| 1 | Development of Yadadri Dense Forest Model of Plantation (Espacement 0.75m X 0.75m) at Govt. ITI Coll | As directed by the department | 351.00 | each | 8.60 | 3018.60 |
| Cost of supporting stakes of 2.0m long, sturdy and straight and minimum10cm girth at the base. |
| 2 | Development of Yadadri Dense Forest Model of Plantation (Espacement 0.75m X 0.75m) at Govt. ITI Coll | As directed by the department | 351.00 | 100 no.s | 140.60 | 493.51 |
| Planting in 0.30 Cum pit |
| 3 | Development of Yadadri Dense Forest Model of Plantation (Espacement 0.75m X 0.75m) at Govt. ITI Coll | As directed by the department | 36.00 | 100 no.s | 91.82 | 33.06 |
| (b) 15 X 30 cm (6\"X12\") bag plants |
| 4 | Development of Yadadri Dense Forest Model of Plantation (Espacement 0.75m X 0.75m) at Govt. ITI Coll | As directed by the department | 315.00 | 100 no.s | 59.38 | 187.05 |
| Internal transportation to planting stock on head loads (a) 12.5 X 22.5 cm (5X9\") bag plants\" |
| 5 | Development of Yadadri Dense Forest Model of Plantation (Espacement 0.75m X 0.75m) at Govt. ITI Coll | As directed by the department | 36.00 | 100 no.s | 153.69 | 55.33 |
| (b) 15 X 30 cm (6\"X12\") bag plants |
| 6 | Development of Yadadri Dense Forest Model of Plantation (Espacement 0.75m X 0.75m) at Govt. ITI Coll | As directed by the department | 315.00 | 100 no.s | 72.21 | 227.46 |
| (a) Transportation of Planting Stock (including loading and unloading) up to a distance of 5 km ( Total 25km) (a) 12.5 X 22.5 cm (5X9\") bag plants\" |
| 7 | Development of Yadadri Dense Forest Model of Plantation (Espacement 0.75m X 0.75m) at Govt. ITI Coll | As directed by the department | 351.00 | pit | 2.36 | 828.36 |
| Digging of 0.30 Cum Pits in Ploughed Areas in July-August by adopting 50% of original rate of digging of pits of ordinary soil |
| 8 | Development of Yadadri Dense Forest Model of Plantation (Espacement 0.75m X 0.75m) at Govt. ITI Coll | As directed by the department | 2802.75 | Litre | 0.19 | 532.52 |
| Watering on the top soil for 20 days (2 tankers every third day on non rainy days) |
| 9 | Development of Yadadri Dense Forest Model of Plantation (Espacement 0.75m X 0.75m) at Govt. ITI Coll | As directed by the department | 24.30 | Cum | 500.00 | 12150.00 |
| Cost & Spreading over the Top of the Red Soil as mulching material |
| 10 | Development of Yadadri Dense Forest Model of Plantation (Espacement 0.75m X 0.75m) at Govt. ITI Coll | As directed by the department | 3.20 | Cuft | 68.15 | 218.15 |
| Application of Varmi Compost including cost and conveyance, |
| 11 | Development of Yadadri Dense Forest Model of Plantation (Espacement 0.75m X 0.75m) at Govt. ITI Coll | As directed by the department | 6.00 | kg | 10.00 | 60.00 |
| Cost of DAP @ 25grams planting point |
| 12 | Development of Yadadri Dense Forest Model of Plantation (Espacement 0.75m X 0.75m) at Govt. ITI Coll | As directed by the department | 10.00 | cft | 39.68 | 396.80 |
| Cost and conveyance of well-decomposed Farmyard manure (FYM) to planting site. |
| 13 | Development of Yadadri Dense Forest Model of Plantation (Espacement 0.75m X 0.75m) at Govt. ITI Coll | As directed by the department | 1201.17 | Litre | 0.19 | 228.22 |
| Watering over the first layer i.e.,Grass/ Leaves/ one layer of soil / Fertilizer (2 tankers/ day for 3 days) |
| 14 | Development of Yadadri Dense Forest Model of Plantation (Espacement 0.75m X 0.75m) at Govt. ITI Coll | As directed by the department | 24.30 | Cu.m | 22.24 | 540.43 |
| Spreading the Soil over the lawn grass/grass/leaves upto 15cm thickness with JCB. |
| 15 | Development of Yadadri Dense Forest Model of Plantation (Espacement 0.75m X 0.75m) at Govt. ITI Coll | As directed by the department | 16.20 | Cu.m | 803.04 | 13009.25 |
| Cutting, collection, loading and transportion of lawn grass/grass and spreading of lawn grass lead of 15 Km. distance. |
| 16 | Development of Yadadri Dense Forest Model of Plantation (Espacement 0.75m X 0.75m) at Govt. ITI Coll | As directed by the department | 162.00 | 1 Hectare | 3802.30 | 61.60 |
| Ploughing the site with cultivator. (Rate of two times of inter ploughing using tractors with cultivator - Rs,1901.15/Ha) criss-cross ploughing |
| 17 | Development of Yadadri Dense Forest Model of Plantation (Espacement 0.75m X 0.75m) at Govt. ITI Coll | As directed by the department | 81.00 | Cu.m | 106.83 | 8653.23 |
| Digging of Soil upto depth of 50 Cm and keeping soil on all four sides of plot with JCB (Earthwork Excavation Mechanical) |