Procurement Of Solar Power Supply System, Golaghat-Assam

Assam Gas Company Limited has published Procurement Of Solar Power Supply System. Submission Date for this Tender is 29-08-2020. Electrical Maintenance Tenders in Golaghat Assam. Bidders can get complete Tender details and download the document.




Tender Notice

24772990
Corrigendum : Procurement Of Solar Power Supply System
Open Tender
Indian
Assam
Golaghat
29-08-2020

Tender Details

Procurement Of Solar Power Supply System , Supply Installation Testing & Commissioning Of Solar Powersystem With Battery Back-Up , Solar Panel System For Golaghat Terminal Lsolar Power Supply System -5 Kva , 415 V , Ac , 3 Ph , N , ( Solar Panels Have Redundancy Parallel Redundant 2 Nos X 100 % Rating & Charge Controller Have 2 Nos X 200% Ratings ) Along With Additional Battery Charger & Nickel Cadmium Battery Bank With Battery Rack ( Suitable For Solar Charging , As Per Specification And Datasheet ) . Battery Bank Suitable For Sufficient Backup Time At Full Load Shall Be Provided For Meeting Critical Loads That Cannot Withstand Even A Momentary Interruption In Voltage . Battery Banks - ( 2Nos . X 50% Ni-Cd Battery Bank - 10 Hours Battery Backup For 4 Kw Continious Load & 15 Minute Back-Up For 4 Kw Intermittent Load ) :Delivery Of Complete Solar Power System Shall Be At Golaghat Terminal , Agcl . Refer Sld -1009-Gg-El- Sld -4001 _0 . Solar Power System Shall Be Complete In All Respect . & Systems Functional Responsibility Shall Be In Vendors Scope . Construction Of Battery Room ( Building ) Including Complete Civil Work And Electrical Work As Per Dwg-1009-Cs -Arc-6003 Rev -C1 . Shall Be In Contractors Scope . , Solar Panel System For Uriumghat Terminal Solar Power Supply System -5 Kva , 415 V , Ac , 3 Ph , N , ( Solar Panels Have Redundancy Parallel Redundant 2 Nos X 100 % Rating & Charge Controller Have 2 Nos X 200% Ratings ) Along With Additional Battery Charger & Nickel Cadmium Battery Bank With Battery Rack ( Suitable For Solar Charging , As Per Specification And Datasheet ) . Battery Bank Suitable For Sufficient Backup Time At Full Load Shall Be Provided For Meeting Critical Loads That Cannot Withstand Even A Momentary Interruption In Voltage . Battery Banks - ( 2Nos . X 50% Ni-Cd Battery Bank - 10 Hours Battery Backup For 4 Kw Continious Load & 15 Minute Back-Up For 4 Kw Intermittent Load ) :Delivery Of Complete Solar Power System Shall Be At Urimghat Terminal , Agcl . Refer Sld -1009-Ur-El- Sld -4001 _0 . Solar Power System Shall Be Complete In All Respect . & Systems Functional Responsibility Shall Be In Vendors Scope . Construction Of Battery Room ( Building ) Including Complete Civil Work And Electrical Work As Per Dwg-1009-Cs -Arc-6003 Rev -C1 . Shall Be In Contractors Scope , Solar Panel System For Numaligarh Terminal Solar Power Supply System -5 Kva , 415 V , Ac , 3 Ph , N , ( Solar Panels Have Redundancy Parallel Redundant 2 Nos X 100 % Rating & Charge Controller Have 2 Nos X 200% Ratings ) Along With Additional Battery Charger & Nickel Cadmium Battery Bank With Battery Rack ( Suitable For Solar Charging , As Per Specification And Datasheet ) . Battery Bank Suitable For Sufficient Backup Time At Full Load Shall Be Provided For Meeting Critical Loads That Cannot Withstand Even A Momentary Interruption In Voltage . Battery Banks - ( 2Nos . X 50% Ni-Cd Battery Bank -10 Hours Battery Backup For 4 Kw Continious Load & 15 Minute Back-Up For 4 Kw Intermittent Load ) :Delivery Of Complete Solar Power System Shall Be At Naumalighar Terminal , Agcl . Refer Sld -1009-Nu-El- Sld -4001 _0 . Solar Power System Shall Be Complete In All Respect . & Systems Functional Responsibility Shall Be In Vendors Scope . Construction Of Battery Room ( Building ) Including Complete Civil Work And Electrical Work As Per Dwg-1009-Cs -Arc-6003 Rev -C1 . Shall Be In Contractors Scope , Solar Panel System For Halmiramukh Terminal Solar Power Supply System -5 Kva , 415 V , Ac , 3 Ph , N , ( Solar Panels Have Redundancy Parallel Redundant 2 Nos X 100 % Rating & Charge Controller Have 2 Nos X 200% Ratings ) Along