Secunderabad Division -Proposed Third Line Between Balharshah - Kazipet Station - Proposed Construction Of Rur Box (Cast In Situ) Of Size 6.50X7.288M (Inner Dimension) In Connection With Bye-Pass Line Between Hasanparthi-Warangal At Km 362/6-16, Execution-Telangana

South Central Railway has published Secunderabad Division -Proposed Third Line Between Balharshah - Kazipet Station - Proposed Construction Of Rur Box (Cast In Situ) Of Size 6.50X7.288M (Inner Dimension) In Connection With Bye-Pass Line Between Hasanparthi-Warangal At Km 362/6-16, Execution. Submission Date for this Tender is 28-07-2020. Road Work Tenders in Telangana. Bidders can get complete Tender details and download the document.




Tender Notice

24760261
Secunderabad Division -Proposed Third Line Between Balharshah - Kazipet Station - Proposed Construction Of Rur Box (Cast In Situ) Of Size 6.50X7.288M (Inner Dimension) In Connection With Bye-Pass Line Between Hasanparthi-Warangal At Km 362/6-16, Execution
Open Tender
Indian
Telangana
28-07-2020

Tender Details

Secunderabad Division -Proposed Third Line Between Balharshah - Kazipet Station - Proposed Construction Of Rur Box (Cast In Situ) Of Size 6.50X7.288M (Inner Dimension) In Connection With Bye-Pass Line Between Hasanparthi-Warangal At Km 362/6-16, Execution Of Earthwork In Formation, Cutting And Blanketing To The Standard Of Ge-14 For Diversion Of Exg. Up Line And Dn Main Line And Approaches Including Supply Of Ballast, Transportation Of Ballast & P-Way Materials, Linking Of Track And Connected Miscellaneous Works Between Hasanparti And Kazipet (Town) Stations.

Key Value

Document Fees
INR 10000 /-
EMD
INR 2116200.0 /-
Tender Value
INR 39.32 Crore /-

BOQ Items

0 1 2 3 4 5 6 7 8
0 S.No. Item Code Item Qty Qty Unit Unit Rate Basic Value Escl.(%) Amount Bidding\rUnit
1 Schedule A-Earthwork 48342795.00 Above/\rBelow/Par
2 1 011011 50000.00 cum 131.37 6568500.00 AT Par 6568500.00
3 Description:- Earthwork\rincutting(classified)information,trolleyrefuges,sidedrains,levelcrossing\rapproaches, platforms, catch water drains, diversion of nallah & finishing to required dimension and slopes to\robtain a neat appearance to standard profile inclusive of all labour, machine & materials and removing & leading\rall cut spoils either to make spoil dumps beyond 10m from cutting edge or for filling in embankment with leads\rwithin 2 km on either side of cutting edge, lifts, ascent, descent, loading, unloading, all taxes / royalty, clearance of\rsite and all incidental charges, bailing & pumping out water, if required, etc. complete as per directions of the\rEngineer-in-Charge. The work is to be executed as per latest / updated edition of "Guidelines for Earthwork in\rRailway Projects" issued by RDSO, Lucknow. Cut trees shall be property of Railways and to be deposited in the\rrailway godown unless specified otherwise in the Special Conditions of Contract. {Note - (i) All usable earth arising\rfrom cut spoils shall be led into bank formation and Unusable spoils shall be dumped / stacked (ii) All hard rock\r/and boulders not fit for filling will be stacked by the contractor and will be property of the Railways.} In all\rconditions and classifications of soil except rock
4 2 011012 25000.00 cum 291.03 7275750.00 AT Par 7275750.00
5 Description:- Earthwork\rincutting(classified)information,trolleyrefuges,sidedrains,levelcrossing\rapproaches, platforms, catch water drains, diversion of nallah & finishing to required dimension and slopes to\robtain a neat appearance to standard profile inclusive of all labour, machine & materials and removing & leading\rall cut spoils either to make spoil dumps beyond 10m from cutting edge or for filling in embankment with leads\rwithin 2 km on either side of cutting edge, lifts, ascent, descent, loading, unloading, all taxes / royalty, clearance of\rsite and all incidental charges, bailing & pumping out water, if required, etc. complete as per directions of the\rEngineer-in-Charge. The work is to be executed as per latest / updated edition of "Guidelines for Earthwork in\rRailway Projects" issued by RDSO, Lucknow. Cut trees shall be property of Railways and to be deposited in the\rrailway godown unless specified otherwise in the Special Conditions of Contract. {Note - (i) All usable earth arising\rfrom cut spoils shall be led into bank formation and Unusable spoils shall be dumped / stacked (ii) All hard rock\r/and boulders not fit for filling will be stacked by the contractor and will be property of the Railways.} Soft rock not\rrequiring blasting in all conditions
6 011013 25000.00 cum 468.81 11720250.00 AT Par 11720250.00
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail