| 1 | 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and\ndisposal of surplus excavated soil as directed, within a lead of 50 m. The contractor has to detect different utilities like sewer line, water supply line, electric cable, telephone cable, gas pipe line etc. using utility detecting machine before start of excavation and shall start excavation only after getting permission of Engineer-in-Charge. | BI01010001010000000000000515BI0100001112 | 300 | Cum. |
|---|
| 2 | 2 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 10.0 in foundation and plinth in: Cement mortar 1:4 (1 cement : 4 coarse sand) | | 10 | Cum |
|---|
| 3 | 3 | 12 mm cement plaster of mix : 1:4 (1 cement: 4 coarse sand) | | 600 | Sqm. |
|---|
| 4 | 4 | Neat cement punning. | | 600 | Sqm. |
|---|
| 5 | 5 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and\nreinforcement - All work up to plinth level. 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources). | | 94 | cum |
|---|
| 6 | 6 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Cold twisted bars | | 11070 | Kg. |
|---|
| 7 | 7 | Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required . In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works\n | | 6480 | kg |
|---|
| 8 | 8 | Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved. | | 300 | cum. |
|---|
| 9 | 9 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand (Zone-III) : derived from natural sources: 4 graded sone aggregate 20 mm nominal size derived from natural sources). | | 23.2 | Cum. |
|---|
| 10 | 10 | Centering and shuttering including strutting, propping etc. and removal of form for : Suspended floors, roofs, landings, balconies and access platform | | 130 | Sqm. |
|---|
| 11 | 11 | S/o Hydraulic Excavator (3D) with driver and fuel. \n | 5.4 | 10 | days |
|---|
| 12 | 12 | S/o Beldar / Helpers on hire charges basis \n | | 100 | Nos. |
|---|
| 13 | 13 | S/o Tractor Trolly with driver on hire charges basis | | 20 | days |
|---|