With Additional Battery Charger & Nickel Cadmium Battery Bank With Battery Rack ( Suitable For Solar Charging , As Per Specification And Datasheet ) . Battery Bank Suitable For Sufficient Backup Time At Full Load Shall Be Provided For Meeting Critical Loads That Cannot Withstand Even A Momentary Interruption In Voltage . Battery Banks - ( 2Nos . X 50% Ni-Cd Battery Bank - 10 Hours Battery Backup For 4 Kw Continious Load & 15 Minute Back-Up For 3 Kw Intermittent Load ) :Delivery Of Complete Solar Power System Shall Be At Halmiramukh Terminal , Agcl . Refer Sld -1009-Ha-El- Sld -4001 _0 . Solar Power System Shall Be Complete In All Respect . & Systems Functional Responsibility Shall Be In Vendors Scope . Construction Of Battery Room ( Building ) Including Complete Civil Work And Electrical Work As Per Dwg-1009-Cs -Arc-6003 Rev -C1 . Shall Be In Contractors Scope , Solar Panel System For Thoramukh Terminal Solar Power Supply System -5 Kva , 415 V , Ac , 3 Ph , N , ( Solar Panels Have Redundancy Parallel Redundant 2 Nos X 100 % Rating & Charge Controller Have 2 Nos X 200% Ratings ) Along With Additional Battery Charger & Nickel Cadmium Battery Bank With Battery Rack ( Suitable For Solar Charging , As Per Specification And Datasheet ) . Battery Bank Suitable For Sufficient Backup Time At Full Load Shall Be Provided For Meeting Critical Loads That Cannot Withstand Even A Momentary Interruption In Voltage . Battery Banks - ( 2Nos . X 50% Ni-Cd Battery Bank -10 Hours Battery Backup For 4 Kw Continious Load & 15 Minute Back-Up For 3 Kw Intermittent Load ) :Delivery Of Complete Solar Power System Shall Be At Thoramukh Terminal , Agcl . Refer Sld -1009-Th-El- Sld -4001 _0 . Solar Power System Shall Be Complete In All Respect . & Systems Functional Responsibility Shall Be In Vendors Scope . Construction Of Battery Room ( Building ) Including Complete Civil Work And Electrical Work As Per Dwg-1009-Cs -Arc-6003 Rev -C1 . Shall Be In Contractors Scope , Solar Panel System For Sectionalizing Valve Station ( Between Thoramukh And Numaligarh ) Solar Power Supply System -3 Kva , 415 V , Ac , 3 Ph , N , ( Solar Panels Have Redundancy- Parallel Redundant 2 Nos X 100 % Rating & Charge Controller Have 2 Nos X 200% Ratings ) Along With Additional Battery Charger & Nickel Cadmium Battery Bank With Battery Rack ( Suitable For Solar Charging , As Per Specification And Datasheet ) . Battery Bank Suitable For Sufficient Backup Time At Full Load Shall Be Provided For Meeting Critical Loads That Cannot Withstand Even A Momentary Interruption In Voltage . Battery Banks - ( 2Nos . X 50% Ni-Cd Battery Bank For 10 Hours Battery Backup For 3 Kw Continious Load & 15 Minute Back-Up For 2 Kw Intermittent Load ) . Delivery Of Complete Solar Power System Shall Be At Sv-1 ( Between Thoramukh And Numalighar ) , Agcl . Refer Sld -1009-Sv-1-El- Sld -4001 _0 . Solar Power System Shall Be Complete In All Respect . & Systems Functional Responsibility Shall Be In Vendors Scope . Construction Of Battery Room ( Building ) Including Complete Civil Work And Electrical Work As Per Dwg-1009-Cs -Arc-6003 Rev -C1 . Shall Be In Contractors Scope . , Solar Panel System For Sectionalizing Valve Station ( Between Uriumghat And Golaghat ) Solar Power Supply System -3 Kva , 415 V , Ac , 3 Ph , N , ( Solar Panels Have Redundancy- Parallel Redundant 2 Nos X 100 % Rating & Charge Controller Have 2 Nos X 200% Ratings ) Along With Additional Battery Charger & Nickel Cadmium Battery Bank With Battery Rack ( Suitable For Solar Charging , As Per Specification And Datasheet ) . Battery Bank Suitable For Sufficient Backup Time At Full Load Shall Be Provided For Meeting Critical Loads That Cannot Withstand Even A Momentary Interruption In Voltage . Battery Banks - ( 2Nos . X 50% Ni-Cd Battery Bank For 10 Hours Battery Backup For 3 Kw Continious Load & 15 Minute Back-Up For 2 Kw Intermittent Load ) . Delivery Of Complete Solar Power System Shall Be At Sv-2 ( Between Urimghat And Golaghat ) , Agclrefer Sld -1009-Sv-2-El- Sld -4001 _0 . Solar Power System Shall Be Complete In All Respect . & Systems

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 07-Jul-2020 CORRIGENDUM 1 Other 25-07-2020
2 23-Jul-2020 Price Bid Opening Date Amended Date 08-08-2020
3 06-Aug-2020 Clause Addition and Modification Other 19-08-2020
4 13-Aug-2020 Pre Bid Querries Reply Other 19-08-2020
5 13-Aug-2020 Amendment/ Addition/ Modification/ Deletion of clause Other 19-08-2020
6 18-Aug-2020 CORRIGENDUM 6 Date 29-08-2020

Key Value

Document Fees
INR 8000 /-
EMD
INR 800000.0 /-
Tender Value
Refer document

BOQ Items

Name of Work: Nambor-Golaghat-Numaligarh Area Gas Pipeline Project
Sl. No. Item Description Item Code / Make Quantity Units
1 1 SUPPLY INSTALLATION TESTING & COMMISSIONING OF SOLAR POWERSYSTEM WITH BATTERY BACK-UP
2 1.01 Solar Panel System for Golaghat Terminal\nlSolar power supply system -5 KVA, 415 V, AC, 3 Ph, N, (Solar Panels have redundancy Parallel redundant 2 nos X 100 % rating & Charge controller have 2 nos X 200% ratings) along with additional Battery charger & nickel cadmium battery bank with battery rack (suitable for solar charging, as per specification and datasheet). battery bank suitable for sufficient backup time at full load shall be provided for meeting critical loads that cannot withstand even a momentary interruption in voltage. Battery Banks -(2Nos. x 50% Ni-Cd Battery bank - 10 hours battery backup for 4 kW continious load & 15 Minute back-up for 4 kw intermittent load ):Delivery of complete Solar power system shall be at Golaghat terminal ,AGCL. Refer SLD -1009-GG-EL- SLD -4001 _0.solar Power system shall be complete in all respect.& system's functional responsibility shall be in vendors scope.Construction of battery room (building ) including complete civil work and electrical work as per Dwg-1009-CS -ARC-6003 REV -C1.shall be in contractor's scope. item1 1 SET
3 1.02 Solar Panel System for Uriumghat Terminal\nSolar power supply system -5 KVA, 415 V, AC, 3 Ph, N, (Solar Panels have redundancy Parallel redundant 2 nos X 100 % rating & Charge controller have 2 nos X 200% ratings) along with additional Battery charger & nickel cadmium battery bank with battery rack (suitable for solar charging, as per specification and datasheet). battery bank suitable for sufficient backup time at full load shall be provided for meeting critical loads that cannot withstand even a momentary interruption in voltage. Battery Banks -(2Nos. x 50% Ni-Cd Battery bank - 10 hours battery backup for 4 kW continious load & 15 Minute back-up for 4 kw intermittent load ):Delivery of complete Solar power system shall be at Urimghat terminal ,AGCL. Refer SLD -1009-UR-EL- SLD -4001 _0.solar Power system shall be complete in all respect.& system's functional responsibility shall be in vendors scope.Construction of battery room (building ) including complete civil work and electrical work as per Dwg-1009-CS -ARC-6003 REV -C1.shall be in contractor's scope item2 1 SET
4 1.03 Solar Panel System for Numaligarh Terminal\nSolar power supply system -5 KVA, 415 V, AC, 3 Ph, N, (Solar Panels have redundancy Parallel redundant 2 nos X 100 % rating & Charge controller have 2 nos X 200% ratings) along with additional Battery charger & nickel cadmium battery bank with battery rack (suitable for solar charging, as per specification and datasheet). battery bank suitable for sufficient backup time at full load shall be provided for meeting critical loads that cannot withstand even a momentary interruption in voltage. Battery Banks -(2Nos. x 50% Ni-Cd Battery bank -10 hours battery backup for 4 kW continious load & 15 Minute back-up for 4 kw intermittent load ):Delivery of complete Solar power system shall be at Naumalighar terminal ,AGCL. Refer SLD -1009-NU-EL- SLD -4001 _0.solar Power system shall be complete in all respect.& system's functional responsibility shall be in vendors scope.Construction of battery room (building ) including complete civil work and electrical work as per Dwg-1009-CS -ARC-6003 REV -C1.shall be in contractor's scope item3 1 SET
5 1.04 Solar Panel System for Halmiramukh Terminal\nSolar power supply system -5 KVA, 415 V, AC, 3 Ph, N, (Solar Panels have redundancy Parallel redundant 2 nos X 100 % rating & Charge controller have 2 nos X 200% ratings) along with additional Battery charger & nickel cadmium battery bank with battery rack (suitable for solar charging, as per specification and datasheet). battery bank suitable for sufficient backup time at full load shall be provided for meeting critical loads that cannot withstand even a momentary interruption in voltage. Battery Banks -(2Nos. x 50% Ni-Cd Battery bank - 10 hours battery backup for 4 kW continious load & 15 Minute back-up for 3 kw intermittent load ):Delivery of complete Solar power system shall be at Halmiramukh terminal ,AGCL. Refer SLD -1009-HA-EL- SLD -4001 _0.solar Power system shall be complete in all respect.& system's functional responsibility shall be in vendors scope.Construction of battery room (building ) including complete civil work and electrical work as per Dwg-1009-CS -ARC-6003 REV -C1.shall be in contractor's scope item4 1 SET
6 1.05 Solar Panel System for Thoramukh Terminal\nSolar power supply system -5 KVA, 415 V, AC, 3 Ph, N, (Solar Panels have redundancy Parallel redundant 2 nos X 100 % rating & Charge controller have 2 nos X 200% ratings) along with additional Battery charger & nickel cadmium battery bank with battery rack (suitable for solar charging, as per specification and datasheet). battery bank suitable for sufficient backup time at full load shall be provided for meeting critical loads that cannot withstand even a momentary interruption in voltage. Battery Banks -(2Nos. x 50% Ni-Cd Battery bank -10 hours battery backup for 4 kW continious load & 15 Minute back-up for 3 kw intermittent load ):Delivery of complete Solar power system shall be at Thoramukh terminal ,AGCL. Refer SLD -1009-TH-EL- SLD -4001 _0.solar Power system shall be complete in all respect.& system's functional responsibility shall be in vendors scope.Construction of battery room (building ) including complete civil work and electrical work as per Dwg-1009-CS -ARC-6003 REV -C1.shall be in contractor's scope item5 1 SET
7 1.06 Solar Panel System for Sectionalizing Valve station (between Thoramukh and Numaligarh)\nSolar power supply system -3 KVA, 415 V, AC, 3 Ph, N, (Solar Panels have redundancy- Parallel redundant 2 nos X 100 % rating & Charge controller have 2 nos X 200% ratings) along with additional Battery charger & nickel cadmium battery bank with battery rack (suitable for solar charging, as per specification and datasheet). battery bank suitable for sufficient backup time at full load shall be provided for meeting critical loads that cannot withstand even a momentary interruption in voltage. Battery Banks -(2Nos. x 50% Ni-Cd Battery bank for 10 hours battery backup for 3 kW continious load & 15 Minute back-up for 2 kw intermittent load ) .Delivery of complete Solar power system shall be at SV-1(between Thoramukh and Numalighar) ,AGCL .Refer SLD -1009-SV-1-EL- SLD -4001 _0. solar Power system shall be complete in all respect.& system's functional responsibility shall be in vendors scope.Construction of battery room (building ) including complete civil work and electrical work as per Dwg-1009-CS -ARC-6003 REV -C1.shall be in contractor's scope. item6 1 SET
8 1.07 Solar Panel System for Sectionalizing Valve station (Between Uriumghat and Golaghat) \nSolar power supply system -3 KVA, 415 V, AC, 3 Ph, N, (Solar Panels have redundancy- Parallel redundant 2 nos X 100 % rating & Charge controller have 2 nos X 200% ratings) along with additional Battery charger & nickel cadmium battery bank with battery rack (suitable for solar charging, as per specification and datasheet). battery bank suitable for sufficient backup time at full load shall be provided for meeting critical loads that cannot withstand even a momentary interruption in voltage. Battery Banks -(2Nos. x 50% Ni-Cd Battery bank for 10 hours battery backup for 3 kW continious load & 15 Minute back-up for 2 kw intermittent load ) .Delivery of complete Solar power system shall be at SV-2 (Between Urimghat and Golaghat ) ,AGCLRefer SLD -1009-SV-2-EL- SLD -4001 _0.solar Power system shall be complete in all respect.& system's functional responsibility shall be in vendors scope.Construction of battery room (building ) including complete civil work and electrical work as per Dwg-1009-CS -ARC-6003 REV -C1.shall be in contractor's scope. item7 1 SET
9 2 SUPPLY AND INSTALLATION OF BATTERY SET FOR UPS
10 2.01 Battery set for Golaghat Terminal\n2 nos. X 50% nickel cadmium battery bank suitable for 6hours battery back-up for 2 X 5 kVA UPS system along with battery rack (For 2 X 100% 5 kVA UPS).Delivery of complete battery set shall be at Golaghat terminal item 8 1 SET
11 2.02 Battery set for Golaghat office\n2 nos. X 50% nickel cadmium battery bank suitable for 6hours battery back-up for 2 X 5 kVA UPS system along with battery rack (For 2 X 100% 5 kVA UPS).Delivery of complete battery set shall be at Golaghat office. item 9 1 SET
12 2.03 Battery set for Uriumghat Terminal \n2 nos. X 50% nickel cadmium battery bank suitable for 6hours battery back-up for 2 X 5 kVA UPS system along with battery rack (For 2 X 100% 5 kVA UPS).Delivery of complete battery set shall be at Urimghat terminal. item 10 1 SET
13 2.04 Battery set for Numaligarh Terminal \n2 nos. X 50% nickel cadmium battery bank suitable for 6hours battery back-up for 2 X 5 kVA UPS system along with battery rack (For 2 X 100% 5 kVA UPS).Delivery of complete battery set shall be at Naumalighar terminal. item 11 1 SET
14 2.05 Battery set for Halmiramukh Terminal \n2 nos. X 50% nickel cadmium battery bank suitable for 6hours battery back-up for 2 X 5 kVA UPS system along with battery rack (For 2 X 100% 5 kVA UPS).Delivery of complete battery set shall be at Halmiramukh terminal. item 12 1 SET
15 2.06 Battery set for Thoramukh Terminal \n2 nos. X 50% nickel cadmium battery bank suitable for 6hours battery back-up for 2 X 5 kVA UPS system along with battery rack (For 2 X 100% 5 kVA UPS).Delivery of complete battery set shall be at Thoramukh terminal. item 13 1 SET
16 2.07 Battery set for Nambar Station\n2 nos. X 50% nickel cadmium battery bank suitable for 6hours battery back-up for 2 X 5 kVA UPS system along with battery rack (For 2 X 100% 5 kVA UPS).Delivery of complete battery set shall be at Nambor terminal. item 14 1 SET
17 2.08 Battery set for Khoraghat Station\n2 nos. X 50% nickel cadmium battery bank suitable for 6hours battery back-up for 2 X 5 kVA UPS system along with battery rack (For 2 X 100% 5 kVA UPS).Delivery of complete battery set shall be at Khoraghat terminal. item 15 1 SET
18 2.09 Battery set for Sectionalizing Valve station (Between Thoramukh and Numaligarh)\n2 nos. X 50% nickel cadmium battery bank suitable for 6hours battery back-up for 2 X 3 kVA UPS system along with battery rack (For 2 X 100% 3 kVA UPS).Delivery of complete Battery set shall be at SV-1(between Thoramukh and Numalighar). item 16 1 SET
19 2.1 Battery set for Sectionalizing Valve station (Between Uriumghat and Golaghat)\n2 nos. X 50% nickel cadmium battery bank suitable for 6hours battery back-up for 2 X 3 kVA UPS system along with battery rack (For 2 X 100% 3 kVA UPS). Delivery of complete battery set shall be at SV-2 (Between Urimghat and Golaghat ). item 17 1 SET
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail