Medical And Health Services -MAHS has published Transformers Maintenance And Other Electrification Work In All District Hospital ( M/S ) And Other Pch/Chc Of Moradabad Mandal. Submission Date for this Tender is 09-07-2020. Bushings Tenders in MORADABAD Uttar Pradesh. Bidders can get complete Tender details and download the document.
Name of Work: TRANSFORMERS MAINTENANCE & OTHER ELECTRIFICATION WORK IN ALL DISTRICT HOSPITAL (M/S) AND OTHER PCH/CHC OF MORADABAD MANDAL. | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1 | (A).Maintinace work of Transformer 11 KV/100KVA.\n(a).1 New Aluminium coil. | 1 | Per Kg | |
2 | 2 | Retrun of old Aluminium coil. | 1 | Per Kg | |
3 | 3 | Oil Dehydration work of Transformer | 1 | Per job | |
4 | 4 | Supply of Transformer oil | 1 | Per Lt | |
5 | 5 | Replacement of LT Bushing (1*4) | 1 | Each | |
6 | 6 | Replacement of HT Bushing (1*3) | 1 | Each | |
7 | 7 | Complete repair of Transformer Tank | 1 | Per job | |
8 | 8 | Miner repair of Transformer Tank at site | 1 | Per job | |
9 | 9 | Major repair of Transformer Tank at workshop | 1 | Per job | |
10 | 10 | Supply of New Tank | 1 | Per Kg | |
11 | 11 | Supply of silica gel 250 gm with box | 1 | No. | |
12 | 12 | Supply of silica gel 500 gm with box | 1 | No. | |
13 | 13 | Supply of silica gel 1000 gm with box | 1 | No. | |
14 | 14 | Replacement work for one radiator | 1 | No. | |
15 | 15 | Replacement of brass fittings in LV side (1*4) | 1 | Each | |
16 | 16 | Replacement of brass fittings in HV side (1*3) | 1 | Each | |
17 | 17 | Replacement of tape changer | 1 | No. | |
18 | 18 | Transportation from site to Contractor Workshop. (including loading/unloading, before and after repairing for each unit of Hospitals in Moradabad Division) | 1 | Per Job | |
19 | 19 | (B). Maintinace work of Transformer 11 KV/250KVA.\n(B).1 New copper coil. | 1 | Per Kg | |
20 | 20 | Retrun of old copper coil. | 1 | Per Kg | |
21 | 21 | Oil Dehydration work of Transformer | 1 | Per job | |
22 | 22 | Supply of Transformer oil | 1 | Per Lt | |
23 | 23 | Replacement of LT Bushing (1*4) | 1 | Each | |
24 | 24 | Replacement of HT Bushing (1*3) | 1 | Each | |
25 | 25 | Complete repair of Transformer Tank | 1 | Per job | |
26 | 26 | Miner repair of Transformer Tank at site | 1 | Per job | |
27 | 27 | Major repair of Transformer Tank at workshop | 1 | Per job | |
28 | 28 | Supply of New Tank | 1 | Per Kg | |
29 | 29 | Supply of silica gel 250 gm with box | 1 | No. | |
30 | 30 | Supply of silica gel 500 gm with box | 1 | No. | |
31 | 31 | Supply of silica gel 1000 gm with box | 1 | No. | |
32 | 32 | Replacement work for one radiator | 1 | No. | |
33 | 33 | Replacement of brass fittings in LV side (1*4) | 1 | Each | |
34 | 34 | Replacement of brass fittings in HV side (1*3) | 1 | Each | |
35 | 35 | Replacement of tape changer | 1 | No. | |
36 | 36 | Transportation from site to Contractor Workshop. (including loading/unloading, before and after repairing for each unit of Hospitals in Moradabad Division) | 1 | Per Job | |
37 | 37 | (c.) Maintinace work of Transformer 11 KV/315KVA.\nc.1 New copper coil. | 1 | Per Kg | |
38 | 38 | Retrun of old copper coil. | 1 | Per Kg | |
39 | 39 | Oil Dehydration work of Transformer | 1 | Per job | |
40 | 40 | Supply of Transformer oil (1*4) | 1 | Per Lt | |
41 | 41 | Replacement of LT Bushing (1*3) | 1 | Each | |
42 | 42 | Replacement of HT Bushing | 1 | Each | |
43 | 43 | Complete repair of Transformer Tank | 1 | Per job | |
44 | 44 | Miner repair of Transformer Tank at site | 1 | Per job | |
45 | 45 | Major repair of Transformer Tank at workshop | 1 | Per job | |
46 | 46 | Supply of New Tank | 1 | Per Kg | |
47 | 47 | Supply of silica gel 250 gm with box | 1 | No. | |
48 | 48 | Supply of silica gel 500 gm with box | 1 | No. | |
49 | 49 | Supply of silica gel 1000 gm with box | 1 | No. | |
50 | 50 | Replacement work for one radiator | 1 | No. | |
51 | 51 | Replacement of brass fittings in LV side (1*4) | 1 | Each | |
52 | 52 | Replacement of brass fittings in HV side (1*3) | 1 | Each | |
53 | 53 | Replacement of tape changer | 1 | No. | |
54 | 54 | Transportation from site to Contractor Workshop. (including loading/unloading, before and after repairing for each unit of Hospitals in Moradabad Division) | 1 | Per Job | |
55 | 55 | (D) Maintinace work of Transformer 11 KV/400KVA.\nd.1New copper coil. | 1 | Per Kg | |
56 | 56 | Retrun of old copper coil. | 1 | Per Kg | |
57 | 57 | Oil Dehydration work of Transformer | 1 | Per job | |
58 | 58 | Supply of Transformer oil | 1 | Per Lt | |
59 | 59 | Replacement of LT Bushing (1*4) | 1 | Each | |
60 | 60 | Replacement of HT Bushing (1*3) | 1 | Each | |
61 | 61 | Complete repair of Transformer Tank | 1 | Per job | |
62 | 62 | Miner repair of Transformer Tank at site | 1 | Per job | |
63 | 63 | Major repair of Transformer Tank at workshop | 1 | Per job | |
64 | 64 | Supply of New Tank | 1 | Per Kg | |
65 | 65 | Supply of silica gel 250 gm with box | 1 | No. | |
66 | 66 | Supply of silica gel 500 gm with box | 1 | No. | |
67 | 67 | Supply of silica gel 1000 gm with box | 1 | No. | |
68 | 68 | Replacement work for one radiator | 1 | No. | |
69 | 69 | Replacement of brass fittings in LV side (1*4) | 1 | Each | |
70 | 70 | Replacement of brass fittings in HV side (1*3) | 1 | Each | |
71 | 71 | Replacement of tape changer | 1 | No. | |
72 | 72 | Transportation from site to Contractor Workshop. (including loading/unloading, before and after repairing for each unit of Hospitals in Moradabad Division) | 1 | Per Job | |
73 | 73 | (E) Maintinace work of Transformer 11 KV/630KVA.\ne.1New copper coil. | 1 | Per Kg | |
74 | 74 | Retrun of old copper coil. | 1 | Per Kg | |
75 | 75 | Oil Dehydration work of Transformer | 1 | Per job | |
76 | 76 | Supply of Transformer oil | 1 | Per Lt | |
77 | 77 | Replacement of LT Bushing (1*4) | 1 | Each | |
78 | 78 | Replacement of HT Bushing (1*3) | 1 | Each | |
79 | 79 | Complete repair of Transformer Tank | 1 | Per job | |
80 | 80 | Miner repair of Transformer Tank at site | 1 | Per job | |
81 | 81 | Major repair of Transformer Tank at workshop | 1 | Per job | |
82 | 82 | Supply of New Tank | 1 | Per Kg | |
83 | 83 | Supply of silica gel 250 gm with box | 1 | No. | |
84 | 84 | Supply of silica gel 500 gm with box | 1 | No. | |
85 | 85 | Supply of silica gel 1000 gm with box | 1 | No. | |
86 | 86 | Replacement work for one radiator | 1 | No. | |
87 | 87 | Replacement of brass fittings in LV side (1*4) | 1 | Each | |
88 | 88 | Replacement of brass fittings in HV side (1*3) | 1 | Each | |
89 | 89 | Replacement of tape changer | 1 | No. | |
90 | 90 | Transportation from site to Contractor Workshop. (including loading/unloading, before and after repairing for each unit of Hospitals in Moradabad Division) | 1 | Per Job | |
91 | 91 | (F).Maintinace work of Transformer 33 KV/250KVA.\nf1. New copper coil. | 1 | Per Kg | |
92 | 92 | Retrun of old copper coil. | 1 | Per Kg | |
93 | 93 | Oil Dehydration work of Transformer | 1 | Per job | |
94 | 94 | Supply of Transformer oil | 1 | Per Lt | |
95 | 95 | Replacement of LT Bushing (1*4) | 1 | Each | |
96 | 96 | Replacement of HT Bushing (1*3) | 1 | Each | |
97 | 97 | Complete repair of Transformer Tank | 1 | Per job | |
98 | 98 | Miner repair of Transformer Tank at site | 1 | Per job | |
99 | 99 | Major repair of Transformer Tank at workshop | 1 | Per job | |
100 | 100 | Supply of New Tank | 1 | Per Kg | |
101 | 101 | Supply of silica gel 250 gm with box | 1 | No. | |
102 | 102 | Supply of silica gel 500 gm with box | 1 | No. | |
103 | 103 | Supply of silica gel 1000 gm with box | 1 | No. | |
104 | 104 | Replacement work for one radiator | 1 | No. | |
105 | 105 | Replacement of brass fittings in LV side (1*4) | 1 | Each | |
106 | 106 | Replacement of brass fittings in HV side (1*3) | 1 | Each | |
107 | 107 | Replacement of tape changer | 1 | No. | |
108 | 108 | Transportation from site to Contractor Workshop. (including loading/unloading, before and after repairing for each unit of Hospitals in Moradabad Division) | 1 | Per Job | |
109 | 109 | (G).Maintinace work of Transformer 33 KV/400KVA.\nG1.New copper coil. | 1 | Per Kg | |
110 | 110 | Retrun of old copper coil. | 1 | Per Kg | |
111 | 111 | Oil Dehydration work of Transformer | 1 | Per job | |
112 | 112 | Supply of Transformer oil | 1 | Per Lt | |
113 | 113 | Replacement of LT Bushing (1*4) | 1 | Each | |
114 | 114 | Replacement of HT Bushing (1*3) | 1 | Each | |
115 | 115 | Complete repair of Transformer Tank | 1 | Per job | |
116 | 116 | Miner repair of Transformer Tank at site | 1 | Per job | |
117 | 117 | Major repair of Transformer Tank at workshop | 1 | Per job | |
118 | 118 | Supply of New Tank | 1 | Per Kg | |
119 | 119 | Supply of silica gel 250 gm with box | 1 | No. | |
120 | 120 | Supply of silica gel 500 gm with box | 1 | No. | |
121 | 121 | Supply of silica gel 1000 gm with box | 1 | No. | |
122 | 122 | Replacement work for one radiator | 1 | No. | |
123 | 123 | Replacement of brass fittings in LV side (1*4) | 1 | Each | |
124 | 124 | Replacement of brass fittings in HV side (1*3) | 1 | Each | |
125 | 125 | Replacement of tape changer | 1 | No. | |
126 | 126 | Transportation from site to Contractor Workshop. (including loading/unloading, before and after repairing for each unit of Hospitals in Moradabad Division) | 1 | Per Job | |
127 | 127 | (H).Maintinace work of Transformer 33 KV/630KVA.\nh.1 New copper coil. | 1 | Per Kg | |
128 | 128 | Retrun of old copper coil. | 1 | Per Kg | |
129 | 129 | Oil Dehydration work of Transformer | 1 | Per job | |
130 | 130 | Supply of Transformer oil | 1 | Per Lt | |
131 | 131 | Replacement of LT Bushing (1*4) | 1 | Each | |
132 | 132 | Replacement of HT Bushing (1*3) | 1 | Each | |
133 | 133 | Complete repair of Transformer Tank | 1 | Per job | |
