Structural Modification , Cabling , Device Installation And Fabrication Work For Installation Of Radar Amdr Onboard In Ship , Deck Strengthening ( Material Aluminium ) Welding Rods/Aluminum Spools Are To Be Supplied By The Firm . Antenna Deck Strengthening ( Material Aluminium ) As Per Wld . , Manufacture And Install Of Base Foundations With Associated Hot Work And Re-Gutting For The Following As Per Referred Drawings ( All The Materials Are Supplied By The Firm ) At Hf Compartment . Manufacturing Of Basement Foundations For Rpr , Transmitter Device , Cooling Device , Acb , Heat Exchanger , Interface Device , Pdbs , Wave Guide Run With Harmonic Filters , Power Supply Sockets , As Per Wlds ( Ref Document No: Qadb/Cor/2016/003 ) Along With Associated Re Gutting And Manufacturing Of Eye Hooks To Lift Devices . , Manufacture And Install Of Base Foundations With Associated Hot Work And Re-Gutting For The Following As Per Referred Drawings ( All The Materials Are Supplied By The Firm ) At Hf Compartment . Fitment Of Tpr , Transmitter Device , Cooling Device , Acb , Heat Exchanger , Interface Device , Pdbs , Wave Guide Run With Harmonic Filters , Power Supply Sockets , As Per Wlds ( Ref Document No: Qadb/Cor/2016/003 ) , All Base Foundations To Be Pinted And Fitment Of Eye Hooks To Lift Devices . , Resiting / Blanking . Resiting / Blanking Of The Existing Ventilation Trunking Feeding The Cabinets Of Radar Positive-E In Hf Compartment And Positive-E Centre Post ( Subject To Inspection On Site ) . , Resiting . Resiting Of The Existing Light Fixtures And Manufacturing Of Additional Cable Trays In The Hf Compartment , Positive-E Centre Post And Ops Room During Installation And Associated Regutting And Hot Work ( Subject To Inspection On Site ) . . , Manufacturing . Manufacturing Of 06 Deck Tubes And 09 Bulkhead Glands Of Material Ss/Aluminum And Fitment Of The Same . The Glands Are To Be Repacked Post Cable Laying And Proven During Air Pressure Test ( Apt ) Of The Ship . . , Repacking . The Glands Are To Be Repacked Post Cable Laying And Proven During Air Pressure Test ( Apt ) Of The Ship . . , Cabling . Cabling Of Approximately 1500 Meters ( Proposed Length ) In Channel Trays As Per Wld ( Ref Document No: Qadb/Cor/ 2016/004 ) Supply And Installation Of Cable Trays , Aluminum Cable Tallies With Engraved And Embossed Lettering At Both The Ends , Earth Strips For Cables And Devices And C Clamps . . , Termination Of Old / Unused Cables . Termination Of Old / Unused Cables By Terminating The Shield Circumferentially And Grounding The Core At Both Ends . . , Connectorisation { ( A ) Identification Of Cable Ends B ) Cable End Preparation C ) Preparation Of Core End For Clamping D ) Crimping Of Contacts And Insertion Of Contacts E ) Shield/Screen Termination F ) Earth Connection G ) Check Wire . } . Connectorisation Of Over 150 Connectors And Glands For Powering Up The System With Associated Cable Booting For The Same . . , Earthing ( Earth Strips Are To Be Supplied By Firm ) . Proper Earthing/Bonding Of All Units As Per Nec-Std 1101 . , Manufacturing And Fitment Of Clamps . Manufacturing And Fitment Of Clamps For Mounting Of The Channel Trays And Bulkhead Mounted Devices , As Required . . , Supply And Installation . Supply And Installation Of 01 In No Transformer , 02 In No Pdbs And 05 Nos 220V , 50 Hz Supply Boards ( With 5/15 Amp Sockets With Switch Each Board 06 Sockets ) Along With Associated Degutting , Manufacturing Of Base Plate , Regutting And Cabling . ( Location Would Be Indicated By The Yard ) . , Supply And Installation . Supply And Installation Of One 2 Ton Marine Air Conditioner Along With Reducer , Flow Meter , Chilled Water Pipe Lines And Power Socket In Amdr Hf Post . . , Provisioning Of All The Lagging And Welding Material . Provisioning Of All The De-Laging/ Lagging And Welding Material During Regutting And Welding Of All The Devices And Compartments . . , Provisioning Of Weather Protecting Covers . Provisioning Of Weather Protecting Covers To All The Cable Trays And Wave Guide Run From Antenna To Hf Compartment .