| 1 | 1 | Excavation for foundation/pipe trenches in earth, soils of all types, sand, gravel and soft murum, including removing the excavated material upto a distance of 50 metres and lifts as below, stacking and spreading as directed, normal dewatering preparing the bed for foundation and excluding back filling etc complete | | 0.01 | No |
|---|
| 2 | 2 | Lift 0 to 1.5 M | | 75 | m3 |
|---|
| 3 | 3 | Excavation for foundation/pipe trenches in hard murum and boulders, W.B.M. road including removing the excavated material upto a distance of 50 M beyojnd the area and lifts as below, stacking and spreading as directed by Engineer-in-charge, normal dewatering, preparing the bed for foundation and excluding backfilling, etc complete. | | 0.01 | No |
|---|
| 4 | 4 | Lift 0 to 1.5 M | | 50 | m3 |
|---|
| 5 | 5 | Excavation for foundation/pipe trenches in soft rock and old cement and lime masonry foundation asphalt road by all means including removing the excavated material upto a distance of 50 M beyond the are and lifts as below, stacking as directed by Engineer-in-charge, normal dewatering, preparing the bed for foundation and excluding backfilling etc complete | | 0.01 | No |
|---|
| 6 | 6 | Lift 0 to 1.5 M | | 75 | m3 |
|---|
| 7 | 7 | Excavation for foundation/pipe trenches in hard rock and concrete road by chiselling,wedging, line drilling by mechanical means or by all means other than balsting including trimming and levelling the bed. Removing the excavated material upto a distance of 50 meter beyond the area and lifts as below, stacking as directed by Engineer-in-charge, normal dewatering, excluding backfilling, etc complete by all means. | | 0.01 | No |
|---|
| 8 | 8 | Lift 0 to 1.5 M | | 37.5 | m3 |
|---|
| 9 | 9 | Excavation for foundation/pipe trenches in Muddy / marshy / slushy including use of Poclain Removing the excavated material upto a distance of 50 meter beyond the area and lifts as below, stacking as directed by Engineer-in-charge, normal dewatering, excluding backfilling, etc complete by all means. | | 0.01 | No |
|---|
| 10 | 10 | Lift 0 to 1.5 M | | 300 | m3 |
|---|
| 11 | 11 | Lift 1.5 to 3.0 M | | 300 | m3 |
|---|
| 12 | 12 | Dewatering the excavated trenched and pools of water in the building trenches /pipeline trenches, well works by using pumps and other devices including disposing off water to safe distance as directed by Engineer-in-charge (including cost of machinery, labour, fuel), etc complete. | | 0.01 | No |
|---|
| 13 | 13 | (Bd-A-9/261) | | 5600 | Bhp/hr. |
|---|
| 14 | 14 | Providing supplying MS Specials with three coats of epoxy paint (Shalimar, Ciba) including all taxes, octri, inspection, transportation to site etc. comp MS barrels loccaly manufactured - 730,400,300,200,150 id | | 2600 | Kg |
|---|
| 15 | 15 | Providing supplying MS Specials with three coats of epoxy paint (Shalimar, Ciba) including all taxes, octri, inspection, transportation to site etc. comp Flanges with machining and driling holes. Etc. comp | | 500 | Kg |
|---|
| 16 | 16 | Providing supplying 700 mm dia CI coller including all taxes, octri, inspection, transportation to site etc. comp | | 1132 | Kg |
|---|
| 17 | 17 | Providing supplying CI Mechanical compresson collar coupling with rubber gasket of SBR Nut bolt with hydrualic testing including all taxes, octri, inspection, transportation to site etc. comp | | 0.01 | No |
|---|
| 18 | 18 | 700 mm dia | | 4 | no |
|---|
| 19 | 19 | 400 mm dia | | 2 | no |
|---|
| 20 | 20 | 300 mm dia | | 2 | no |
|---|
| 21 | 21 | Lowering, Laying MS pipe in trenches with loading, unloding, tack welding, transportation 500 meter etc. comp | | 0.01 | No |
|---|
| 22 | 22 | 700 mm dia | | 24 | Rmt |
|---|
| 23 | 23 | 400 mm dia | | 5 | Rmt |
|---|
| 24 | 24 | 300 mm dia | | 5 | Rmt |
|---|
| 25 | 25 | 200 mm dia | | 12 | Rmt |
|---|
| 26 | 26 | 150 mm dia | | 12 | Rmt |
|---|
| 27 | 27 | Providing, Making lead caulked joint with molten lead to CI pipe of all class with lead, all material, labour etc. comp 700 mm dia | | 12 | No |
|---|
| 28 | 28 | Gas cutting either square cut or V cut pipes, plates, etc comp. Above 5 mm up to 10 mm | | 47.12 | Mtr |
|---|
| 29 | 29 | Welding in all position with required number of runs, for MS pipes internally and / or externally including gauging wherever necessary --- etc comp. butt joint, thikness 10 mm | | 47.12 | Mtr |
|---|
| 30 | 30 | Removing existing sluice valve / Half body of Sluice valve etc. comp. (40% rate of fixing, MJP mech DSR 2013-14 sect. BLB Dy- 88 ) | | 0.01 | No |
|---|
| 31 | 31 | 700 mm dia S/V | | 4 | No |
|---|
| 32 | 32 | 400 mm dia | | 4 | No |
|---|
| 33 | 33 | 300 mm dia | | 4 | No |
|---|
| 34 | 34 | 200 mm dia | | 8 | No |
|---|
| 35 | 35 | 150 mm dia | | 8 | No |
|---|
| 36 | 36 | Lowering ,laying and jointing in position following C.I. D/F Reflux valves, Butterfly valves and Sluice valves including cost of all labour, jointing material, including nut bolts and giving satisfactory hydraulic testing,etc. complete | | 0.01 | No |
|---|
| 37 | 37 | 400 mm dia sluice valve | | 4 | No |
|---|
| 38 | 38 | 300 mm dia sluice valve | | 4 | No |
|---|
| 39 | 39 | 200 mm dia sluice valve | | 10 | No |
|---|
| 40 | 40 | 150 mm dia sluice valve | | 8 | No |
|---|
| 41 | 41 | Providing and supplying ebonite coated air valve ball including all taxes, transportation to departmental store etc. comp | | 0.01 | No |
|---|
| 42 | 42 | 150 mm dia | | 8 | No |
|---|
| 43 | 43 | 200 mm dia | | 8 | No |
|---|
| 44 | 44 | 80 mm dia | | 4 | No |
|---|
| 45 | 45 | (As per sanctioned rate) | | 0.01 | No |
|---|
| 46 | 46 | Providing and supplying following material including all taxes, transportation to departmental store etc. comp | | 0.01 | No |
|---|
| 47 | 47 | Nut bolt of required size | | 40 | Kg |
|---|
| 48 | 48 | Lead Wool | | 80 | Kg |
|---|
| 49 | 49 | Cake lead | | 80 | Kg |
|---|
| 50 | 50 | M- seal | | 30 | Kg |
|---|
| 51 | 51 | Spun yarn | | 100 | Kg |
|---|
| 52 | 52 | Rubber packing 8 mm thick | | 70 | Kg |
|---|
| 53 | 53 | Cement | | 150 | Kg |
|---|
| 54 | 54 | Long size S.S. Nutbolts for expansion joint | | 60 | Kg |
|---|
| 55 | 55 | MS plates | | 30 | Kg |
|---|
| 56 | 56 | MS angles | | 30 | Kg |
|---|
| 57 | 57 | MS flats | | 20 | Kg |
|---|
| 58 | 58 | Binding wire | | 15 | no |
|---|
| 59 | 59 | G.I. Mesh | | 500 | Sqm |
|---|
| 60 | 60 | Gland rope | | 60 | Kg |
|---|
| 61 | 61 | Grease | | 50 | Kg |
|---|
| 62 | 62 | (As per sanctioned market rate) & MJP/DSR/2019-20/Material Supply) | | 0.01 | No |
|---|
| 63 | 63 | Providing Supplying on Hire Charges | | 0.01 | No |
|---|
| 64 | 64 | JCB | | 20 | Hr |
|---|
| 65 | 65 | Hydra/ Crane | | 12 | Hr |
|---|
| 66 | 66 | Providing Supplying of Male Mazdoor | | 40 | No |
|---|
| 67 | 67 | MJP/DSR/2019-20/Sect B Page no. 13 | | 0.01 | No |
|---|
| 68 | 68 | Providing and supplying following material including all taxes, transportation to departmental store etc. comp | | 0.01 | No |
|---|
| 69 | 69 | S.S. Spindle | | 60 | Day |
|---|
| 70 | 70 | S.S. Check Nut | | 24 | Day |
|---|
| 71 | 71 | Providing and applying epoxy paint of shalimar, Ciba to any structure with cleaning, scrapping, air blowing etc.comp for old surface | | 113.98 | Sqm |
|---|
| 72 | 72 | Providing and laying cement concrate for foundation, block with dewatering from work compaction curing finishing etc. comp | | 39.23 | Cum |
|---|
| 73 | 73 | Refilling the trenches with available excavated stuff with soft material first over pipeline and then hard material in 15 cm layers with all leads and lifts including consolidation, surcharging, etc complete | | 837.5 | Cum |
|---|
| 74 | 74 | Providing and laying contractors Murum in 15-20 Cm layars with watering, compaction etc. comp | | 18.75 | Cum |
|---|
| 75 | 75 | Providing and laying rubble stone soling in 15-20 Cm layars with packing, compaction etc. comp | | 18.75 | Cum |
|---|
| 76 | 76 | Dismantling dead pipe line of M,S/RCC/C. 1/P.SC.and G,I/AC/PVC/SW/HDPE / pipe including excavation, Reffiling, breaking joint, pipe lifting stacking etc comp. 700 mm CI pipe | | 24 | Rmt |
|---|