134 | 134 | Miner repair of Transformer Tank at site | 1 | Per job | |
135 | 135 | Major repair of Transformer Tank at workshop | 1 | Per job | |
136 | 136 | Supply of New Tank | 1 | Per Kg | |
137 | 137 | Supply of silica gel 250 gm with box | 1 | No. | |
138 | 138 | Supply of silica gel 500 gm with box | 1 | No. | |
139 | 139 | Supply of silica gel 1000 gm with box | 1 | No. | |
140 | 140 | Replacement work for one radiator | 1 | No. | |
141 | 141 | Replacement of brass fittings in LV side (1*4) | 1 | Each | |
142 | 142 | Replacement of brass fittings in HV side (1*3) | 1 | Each | |
143 | 143 | Replacement of tape changer | 1 | No. | |
144 | 144 | Transportation from site to Contractor Workshop. (including loading/unloading, before and after repairing for each unit of Hospitals in Moradabad Division) | 1 | Per Job | |
145 | 145 | (1).Supply of New Transformer\n1.a Supply of New Transformer 100 KVA/11 KV AS PER I.S-1180 PART 11, 2014 WITH ALL STANDERD ACCESSORIES | 1 | Each | |
146 | 146 | Installation of New Transformer including loading, unloading separate earthing of Nutrel and body (03 No.) and HT/LT side Connection extra etc. | 1 | Job | |
147 | 147 | Supply of New Transformer 250 KVA/11 KV AS PER I.S-1180 PART 11, 2014 WITH ALL STANDERD ACCESSORIES | 1 | Each | |
148 | 148 | Installation of New Transformer including loading, unloading separate earthing of Nutrel and body (03 No.) and HT/LT side Connection extra etc. | 1 | Job | |
149 | 149 | Supply of New Transformer 315 KVA/11 KV AS PER I.S-1180 PART 11, 2014 WITH ALL STANDERD ACCESSORIES | 1 | Each | |
150 | 150 | Installation of New Transformer including loading, unloading separate earthing of Nutrel and body (03 No.) and HT/LT side Connection extra etc. | 1 | Job | |
151 | 151 | Supply of New Transformer 400 KVA/11 KV AS PER I.S-1180 PART 11, 2014 WITH ALL STANDERD ACCESSORIES | 1 | Each | |
152 | 152 | Installation of New Transformer including loading, unloading separate earthing of Nutrel and body (03 No.) and HT/LT side Connection extra etc. | 1 | Job | |
153 | 153 | Supply of New Transformer 630 KVA/11 KV AS PER I.S-1180 PART 11, 2014 WITH ALL STANDERD ACCESSORIES | 1 | Each | |
154 | 154 | Installation of New Transformer including loading, unloading separate earthing of Nutrel and body (03 No.) and HT/LT side Connection extra etc. | 1 | Job | |
155 | 155 | Supply of New Transformer 250 KVA/33 KV AS PER I.S-1180 PART 11, 2014 WITH ALL STANDERD ACCESSORIES | 1 | Each | |
156 | 156 | Installation of New Transformer including loading, unloading separate earthing of Nutrel and body (03 No.) and HT/LT side Connection extra etc. | 1 | Job | |
157 | 157 | Supply of New Transformer 400 KVA/33 KV AS PER I.S-1180 PART 11, 2014 WITH ALL STANDERD ACCESSORIES | 1 | Each | |
158 | 158 | Installation of New Transformer including loading, unloading separate earthing of Nutrel and body (03 No.) and HT/LT side Connection extra etc. | 1 | Job | |
159 | 159 | Supply of New Transformer 630 KVA/33 KV AS PER I.S-1180 PART 11, 2014 WITH ALL STANDERD ACCESSORIES | 1 | Each | |
160 | 160 | Installation of New Transformer including loading, unloading separate earthing of Nutrel and body (03 No.) and HT/LT side Connection extra etc. | 1 | Job |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail