Eastern Coal Fields Ltd-ECL has published Tender For Planning , Design , Engineering , Construction , Fabrication , Supply , Erection , Installation , Trial Run , Testing And Commissioning Of Additional Coal Handling Plant For Rajmahal Ocp Including Operation And Maintenance For 5 Years. Submission Date for this Tender is 17-08-2020. Coal Handling Plant Tenders in RAJMAHAL AREA ECL. Jharkhand. Bidders can get complete Tender details and download the document.
Name of the Work / NIT No: | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1 | WORKS & SERVICES | BI01010001010000000000000515BI0100001112 | ||
2 | 2 | Detailed survey of the area, within the battery limits & submission of reports | BI01010001010000000000000515BI0100001113 | 1 | Complete work as per tender document |
3 | 3 | Sub soil exploration, field and laboratory testing of samples & submission of reports | BI01010001010000000000000515BI0100001114 | 1 | Complete work as per tender document |
4 | 4 | Design Engineering Cost | |||
5 | 5 | a)Preparation and submission of system engineering drawings as per system requirements | 1 | As per System Requirement | |
6 | 6 | b)GA & detail engineering designs and drawings of all civil and structurals included in the system and scope of works | 1 | Complete details of the system | |
7 | 7 | c)G.A. & detailed engineering designs and drawings including working and maintenance manuals of : \ni) all individual equipment ( Mechanical & Electricals)\n ii) Dust Control & Pressurisation system. \n iii) Fire-fighting and plant cleaning system. iv) Chutes & Liners \nv) Communication system \nvi) Power Supply System \n vii)Illumination system. \n viii) OHE system \n ix) Plant control system \nix) Any other system/unit to match the scope of work & requirement\n\n\n | BI01010001010000000000000515BI0100001115 | 1 | Complete details of the system |
8 | 8 | Documentation as per tender specification | BI01010001010000000000000515BI0100001116 | 1 | Complete as per scope of work |
9 | 9 | Civil & Structural Work (Loading complex, Storage complex, Coal receiving complex ,Conveyor Gallery, Drive & Transfer Houses, Sampler House, etc.) | BI01010001010000000000000515BI0100001117 | ||
10 | 10 | Truck Receiving Hoppers | 1 | Complete as per scope of work | |
11 | 11 | Truck Receiving Platform with Ramp | 1 | Complete as per scope of work | |
12 | 12 | Retaining Walls | 1 | Complete work as per tender document | |
13 | 13 | Conveyor Gantry with trestle with supporting arrangement | 1 | Complete work as per tender document | |
14 | 14 | Transfer House & Drive Houses | 1 | Complete work as per tender document | |
15 | 15 | 15000 Te Over Ground Bunker | 1 | Complete work as per tender document | |
16 | 16 | 4000 Te Silo with Lift Well | 1 | Complete work as per tender document | |
17 | 17 | Development work, Infrastructure & Miscellaneous Items | |||
18 | 18 | Service building such as main CHP office, rest room, First aid center, canteen etc | 1 | Complete work as per tender document | |
19 | 19 | Substation | 1 | Complete work as per tender document | |
20 | 20 | Pump House | 1 | Complete work as per tender document | |
21 | 21 | Parking Sheds | 1 | Complete work as per tender document | |
22 | 22 | Internal Approach roads | 1 | Complete work as per tender document | |
23 | 23 | Drains & Culverts | 1 | Complete work as per tender document | |
24 | 24 | Underground sump & Water supply line | 1 | Complete work as per tender document | |
25 | 25 | Sewerage | 1 | Complete work as per tender document | |
26 | 26 | ETP | 1 | Complete work as per tender document | |
27 | 27 | Lighting Mast | 1 | Complete work as per tender document | |
28 | 28 | Boundary Wall with gates | BI01010001010000000000000515BI0100001119 | 1 | Complete work as per tender document |
29 | 29 | Site Development & Arboriculture | 1 | Complete work as per tender document | |
30 | 30 | Miscellaneous Items | 1 | Complete work as per tender document | |
31 | 31 | SUPPLY : MECHANICAL | |||
32 | 32 | CONVEYORS | 1 | As per System Requirement | |
33 | 33 | BELTING | 1 | As per System Requirement | |
34 | 34 | EQUIPMENT | |||
35 | 35 | Receiving Section Mechanical Equipment | 1 | As per System Requirement | |
36 | 36 | Mechanical Equipment in Storage Section | 1 | As per System Requirement | |
37 | 37 | Mechanical Equipment at Loading Section | 1 | As per System Requirement | |
38 | 38 | Mechanical Equipment at Transfer houses | 1 | As per System Requirement | |
39 | 39 | OHE equipment including mechanical, civil and electrical requirements | 1 | As per System Requirement | |
40 | 40 | Other mechanical equipment | 1 | As per System Requirement | |
41 | 41 | Dust suppression system with piping & other accessories, Safety & firefighting system , Condition monitoring system and other misc. equipment/utility for any more item required to complete the project | 1 | As per System Requirement | |
42 | 42 | SUPPLY : ELECTRICAL | |||
43 | 43 | Electrical equipment and accessories required for SuB Substations | 1 | As per System Requirement | |
44 | 44 | Electrical equipment and accessories required for Power Control Centre at RLS | 1 | As per System Requirement | |
45 | 45 | Power Cables, Control & Signalling Cables, Lighting Cables & wires, Communication Cables | 1 | As per System Requirement | |
46 | 46 | Plant Equipment Earthing, Structures Earthing, Earthing for Lightning Protection, Tranfromer neutral Earthing | 1 | As per System Requirement | |
47 | 47 | Welding system | 1 | As per System Requirement | |
48 | 48 | PLC System for Control & Automation,Interlocks, Signalling and instrumentation of entire CHP. | 1 | As per System Requirement | |
49 | 49 | Illumination System and Luminaires, Lighting poles & Towers, Lighting DBs etc. | 1 | As per System Requirement | |
50 | 50 | Computers and Peripherals | 1 | As per System Requirement | |
51 | 51 | Miscellaneous: CCTV, Communication system, DG Sets, Insulating Mats, Exhaust Fans etc. | 1 | As per System Requirement | |
52 | 52 | ERECTION,INSTALLATION & COMMISSIONING | |||
53 | 53 | Erection of mechanical equipment | 1 | As per System Requirement | |
54 | 54 | Erection of electrical equipment | 1 | As per System Requirement | |
55 | 55 | Erection of other plant and machinery etc. | 1 | As per System Requirement | |
56 | 56 | Trial run, and commissioning of the plant | 1 | As per System Requirement | |
57 | 57 | OTHER ITEMS | |||
58 | 58 | Drinking water system consisting of tanks, pipes, valves, taps etc. | 1 | As per System Requirement | |
59 | 59 | Plant cleaning system | 1 | As per System Requirement | |
60 | 60 | Any other item left out for completion of the project | 1 | As per System Requirement | |
61 | 61 | OPERATION AND MAINTENANCE FOR FIVE YEARS AND TRAINING | |||
62 | 62 | Operation of the plant for five year as described in tender document | 1 | As per System Requirement | |
63 | 63 | Maintenance of the plant for five year under defect liability period including repai, replacement of parts, component, equipments/system etc. described in tender document | 1 | As per System Requirement | |
64 | 64 | Training of the employer personnel as per tender document | 1 | As per System Requirement | |
65 | 65 | Total impact of GST for the purpose of CTC | 1 | Nos |