Erection , Dismantling Transportation Of Poles , Distribution Transformers , Ht/Lt Lines And Other Allied Extension Works In Burgur Section ( Hill Area ) Of Anthiyur Sub Division .
Tender Value
25 Lakhs
Estimated cost
Bid Submission
18 Jul 2020
0 days left
EMD
25000
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
GOBICHETTIPALAYAM → Tamil Nadu
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Erection , Dismantling Transportation Of Poles , Distribution Transformers , Ht/Lt Lines And Other Allied Extension Works In Burgur Section ( Hill Area ) Of Anthiyur Sub Division .
BOQ
| E-tender for Erection, dismantling, transportation of poles, distribution Transformers, HT/LT lines and other allied extension works in Burgur Section (Hill area) | |||||
|---|---|---|---|---|---|
| Sl.No. | Item Description | Item Code / Make | Quantity | Units | |
| 1 | 1 | Excavation of pole pit upto 27\" (8.0 m) Pole by using JCB or manual | item 1 | 170 | Each pit |
| 2 | 2 | Dismantling of pole pit upto 27\" (8.0 m) Pole by using JCB or manual | item 2 | 65 | Each pit |
| 3 | 3 | Excavation of stay pit 4.5' to 5' depth by using JCB or manual | item 3 | 60 | Each pit |
| 4 | 4 | Excavation of pole pit upto 9.14 mtr Pole by using JCB or manual | item 4 | 60 | Each pit |
| 5 | 5 | Excavation of RSJ pole pit above 36' by using JCB or manual | item 5 | 10 | Each pit |
| 6 | 6 | Excavation of pole/stay pit hard rock requires blasting | item 6 | 30 | Each pit |
| 7 | 7 | Excavation of poles /stay pit hard rock without blasting (where houses are located) | item 7 | 20 | Each pit |
| 8 | 8 | Erection of RCC poles/Metal poles upto 8.00m. (27') by using JCB or manual | item 8 | 170 | Each pole |
| 9 | 9 | Erection of RCC poles/Metal poles upto 9.14m.(30') by using JCB or maual | item 9 | 60 | Each pole |
| 10 | 10 | Erection of RSJ joists, fabricated poles above 30'-0\" (9.14 m) by using JCB or manual. | item 10 | 10 | Each pole |
| 11 | 11 | Dismantling of RSJ joists, fabricated poles above 30'-0\" (9.14 m) by using JCB or manual. | item 11 | 20 | Each pole |
| 12 | 12 | Erection of RSJ joists, fabricated poles above 36'-0' by using JCB or maual | item 12 | 15 | Each pole |
| 13 | 13 | Dismantling of RSJ joists, fabricated poles above 36'-0' by using JCB or maual | item 13 | 5 | Each pole |
| 14 | 14 | Erection of stay set complete | item 14 | 110 | Each Stay |
| 15 | 15 | Dismantling of all size of conductor | item 15 | 200 | Per/span/wire |
| 16 | 16 | Fixing of HT \"V\" cross arms(all types) / channel cross arms/guarding Cross arms | item 16 | 55 | Each |
| 17 | 17 | Dismantling of HT \"V\" cross arms(all types) / channel cross arms/guarding Cross arms | item 17 | 55 | Each |
| 18 | 18 | Fixing of LT 3 phase cross arms | item 18 | 140 | Each |
| 19 | 19 | Dismantling of LT 3 phase cross arms | item 19 | 70 | Each |
| 20 | 20 | Fixing of LT Single phase cross arms | item 20 | 120 | Each |
| 21 | 21 | Dismantling of LT Single phase cross arms | item 21 | 70 | Each |
| 22 | 22 | Fixing of HT/LT TI Fittings | item 22 | 35 | Each |
| 23 | 23 | Dismantling of HT/LT TI Fittings | item 23 | 30 | Each |
| 24 | 24 | Fixing of HT pin Insulators 22 KV | item 24 | 350 | Each |
| 25 | 25 | Dismantling of HT pin Insulators 22 KV | item 25 | 80 | Each |
| 26 | 26 | Fixing of HT 22 KV strain disc. | item 26 | 150 | Each |
| 27 | 27 | Dismantling of HT 22 KV strain disc. | item 27 | 51 | Each |
| 28 | 28 | Fixing of LT pin Insulator | item 28 | 450 | Each |
| 29 | 29 | Dismantling of LT pin Insulator | item 29 | 143 | Each |
| 30 | 30 | Fixing of LT shackle | item 30 | 200 | Each |
| 31 | 31 | Dismantling of LT shackle | item 31 | 50 | Each |
| 32 | 32 | Fixing of Aluminium Knob | item 32 | 250 | Each |
| 33 | 33 | Dismantling of Aluminium Knob | item 33 | 40 | Each |
| 34 | 34 | Earthing of pole with pin including burying looping and binding. | item 34 | 70 | Per |
| 35 | 35 | Paving of conductor,stringing etc.. Complete with 7/4.09 mm, 7/3.35 mm,7/2.59 mm ACSR conductor. | item 35 | 1000 | Per/span/wire |
| 36 | 36 | Sleeve concreting including materials (Cement 1/2 bag + river sand and Blue metals and watering). | item 36 | 30 | Per pole |
| 37 | 37 | Erection of Transformer structure complete in all respects with wiring Earthing, fixing of open type fuse units, HT/LT/LAS and jumpering 3 Nos. Earth pits with tubs including painting of metal parts, structure poles, fixing of top channel seating channel, belting angle (Except erection of Transformer) | item 37 | 20 | Per |
| 38 | 38 | Guarding arrangements for LT Split neutral guarding | item 38 | 70 | per span |
| 39 | 39 | Guarding arrangements for HT Guarding | item 39 | 25 | per span |
| 40 | 40 | Transporting of Disrtibution transformers/Metering sets by using private vehicle other than bullock cart up to 30Km | item 40 | 10 | No |
| 41 | 41 | Transporting of Disrtibution transformers/Metering sets by using private vehicle other than bullock cart above 30Km | item 41 | 500 | No |
| 42 | 42 | Transport of poles/Materials/ conductors and other materials (excluding loading and unloading charges.)below 8 Kms | item 42 | 250 | Per Tonne |
| 43 | 43 | Transport of poles/Materials/ conductors and other materials (excluding loading and unloading charges.)above 8 KM for additional KM. | item 43 | 750 | Per Km |
| 44 | 44 | Loading of poles upto 27'-0\" | item 44 | 190 | per pole |
| 45 | 45 | Loading of poles upto 30'-0\"/RSJ Pole | item 45 | 20 | per pole |
| 46 | 46 | Un loading of poles upto 27'-0\" | item 46 | 190 | per pole |
| 47 | 47 | Loading of cement bag of 50Kg | item 47 | 20 | Per bag |
| 48 | 48 | Transporting of poles from road site to pole pit including loading and unloading of poles by using JCB or manual up to 100 m | item 48 | 170 | Per Pole |
| 49 | 49 | Transporting of poles from road site to pole pit including loading and unloading of poles by using JCB or manual beyond 100 m | item 49 | 50 | Per Pole |
| 50 | 50 | Loading or unloading of Transformer upto 200 KVA for each | item 50 | 15 | Each |
| 51 | 51 | Erection of New Transformer upto 200 KVA | item 51 | 10 | Each |
| 52 | 52 | Conversion of pin point to cut point Re-Sagging (HT) 7/4.09mm | item 52 | 10 | Per/span/wire |
| 53 | 53 | Erection of street light including fixure fitting | item 53 | 63 | Each |
| 54 | 54 | Erection of street light service | item 54 | 63 | Each |
| 55 | 55 | Releasing of grills from RCC Poles | item 55 | 30 | Per Pole |
| 56 | 56 | Releasing of single phase service and re-fixing. | item 56 | 100 | Per service |
| 57 | 57 | Releasing of 3 phase service and (upto 50 HP) re-fixing. | item 57 | 100 | Per service |
| 58 | 58 | Erection of D.P. structure with AB switch top channel, cross brancing, HG fuse set, earthing painting earthing painting, providing stay and pole concreting | item 58 | 4 | Per Str. |
| 59 | 59 | Labour charges for alteration of Back clamp to suit for the works. | item 59 | 10 | Each |
| 60 | 60 | Labour charges for alteration of stay clamp to suit for the works. | item 60 | 10 | Each |
| 61 | 61 | Re-stringing of HT/LT line for all span sizes of conductor | item 61 | 10 | Per/ span/ wire |
| 62 | 62 | Providing LT bus bar arrangement in distn. Trs. Structure location | item 62 | 10 | Per str |
| 63 | 63 | Provision of Distribution Transformer Name Board (Name of the 22/11KV #, Name of the SS, Capacitor, Danger Board. | item 63 | 20 | Per DT |
| 64 | 64 | Releasing of ACSR/AAAC conductors from conductor drum and coiling ACSR 7/3.35, 7/2.59, AAAC 7/2.50, 7/3.15 MM (Per/Km.) | item 64 | 25 | KM |
| 65 | 65 | Drilling of hole in channel only 3/4\" & 1\" per hole | item 65 | 10 | Per hole |
| 66 | 66 | T.I.Fitting welding with clamps | item 66 | 20 | Each |
| 67 | 67 | Feeding arrangements with open type fuse unit | item 67 | 5 | Set |
| 68 | 68 | Cutting of coconut leaves (per tree) | item 68 | 200 | Per tree |
| 69 | 69 | Clearing of branches of trees | item 69 | 180 | Tree |
AI Tender Summary
Tender Timeline
Jul 04, 2020
11:30 IST
Tender Published
Tender notice published.
CompletedJul 18, 2020
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
CompletedJul 20, 2020
Bid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender