ) , Replacement Of Brass Fittings In Hv Side ( 1*3 ) , Replacement Of Tape Changer , Transportation From Site To Contractor Workshop . ( Including Loading/Unloading , Before And After Repairing For Each Unit Of Hospitals In Moradabad Division ) , ( F ) . Maintinace Work Of Transformer 33 Kv/250Kva . F1 . New Copper Coil . , Retrun Of Old Copper Coil . , Oil Dehydration Work Of Transformer , Supply Of Transformer Oil , Replacement Of Lt Bushing ( 1*4 ) , Replacement Of Ht Bushing ( 1*3 ) , Complete Repair Of Transformer Tank , Miner Repair Of Transformer Tank At Site , Major Repair Of Transformer Tank At Workshop , Supply Of New Tank , Supply Of Silica Gel 250 Gm With Box , Supply Of Silica Gel 500 Gm With Box , Supply Of Silica Gel 1000 Gm With Box , Replacement Work For One Radiator , Replacement Of Brass Fittings In Lv Side ( 1*4 ) , Replacement Of Brass Fittings In Hv Side ( 1*3 ) , Replacement Of Tape Changer , Transportation From Site To Contractor Workshop . ( Including Loading/Unloading , Before And After Repairing For Each Unit Of Hospitals In Moradabad Division ) , ( G ) . Maintinace Work Of Transformer 33 Kv/400Kva . G1 . New Copper Coil . , Retrun Of Old Copper Coil . , Oil Dehydration Work Of Transformer , Supply Of Transformer Oil , Replacement Of Lt Bushing ( 1*4 ) , Replacement Of Ht Bushing ( 1*3 ) , Complete Repair Of Transformer Tank , Miner Repair Of Transformer Tank At Site , Major Repair Of Transformer Tank At Workshop , Supply Of New Tank , Supply Of Silica Gel 250 Gm With Box , Supply Of Silica Gel 500 Gm With Box , Supply Of Silica Gel 1000 Gm With Box , Replacement Work For One Radiator , Replacement Of Brass Fittings In Lv Side ( 1*4 ) , Replacement Of Brass Fittings In Hv Side ( 1*3 ) , Replacement Of Tape Changer , Transportation From Site To Contractor Workshop . ( Including Loading/Unloading , Before And After Repairing For Each Unit Of Hospitals In Moradabad Division ) , ( H ) . Maintinace Work Of Transformer 33 Kv/630Kva . H . 1 New Copper Coil . , Retrun Of Old Copper Coil . , Oil Dehydration Work Of Transformer , Supply Of Transformer Oil , Replacement Of Lt Bushing ( 1*4 ) , Replacement Of Ht Bushing ( 1*3 ) , Complete Repair Of Transformer Tank , Miner Repair Of Transformer Tank At Site , Major Repair Of Transformer Tank At Workshop , Supply Of New Tank , Supply Of Silica Gel 250 Gm With Box , Supply Of Silica Gel 500 Gm With Box , Supply Of Silica Gel 1000 Gm With Box , Replacement Work For One Radiator , Replacement Of Brass Fittings In Lv Side ( 1*4 ) , Replacement Of Brass Fittings In Hv Side ( 1*3 ) , Replacement Of Tape Changer , Transportation From Site To Contractor Workshop . ( Including Loading/Unloading , Before And After Repairing For Each Unit Of Hospitals In Moradabad Division ) , ( 1 ) . Supply Of New Transformer1 . A Supply Of New Transformer 100 Kva/11 Kv As Per I . S-1180 Part 11 , 2014 With All Standerd Accessories , Installation Of New Transformer Including Loading , Unloading Separate Earthing Of Nutrel And Body ( 03 No . ) And Ht/Lt Side Connection Extra Etc . , Supply Of New Transformer 250 Kva/11 Kv As Per I . S-1180 Part 11 , 2014 With All Standerd Accessories , Installation Of New Transformer Including Loading , Unloading Separate Earthing Of Nutrel And Body ( 03 No . ) And Ht/Lt Side Connection Extra Etc . , Supply Of New Transformer 315 Kva/11 Kv As Per I . S-1180 Part 11 , 2014 With All Standerd Accessories , Installation Of New Transformer Including Loading , Unloading Separate Earthing Of Nutrel And Body ( 03 No . ) And Ht/Lt Side Connection Extra Etc . , Supply Of New Transformer 400 Kva/11 Kv As Per I . S-1180 Part 11 , 2014 With All Standerd Accessories , Installati

Key Value

Document Fees
INR 1000 /-
EMD
INR 50000.0 /-
Tender Value
Refer document

BOQ Items

Name of Work: TRANSFORMERS MAINTENANCE & OTHER ELECTRIFICATION WORK IN ALL DISTRICT HOSPITAL (M/S) AND OTHER PCH/CHC OF MORADABAD MANDAL.
Sl. No. Item Description Item Code / Make Quantity Units
1 1 (A).Maintinace work of Transformer 11 KV/100KVA.\n(a).1 New Aluminium coil. 1 Per Kg
2 2 Retrun of old Aluminium coil. 1 Per Kg
3 3 Oil Dehydration work of Transformer 1 Per job
4 4 Supply of Transformer oil 1 Per Lt
5 5 Replacement of LT Bushing (1*4) 1 Each
6 6 Replacement of HT Bushing (1*3) 1 Each
7 7 Complete repair of Transformer Tank 1 Per job
8 8 Miner repair of Transformer Tank at site 1 Per job
9 9 Major repair of Transformer Tank at workshop 1 Per job
10 10 Supply of New Tank 1 Per Kg
11 11 Supply of silica gel 250 gm with box 1 No.
12 12 Supply of silica gel 500 gm with box 1 No.
13 13 Supply of silica gel 1000 gm with box 1 No.
14 14 Replacement work for one radiator 1 No.
15 15 Replacement of brass fittings in LV side (1*4) 1 Each
16 16 Replacement of brass fittings in HV side (1*3) 1 Each
17 17 Replacement of tape changer 1 No.
18 18 Transportation from site to Contractor Workshop. (including loading/unloading, before and after repairing for each unit of Hospitals in Moradabad Division) 1 Per Job
19 19 (B). Maintinace work of Transformer 11 KV/250KVA.\n(B).1 New copper coil. 1 Per Kg
20 20 Retrun of old copper coil. 1 Per Kg
21 21 Oil Dehydration work of Transformer 1 Per job
22 22 Supply of Transformer oil 1 Per Lt
23 23 Replacement of LT Bushing (1*4) 1 Each
24 24 Replacement of HT Bushing (1*3) 1 Each
25 25 Complete repair of Transformer Tank 1 Per job
26 26 Miner repair of Transformer Tank at site 1 Per job
27 27 Major repair of Transformer Tank at workshop 1 Per job
28 28 Supply of New Tank 1 Per Kg
29 29 Supply of silica gel 250 gm with box 1 No.
30 30 Supply of silica gel 500 gm with box 1 No.
31 31 Supply of silica gel 1000 gm with box 1 No.
32 32 Replacement work for one radiator 1 No.
33 33 Replacement of brass fittings in LV side (1*4) 1 Each
34 34 Replacement of brass fittings in HV side (1*3) 1 Each
35 35 Replacement of tape changer 1 No.
36 36 Transportation from site to Contractor Workshop. (including loading/unloading, before and after repairing for each unit of Hospitals in Moradabad Division) 1 Per Job
37 37 (c.) Maintinace work of Transformer 11 KV/315KVA.\nc.1 New copper coil. 1 Per Kg
38 38 Retrun of old copper coil. 1 Per Kg
39 39 Oil Dehydration work of Transformer 1 Per job
40 40 Supply of Transformer oil (1*4) 1 Per Lt
41 41 Replacement of LT Bushing (1*3) 1 Each
42 42 Replacement of HT Bushing 1 Each
43 43 Complete repair of Transformer Tank 1 Per job
44 44 Miner repair of Transformer Tank at site 1 Per job
45 45 Major repair of Transformer Tank at workshop 1 Per job
46 46 Supply of New Tank 1 Per Kg
47 47 Supply of silica gel 250 gm with box 1 No.
48 48 Supply of silica gel 500 gm with box 1 No.
49 49 Supply of silica gel 1000 gm with box 1 No.
50 50 Replacement work for one radiator 1 No.
51 51 Replacement of brass fittings in LV side (1*4) 1 Each
52 52 Replacement of brass fittings in HV side (1*3) 1 Each
53 53 Replacement of tape changer 1 No.
54 54 Transportation from site to Contractor Workshop. (including loading/unloading, before and after repairing for each unit of Hospitals in Moradabad Division) 1 Per Job
55 55 (D) Maintinace work of Transformer 11 KV/400KVA.\nd.1New copper coil. 1 Per Kg
56 56 Retrun of old copper coil. 1 Per Kg
57 57 Oil Dehydration work of Transformer 1 Per job
58 58 Supply of Transformer oil 1 Per Lt
59 59 Replacement of LT Bushing (1*4) 1 Each
60 60 Replacement of HT Bushing (1*3) 1 Each
61 61 Complete repair of Transformer Tank 1 Per job
62 62 Miner repair of Transformer Tank at site 1 Per job
63 63 Major repair of Transformer Tank at workshop 1 Per job
64 64 Supply of New Tank 1 Per Kg
65 65 Supply of silica gel 250 gm with box 1 No.
66 66 Supply of silica gel 500 gm with box 1 No.
67 67 Supply of silica gel 1000 gm with box 1 No.
68 68 Replacement work for one radiator 1 No.
69 69 Replacement of brass fittings in LV side (1*4) 1 Each
70 70 Replacement of brass fittings in HV side (1*3) 1 Each
71 71 Replacement of tape changer 1 No.
72 72 Transportation from site to Contractor Workshop. (including loading/unloading, before and after repairing for each unit of Hospitals in Moradabad Division) 1 Per Job
73 73 (E) Maintinace work of Transformer 11 KV/630KVA.\ne.1New copper coil. 1 Per Kg
74 74 Retrun of old copper coil. 1 Per Kg
75 75 Oil Dehydration work of Transformer 1 Per job
76 76 Supply of Transformer oil 1 Per Lt
77 77 Replacement of LT Bushing (1*4) 1 Each
78 78 Replacement of HT Bushing (1*3) 1 Each
79 79 Complete repair of Transformer Tank 1 Per job
80 80 Miner repair of Transformer Tank at site 1 Per job
81 81 Major repair of Transformer Tank at workshop 1 Per job
82 82 Supply of New Tank 1 Per Kg
83 83 Supply of silica gel 250 gm with box 1 No.
84 84 Supply of silica gel 500 gm with box 1 No.
85 85 Supply of silica gel 1000 gm with box 1 No.
86 86 Replacement work for one radiator 1 No.
87 87 Replacement of brass fittings in LV side (1*4) 1 Each
88 88 Replacement of brass fittings in HV side (1*3) 1 Each
89 89 Replacement of tape changer 1 No.
90 90 Transportation from site to Contractor Workshop. (including loading/unloading, before and after repairing for each unit of Hospitals in Moradabad Division) 1 Per Job
91 91 (F).Maintinace work of Transformer 33 KV/250KVA.\nf1. New copper coil. 1 Per Kg
92 92 Retrun of old copper coil. 1 Per Kg
93 93 Oil Dehydration work of Transformer 1 Per job
94 94 Supply of Transformer oil 1 Per Lt
95 95 Replacement of LT Bushing (1*4) 1 Each
96 96 Replacement of HT Bushing (1*3) 1 Each
97 97 Complete repair of Transformer Tank 1 Per job
98 98 Miner repair of Transformer Tank at site 1 Per job
99 99 Major repair of Transformer Tank at workshop 1 Per job
100 100 Supply of New Tank 1 Per Kg
101 101 Supply of silica gel 250 gm with box 1 No.
102 102 Supply of silica gel 500 gm with box 1 No.
103 103 Supply of silica gel 1000 gm with box 1 No.
104 104 Replacement work for one radiator 1 No.
105 105 Replacement of brass fittings in LV side (1*4) 1 Each
106 106 Replacement of brass fittings in HV side (1*3) 1 Each
107 107 Replacement of tape changer 1 No.
108 108 Transportation from site to Contractor Workshop. (including loading/unloading, before and after repairing for each unit of Hospitals in Moradabad Division) 1 Per Job
109 109 (G).Maintinace work of Transformer 33 KV/400KVA.\nG1.New copper coil. 1 Per Kg
110 110 Retrun of old copper coil. 1 Per Kg
111 111 Oil Dehydration work of Transformer 1 Per job
112 112 Supply of Transformer oil 1 Per Lt
113 113 Replacement of LT Bushing (1*4) 1 Each
114 114 Replacement of HT Bushing (1*3) 1 Each
115 115 Complete repair of Transformer Tank 1 Per job
116 116 Miner repair of Transformer Tank at site 1 Per job
117 117 Major repair of Transformer Tank at workshop 1 Per job
118 118 Supply of New Tank 1 Per Kg
119 119 Supply of silica gel 250 gm with box 1 No.
120 120 Supply of silica gel 500 gm with box 1 No.
121 121 Supply of silica gel 1000 gm with box 1 No.
122 122 Replacement work for one radiator 1 No.
123 123 Replacement of brass fittings in LV side (1*4) 1 Each
124 124 Replacement of brass fittings in HV side (1*3) 1 Each
125 125 Replacement of tape changer 1 No.
126 126 Transportation from site to Contractor Workshop. (including loading/unloading, before and after repairing for each unit of Hospitals in Moradabad Division) 1 Per Job
127 127 (H).Maintinace work of Transformer 33 KV/630KVA.\nh.1 New copper coil. 1 Per Kg
128 128 Retrun of old copper coil. 1 Per Kg
129 129 Oil Dehydration work of Transformer 1 Per job
130 130 Supply of Transformer oil 1 Per Lt
131 131 Replacement of LT Bushing (1*4) 1 Each
132 132 Replacement of HT Bushing (1*3) 1 Each
133 133 Complete repair of Transformer Tank 1 Per job
134 134 Miner repair of Transformer Tank at site 1 Per job
135 135 Major repair of Transformer Tank at workshop 1 Per job
136 136 Supply of New Tank 1 Per Kg
137 137 Supply of silica gel 250 gm with box 1 No.
138 138 Supply of silica gel 500 gm with box 1 No.
139 139 Supply of silica gel 1000 gm with box 1 No.
140 140 Replacement work for one radiator 1 No.
141 141 Replacement of brass fittings in LV side (1*4) 1 Each
142 142 Replacement of brass fittings in HV side (1*3) 1 Each
143 143 Replacement of tape changer 1 No.
144 144 Transportation from site to Contractor Workshop. (including loading/unloading, before and after repairing for each unit of Hospitals in Moradabad Division) 1 Per Job
145 145 (1).Supply of New Transformer\n1.a Supply of New Transformer 100 KVA/11 KV AS PER I.S-1180 PART 11, 2014 WITH ALL STANDERD ACCESSORIES 1 Each
146 146 Installation of New Transformer including loading, unloading separate earthing of Nutrel and body (03 No.) and HT/LT side Connection extra etc. 1 Job
147 147 Supply of New Transformer 250 KVA/11 KV AS PER I.S-1180 PART 11, 2014 WITH ALL STANDERD ACCESSORIES 1 Each
148 148 Installation of New Transformer including loading, unloading separate earthing of Nutrel and body (03 No.) and HT/LT side Connection extra etc. 1 Job
149 149 Supply of New Transformer 315 KVA/11 KV AS PER I.S-1180 PART 11, 2014 WITH ALL STANDERD ACCESSORIES 1 Each
150 150 Installation of New Transformer including loading, unloading separate earthing of Nutrel and body (03 No.) and HT/LT side Connection extra etc. 1 Job
151 151 Supply of New Transformer 400 KVA/11 KV AS PER I.S-1180 PART 11, 2014 WITH ALL STANDERD ACCESSORIES 1 Each
152 152 Installation of New Transformer including loading, unloading separate earthing of Nutrel and body (03 No.) and HT/LT side Connection extra etc. 1 Job
153 153 Supply of New Transformer 630 KVA/11 KV AS PER I.S-1180 PART 11, 2014 WITH ALL STANDERD ACCESSORIES 1 Each
154 154 Installation of New Transformer including loading, unloading separate earthing of Nutrel and body (03 No.) and HT/LT side Connection extra etc. 1 Job
155 155 Supply of New Transformer 250 KVA/33 KV AS PER I.S-1180 PART 11, 2014 WITH ALL STANDERD ACCESSORIES 1 Each
156 156 Installation of New Transformer including loading, unloading separate earthing of Nutrel and body (03 No.) and HT/LT side Connection extra etc. 1 Job
157 157 Supply of New Transformer 400 KVA/33 KV AS PER I.S-1180 PART 11, 2014 WITH ALL STANDERD ACCESSORIES 1 Each
158 158 Installation of New Transformer including loading, unloading separate earthing of Nutrel and body (03 No.) and HT/LT side Connection extra etc. 1 Job
159 159 Supply of New Transformer 630 KVA/33 KV AS PER I.S-1180 PART 11, 2014 WITH ALL STANDERD ACCESSORIES 1 Each
160 160 Installation of New Transformer including loading, unloading separate earthing of Nutrel and body (03 No.) and HT/LT side Connection extra etc. 1 Job
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail