Indian Navy-IN has published Installation Of Jci Ac Plant - In Ship. Submission Date for this Tender is 09-07-2020. Machine Tools Tenders in NAVAL DOCKYARD VISAKHAPATNAM Andhra Pradesh. Bidders can get complete Tender details and download the document.
Name of Work: <INSTALLATION OF JCI AC PLANT IN SHIP> | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1.01 | Installation and commissioning of JCI MAKE 03 AC PLANTS.\n1. Joint inspection of plant supplied by MO(V). .. | Item no 1 | 3 | NOS |
2 | 1.02 | Installation and commissioning of JCI MAKE 03 AC PLANTS.\n Supply of new foundation drawing for manufacturing. | Item no 2 | 3 | NOS |
3 | 1.03 | Installation and commissioning of JCI MAKE 03 AC PLANTS.\nShifting and installation of new foundation onboard ship | Item no 3 | 3 | NOS |
4 | 1.04 | Installation and commissioning of JCI MAKE 03 AC PLANTS.\nFitment of shock mounts. | Item no 4 | 3 | NOS |
5 | 1.05 | Installation and commissioning of JCI MAKE 03 AC PLANTS.\n Shifting of AC plants to foundation | Item no 5 | 3 | NOS |
6 | 1.06 | Installation and commissioning of JCI MAKE 03 AC PLANTS.\nConnecterisation of plants to electrical supply | Item no 6 | 3 | NOS |
7 | 1.07 | Installation and commissioning of JCI MAKE 03 AC PLANTS.\nProvisioning of necessary sockets on sea water and chilled water pipe lines | Item no 7 | 3 | NOS |
8 | 1.08 | Installation and commissioning of JCI MAKE 03 AC PLANTS.\n\n PT, VT, oil charging and gas charging\n | Item no 8 | 3 | NOS |
9 | 1.09 | Installation and commissioning of JCI MAKE 03 AC PLANTS.\n STW & MTU trails | Item no 9 | 3 | NOS |
10 | 1.1 | Installation and commissioning of JCI MAKE 03 AC PLANTS.\n Submit operating and manufacturing manual for reference. | Item no 10 | 3 | NOS |
11 | 1.11 | Installation and commissioning of JCI MAKE 03 AC PLANTS.\n Training for operations. | Item no 11 | 3 | NOS |
12 | 2.01 | Mandatory Spares\nSuction line piping with necessary valve and fittings. | Item no 12 | 3 | PCS |
13 | 2.02 | Mandatory Spares\nDischarge line piping with necessary valve and fittings. | Item no 13 | 3 | PCS |
14 | 2.03 | Mandatory Spares\nLiquid injection line with necessary valve and fittings. | Item no 14 | 3 | Nos |
15 | 2.04 | Mandatory Spares\nVibration eliminator for suction line. | Item no 15 | 3 | Nos |
16 | 2.05 | Mandatory Spares\nVibration eliminator for discharge line. | Item no 16 | 3 | Nos |
17 | 2.06 | Mandatory Spares\nBase frame. | Item no 17 | 3 | Nos |
18 | 2.07 | Mandatory Spares\nRefrigerant R134A.ES6400B-5207965 | Item no 18 | 9 | PCS |
19 | 2.08 | Mandatory Spares\nPOE oil. | Item no 19 | 120 | ltrs |
20 | 2.09 | Mandatory Spares\nPG GLYCERINE(.)1 to 9 kg/cm2(G),1/4"NPT(M). | Item no 20 | 3 | PCS |
21 | 2.1 | Mandatory Spares\nTEMP GAUGE(Machine Glass)(.) 0 to 100degC). | Item no 21 | 6 | PCS |
22 | 2.11 | Mandatory Spares \n.Liquid Injection Solenoid Valve. | Item no 22 | 6 | PCS |
23 | 2.12 | Mandatory Spares \nLiquid Injection TCV. | Item no 23 | 3 | PCS |
24 | 2.13 | Mandatory Spares \nFLOW switch-chilled water and sea water.ES6400B-5209962 | Item no 24 | 6 | pCS |
25 | 2.14 | Mandatory Spares \nThermostatic Expansion Valve.ES6400B-5209316 | Item no 25 | 6 | PCS |
26 | 2.15 | Mandatory Spares \nSolenoid Valve with Strainer. | Item no 26 | 6 | PCS |
27 | 2.16 | Mandatory Spares \nFilter Drier Core. | Item no 27 | 12 | pCS |
28 | 2.17 | Mandatory Spares \nFilter Drier Housing. | Item no 28 | 3 | PCS |
29 | 2.18 | Mandatory Spares \nTEMP switch discharge temperature. | Item no 29 | 6 | PCS |
30 | 2.19 | Mandatory Spares \nOil Press switch 1/4"NPT(M). | Item no 30 | 3 | PCS |
31 | 2.2 | Mandatory Spares \nTEMP switch suction temperature. | Item no 31 | 6 | PCS |
32 | 2.21 | Mandatory Spares \nPress switch 1/4"NPT(M) suction pressure. | Item no 32 | 3 | PCS |
33 | 2.22 | Mandatory Spares \nPress switch 1/4"NPT(M) discharge pressure. | Item no 33 | 3 | PCS |
34 | 2.23 | Mandatory Spares \nPress trans 1/4"NPT(M) suction pressure. | Item no 34 | 3 | PCS |
35 | 2.24 | Mandatory Spares \nPress trans 1/4"NPT(M) Discharge pressure. | Item no 35 | 12 | PCS |
36 | 2.25 | Mandatory Spares \nTEMP PROBE120MM-80MM(-50 to 100degC)suction, discharge, chilled water in/out. | Item no 36 | 12 | PCS |
37 | 2.26 | Mandatory Spares \nPG BURDEN type 0 to 25 kg/cm2(G),1/4"NPT(M). | Item no 37 | 6 | PCS |
38 | 2.27 | Mandatory Spares \nDPG for oil type 0 to 10 kg/cm2(G),1/4"NPT(M). | Item no 38 | 3 | PCS |
39 | 2.28 | Mandatory Spares \nPG BURDEN type 0 to 10kg/cm2(G),1/4"NPT(M). | Item no 39 | 12 | PCS |
40 | 2.29 | Mandatory Spares \nTEMP GAUGE(Machine Glass)(.)30 to 50degC). | Item no 40 | 9 | PCS |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail