Assam Gas Company Limited has published Procurement Of Solar Power Supply System. Submission Date for this Tender is 29-08-2020. Electrical Maintenance Tenders in Golaghat Assam. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 07-Jul-2020 | CORRIGENDUM 1 | Other | 25-07-2020 |
2 | 23-Jul-2020 | Price Bid Opening Date Amended | Date | 08-08-2020 |
3 | 06-Aug-2020 | Clause Addition and Modification | Other | 19-08-2020 |
4 | 13-Aug-2020 | Pre Bid Querries Reply | Other | 19-08-2020 |
5 | 13-Aug-2020 | Amendment/ Addition/ Modification/ Deletion of clause | Other | 19-08-2020 |
6 | 18-Aug-2020 | CORRIGENDUM 6 | Date | 29-08-2020 |
Name of Work: Nambor-Golaghat-Numaligarh Area Gas Pipeline Project | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1 | SUPPLY INSTALLATION TESTING & COMMISSIONING OF SOLAR POWERSYSTEM WITH BATTERY BACK-UP | |||
2 | 1.01 | Solar Panel System for Golaghat Terminal\nlSolar power supply system -5 KVA, 415 V, AC, 3 Ph, N, (Solar Panels have redundancy Parallel redundant 2 nos X 100 % rating & Charge controller have 2 nos X 200% ratings) along with additional Battery charger & nickel cadmium battery bank with battery rack (suitable for solar charging, as per specification and datasheet). battery bank suitable for sufficient backup time at full load shall be provided for meeting critical loads that cannot withstand even a momentary interruption in voltage. Battery Banks -(2Nos. x 50% Ni-Cd Battery bank - 10 hours battery backup for 4 kW continious load & 15 Minute back-up for 4 kw intermittent load ):Delivery of complete Solar power system shall be at Golaghat terminal ,AGCL. Refer SLD -1009-GG-EL- SLD -4001 _0.solar Power system shall be complete in all respect.& system's functional responsibility shall be in vendors scope.Construction of battery room (building ) including complete civil work and electrical work as per Dwg-1009-CS -ARC-6003 REV -C1.shall be in contractor's scope. | item1 | 1 | SET |
3 | 1.02 | Solar Panel System for Uriumghat Terminal\nSolar power supply system -5 KVA, 415 V, AC, 3 Ph, N, (Solar Panels have redundancy Parallel redundant 2 nos X 100 % rating & Charge controller have 2 nos X 200% ratings) along with additional Battery charger & nickel cadmium battery bank with battery rack (suitable for solar charging, as per specification and datasheet). battery bank suitable for sufficient backup time at full load shall be provided for meeting critical loads that cannot withstand even a momentary interruption in voltage. Battery Banks -(2Nos. x 50% Ni-Cd Battery bank - 10 hours battery backup for 4 kW continious load & 15 Minute back-up for 4 kw intermittent load ):Delivery of complete Solar power system shall be at Urimghat terminal ,AGCL. Refer SLD -1009-UR-EL- SLD -4001 _0.solar Power system shall be complete in all respect.& system's functional responsibility shall be in vendors scope.Construction of battery room (building ) including complete civil work and electrical work as per Dwg-1009-CS -ARC-6003 REV -C1.shall be in contractor's scope | item2 | 1 | SET |
4 | 1.03 | Solar Panel System for Numaligarh Terminal\nSolar power supply system -5 KVA, 415 V, AC, 3 Ph, N, (Solar Panels have redundancy Parallel redundant 2 nos X 100 % rating & Charge controller have 2 nos X 200% ratings) along with additional Battery charger & nickel cadmium battery bank with battery rack (suitable for solar charging, as per specification and datasheet). battery bank suitable for sufficient backup time at full load shall be provided for meeting critical loads that cannot withstand even a momentary interruption in voltage. Battery Banks -(2Nos. x 50% Ni-Cd Battery bank -10 hours battery backup for 4 kW continious load & 15 Minute back-up for 4 kw intermittent load ):Delivery of complete Solar power system shall be at Naumalighar terminal ,AGCL. Refer SLD -1009-NU-EL- SLD -4001 _0.solar Power system shall be complete in all respect.& system's functional responsibility shall be in vendors scope.Construction of battery room (building ) including complete civil work and electrical work as per Dwg-1009-CS -ARC-6003 REV -C1.shall be in contractor's scope | item3 | 1 | SET |
5 | 1.04 | Solar Panel System for Halmiramukh Terminal\nSolar power supply system -5 KVA, 415 V, AC, 3 Ph, N, (Solar Panels have redundancy Parallel redundant 2 nos X 100 % rating & Charge controller have 2 nos X 200% ratings) along with additional Battery charger & nickel cadmium battery bank with battery rack (suitable for solar charging, as per specification and datasheet). battery bank suitable for sufficient backup time at full load shall be provided for meeting critical loads that cannot withstand even a momentary interruption in voltage. Battery Banks -(2Nos. x 50% Ni-Cd Battery bank - 10 hours battery backup for 4 kW continious load & 15 Minute back-up for 3 kw intermittent load ):Delivery of complete Solar power system shall be at Halmiramukh terminal ,AGCL. Refer SLD -1009-HA-EL- SLD -4001 _0.solar Power system shall be complete in all respect.& system's functional responsibility shall be in vendors scope.Construction of battery room (building ) including complete civil work and electrical work as per Dwg-1009-CS -ARC-6003 REV -C1.shall be in contractor's scope | item4 | 1 | SET |
6 | 1.05 | Solar Panel System for Thoramukh Terminal\nSolar power supply system -5 KVA, 415 V, AC, 3 Ph, N, (Solar Panels have redundancy Parallel redundant 2 nos X 100 % rating & Charge controller have 2 nos X 200% ratings) along with additional Battery charger & nickel cadmium battery bank with battery rack (suitable for solar charging, as per specification and datasheet). battery bank suitable for sufficient backup time at full load shall be provided for meeting critical loads that cannot withstand even a momentary interruption in voltage. Battery Banks -(2Nos. x 50% Ni-Cd Battery bank -10 hours battery backup for 4 kW continious load & 15 Minute back-up for 3 kw intermittent load ):Delivery of complete Solar power system shall be at Thoramukh terminal ,AGCL. Refer SLD -1009-TH-EL- SLD -4001 _0.solar Power system shall be complete in all respect.& system's functional responsibility shall be in vendors scope.Construction of battery room (building ) including complete civil work and electrical work as per Dwg-1009-CS -ARC-6003 REV -C1.shall be in contractor's scope | item5 | 1 | SET |
7 | 1.06 | Solar Panel System for Sectionalizing Valve station (between Thoramukh and Numaligarh)\nSolar power supply system -3 KVA, 415 V, AC, 3 Ph, N, (Solar Panels have redundancy- Parallel redundant 2 nos X 100 % rating & Charge controller have 2 nos X 200% ratings) along with additional Battery charger & nickel cadmium battery bank with battery rack (suitable for solar charging, as per specification and datasheet). battery bank suitable for sufficient backup time at full load shall be provided for meeting critical loads that cannot withstand even a momentary interruption in voltage. Battery Banks -(2Nos. x 50% Ni-Cd Battery bank for 10 hours battery backup for 3 kW continious load & 15 Minute back-up for 2 kw intermittent load ) .Delivery of complete Solar power system shall be at SV-1(between Thoramukh and Numalighar) ,AGCL .Refer SLD -1009-SV-1-EL- SLD -4001 _0. solar Power system shall be complete in all respect.& system's functional responsibility shall be in vendors scope.Construction of battery room (building ) including complete civil work and electrical work as per Dwg-1009-CS -ARC-6003 REV -C1.shall be in contractor's scope. | item6 | 1 | SET |
8 | 1.07 | Solar Panel System for Sectionalizing Valve station (Between Uriumghat and Golaghat) \nSolar power supply system -3 KVA, 415 V, AC, 3 Ph, N, (Solar Panels have redundancy- Parallel redundant 2 nos X 100 % rating & Charge controller have 2 nos X 200% ratings) along with additional Battery charger & nickel cadmium battery bank with battery rack (suitable for solar charging, as per specification and datasheet). battery bank suitable for sufficient backup time at full load shall be provided for meeting critical loads that cannot withstand even a momentary interruption in voltage. Battery Banks -(2Nos. x 50% Ni-Cd Battery bank for 10 hours battery backup for 3 kW continious load & 15 Minute back-up for 2 kw intermittent load ) .Delivery of complete Solar power system shall be at SV-2 (Between Urimghat and Golaghat ) ,AGCLRefer SLD -1009-SV-2-EL- SLD -4001 _0.solar Power system shall be complete in all respect.& system's functional responsibility shall be in vendors scope.Construction of battery room (building ) including complete civil work and electrical work as per Dwg-1009-CS -ARC-6003 REV -C1.shall be in contractor's scope. | item7 | 1 | SET |
9 | 2 | SUPPLY AND INSTALLATION OF BATTERY SET FOR UPS | |||
10 | 2.01 | Battery set for Golaghat Terminal\n2 nos. X 50% nickel cadmium battery bank suitable for 6hours battery back-up for 2 X 5 kVA UPS system along with battery rack (For 2 X 100% 5 kVA UPS).Delivery of complete battery set shall be at Golaghat terminal | item 8 | 1 | SET |
11 | 2.02 | Battery set for Golaghat office\n2 nos. X 50% nickel cadmium battery bank suitable for 6hours battery back-up for 2 X 5 kVA UPS system along with battery rack (For 2 X 100% 5 kVA UPS).Delivery of complete battery set shall be at Golaghat office. | item 9 | 1 | SET |
12 | 2.03 | Battery set for Uriumghat Terminal \n2 nos. X 50% nickel cadmium battery bank suitable for 6hours battery back-up for 2 X 5 kVA UPS system along with battery rack (For 2 X 100% 5 kVA UPS).Delivery of complete battery set shall be at Urimghat terminal. | item 10 | 1 | SET |
13 | 2.04 | Battery set for Numaligarh Terminal \n2 nos. X 50% nickel cadmium battery bank suitable for 6hours battery back-up for 2 X 5 kVA UPS system along with battery rack (For 2 X 100% 5 kVA UPS).Delivery of complete battery set shall be at Naumalighar terminal. | item 11 | 1 | SET |
14 | 2.05 | Battery set for Halmiramukh Terminal \n2 nos. X 50% nickel cadmium battery bank suitable for 6hours battery back-up for 2 X 5 kVA UPS system along with battery rack (For 2 X 100% 5 kVA UPS).Delivery of complete battery set shall be at Halmiramukh terminal. | item 12 | 1 | SET |
15 | 2.06 | Battery set for Thoramukh Terminal \n2 nos. X 50% nickel cadmium battery bank suitable for 6hours battery back-up for 2 X 5 kVA UPS system along with battery rack (For 2 X 100% 5 kVA UPS).Delivery of complete battery set shall be at Thoramukh terminal. | item 13 | 1 | SET |
16 | 2.07 | Battery set for Nambar Station\n2 nos. X 50% nickel cadmium battery bank suitable for 6hours battery back-up for 2 X 5 kVA UPS system along with battery rack (For 2 X 100% 5 kVA UPS).Delivery of complete battery set shall be at Nambor terminal. | item 14 | 1 | SET |
17 | 2.08 | Battery set for Khoraghat Station\n2 nos. X 50% nickel cadmium battery bank suitable for 6hours battery back-up for 2 X 5 kVA UPS system along with battery rack (For 2 X 100% 5 kVA UPS).Delivery of complete battery set shall be at Khoraghat terminal. | item 15 | 1 | SET |
18 | 2.09 | Battery set for Sectionalizing Valve station (Between Thoramukh and Numaligarh)\n2 nos. X 50% nickel cadmium battery bank suitable for 6hours battery back-up for 2 X 3 kVA UPS system along with battery rack (For 2 X 100% 3 kVA UPS).Delivery of complete Battery set shall be at SV-1(between Thoramukh and Numalighar). | item 16 | 1 | SET |
19 | 2.1 | Battery set for Sectionalizing Valve station (Between Uriumghat and Golaghat)\n2 nos. X 50% nickel cadmium battery bank suitable for 6hours battery back-up for 2 X 3 kVA UPS system along with battery rack (For 2 X 100% 3 kVA UPS). Delivery of complete battery set shall be at SV-2 (Between Urimghat and Golaghat ). | item 17 | 1 | SET |