Defence Government Departments Closing in 0 days TDR #24754064

Structural Modification , Cabling , Device Installation And Fabrication Work For Installation Of Radar Amdr Onboard In Ship

Issued by Government Departments · NAVAL DOCKYARD VISAKHAPATNAM, Andhra Pradesh
Tender Value
Ref. Documents
Estimated cost
Bid Submission
23 Jul 2020
0 days left
EMD
26000
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
NAVAL DOCKYARD VISAKHAPATNAM → Andhra Pradesh
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Structural Modification , Cabling , Device Installation And Fabrication Work For Installation Of Radar Amdr Onboard In Ship , Deck Strengthening ( Material Aluminium ) Welding Rods/Aluminum Spools Are To Be Supplied By The Firm . Antenna Deck Strengthening ( Material Aluminium ) As Per Wld . , Manufacture And Install Of Base Foundations With Associated Hot Work And Re-Gutting For The Following As Per Referred Drawings ( All The Materials Are Supplied By The Firm ) At Hf Compartment . Manufacturing Of Basement Foundations For Rpr , Transmitter Device , Cooling Device , Acb , Heat Exchanger , Interface Device , Pdbs , Wave Guide Run With Harmonic Filters , Power Supply Sockets , As Per Wlds ( Ref Document No: Qadb/Cor/2016/003 ) Along With Associated Re Gutting And Manufacturing Of Eye Hooks To Lift Devices . , Manufacture And Install Of Base Foundations With Associated Hot Work And Re-Gutting For The Following As Per Referred Drawings ( All The Materials Are Supplied By The Firm ) At Hf Compartment . Fitment Of Tpr , Transmitter Device , Cooling Device , Acb , Heat Exchanger , Interface Device , Pdbs , Wave Guide Run With Harmonic Filters , Power Supply Sockets , As Per Wlds ( Ref Document No: Qadb/Cor/2016/003 ) , All Base Foundations To Be Pinted And Fitment Of Eye Hooks To Lift Devices . , Resiting / Blanking . Resiting / Blanking Of The Existing Ventilation Trunking Feeding The Cabinets Of Radar Positive-E In Hf Compartment And Positive-E Centre Post ( Subject To Inspection On Site ) . , Resiting . Resiting Of The Existing Light Fixtures And Manufacturing Of Additional Cable Trays In The Hf Compartment , Positive-E Centre Post And Ops Room During Installation And Associated Regutting And Hot Work ( Subject To Inspection On Site ) . . , Manufacturing . Manufacturing Of 06 Deck Tubes And 09 Bulkhead Glands Of Material Ss/Aluminum And Fitment Of The Same . The Glands Are To Be Repacked Post Cable Laying And Proven During Air Pressure Test ( Apt ) Of The Ship . . , Repacking . The Glands Are To Be Repacked Post Cable Laying And Proven During Air Pressure Test ( Apt ) Of The Ship . . , Cabling . Cabling Of Approximately 1500 Meters ( Proposed Length ) In Channel Trays As Per Wld ( Ref Document No: Qadb/Cor/ 2016/004 ) Supply And Installation Of Cable Trays , Aluminum Cable Tallies With Engraved And Embossed Lettering At Both The Ends , Earth Strips For Cables And Devices And C Clamps . . , Termination Of Old / Unused Cables . Termination Of Old / Unused Cables By Terminating The Shield Circumferentially And Grounding The Core At Both Ends . . , Connectorisation { ( A ) Identification Of Cable Ends B ) Cable End Preparation C ) Preparation Of Core End For Clamping D ) Crimping Of Contacts And Insertion Of Contacts E ) Shield/Screen Termination F ) Earth Connection G ) Check Wire . } . Connectorisation Of Over 150 Connectors And Glands For Powering Up The System With Associated Cable Booting For The Same . . , Earthing ( Earth Strips Are To Be Supplied By Firm ) . Proper Earthing/Bonding Of All Units As Per Nec-Std 1101 . , Manufacturing And Fitment Of Clamps . Manufacturing And Fitment Of Clamps For Mounting Of The Channel Trays And Bulkhead Mounted Devices , As Required . . , Supply And Installation . Supply And Installation Of 01 In No Transformer , 02 In No Pdbs And 05 Nos 220V , 50 Hz Supply Boards ( With 5/15 Amp Sockets With Switch Each Board 06 Sockets ) Along With Associated Degutting , Manufacturing Of Base Plate , Regutting And Cabling . ( Location Would Be Indicated By The Yard ) . , Supply And Installation . Supply And Installation Of One 2 Ton Marine Air Conditioner Along With Reducer , Flow Meter , Chilled Water Pipe Lines And Power Socket In Amdr Hf Post . . , Provisioning Of All The Lagging And Welding Material . Provisioning Of All The De-Laging/ Lagging And Welding Material During Regutting And Welding Of All The Devices And Compartments . . , Provisioning Of Weather Protecting Covers . Provisioning Of Weather Protecting Covers To All The Cable Trays And Wave Guide Run From Antenna To Hf Compartment .

Corrigendum

Sr No Corrigendum Date Corrigendum Type New Submission Date
1 15-Jul-2020 EDC Other 23-Jul-2020

BOQ

Name of Work: <STRUCTURAL MODIFICATION, CABLING, DEVICE INSTALLATION AND FABRICATION WORK FOR INSTALLATION OF RADAR AMDR IN SHIP>
Sl.No.Item DescriptionItem Code / MakeQuantityUnits
11.01Deck strengthening (Material Aluminium) welding rods/aluminum spools are to be supplied by the firm .Antenna Deck strengthening (Material Aluminium) as per WLD .Item no 11NOS
21.02Manufacture and Install of base foundations with associated hot work and re-gutting for the following as per referred drawings (All the materials are supplied by the firm)at HF Compartment.Manufacturing of basement foundations for RPR, Transmitter device, Cooling device, ACB, Heat exchanger, Interface device, PDBs, Wave guide run with Harmonic filters, Power supply sockets, as per WLDs(Ref document no: QADB/COR/2016/003) along with associated re gutting and Manufacturing of EYE hooks to lift devices .Item no 210NOS
31.03Manufacture and Install of base foundations with associated hot work and re-gutting for the following as per referred drawings (All the materials are supplied by the firm)at HF Compartment. Fitment of TPR, Transmitter device, Cooling device, ACB, Heat exchanger, Interface device, PDBs, Wave guide run with Harmonic filters, Power supply sockets, as per WLDs(Ref document no: QADB/COR/2016/003), all base foundations to be pinted and fitment of EYE hooks to lift devices .Item no 310NOS
41.04Resiting / Blanking .Resiting / Blanking of the existing Ventilation Trunking feeding the cabinets of Radar Positive-E in HF Compartment and Positive-E Centre post (subject to inspection on site) .Item no 41NOS
51.05Resiting .Resiting of the existing light fixtures and manufacturing of additional cable trays in the HF compartment, Positive-E Centre post and OPS room during installation and associated regutting and hot work (subject to inspection on site). .Item no 51NOS
61.06Manufacturing .Manufacturing of 06 Deck tubes and 09 Bulkhead glands of material SS/Aluminum and fitment of the same. The glands are to be repacked post cable laying and proven during Air Pressure Test (APT) of the ship. .Item no 615NOS
71.07Repacking.The glands are to be repacked post cable laying and proven during Air Pressure Test (APT) of the ship. .Item no 71NOS
81.08Cabling .Cabling of approximately 1500 meters (proposed length) in channel trays as per WLD(Ref document no: QADB/COR/ 2016/004) Supply and installation of Cable trays, Aluminum Cable Tallies with engraved and embossed lettering at both the ends, Earth strips for cables and Devices and C clamps. .Item no 81500NOS
91.09Termination of old / unused cables .Termination of old / unused cables by terminating the shield circumferentially and grounding the core at both ends. .Item no 91NOS
101.1Connectorisation {(a) Identification of Cable ends\nb) Cable end preparation\nc) Preparation of core end for clamping\nd) Crimping of contacts and Insertion of contacts\ne) Shield/Screen termination\nf) Earth connection\ng) Check wire.} .Connectorisation of over 150 connectors and glands for powering up the system with associated cable booting for the same..Item no 10150NOS
111.11Earthing (earth strips are to be supplied by firm).Proper earthing/bonding of all units as per NEC-STD 1101 .Item no 111NOS
121.12Manufacturing and fitment of Clamps.Manufacturing and fitment of Clamps for mounting of the channel trays and bulkhead mounted devices, as required..Item no 121NOS
131.13Supply and Installation .Supply and Installation of 01 in No transformer , 02 in No PDBs and 05 Nos 220V, 50 Hz supply boards (with 5/15 amp sockets with switch each board 06 sockets) along with associated degutting, manufacturing of base plate, regutting and cabling. (Location would be indicated by the yard).Item no 131NOS
141.14Supply and Installation .Supply and Installation of one 2 Ton Marine air conditioner along with reducer, flow meter, chilled water pipe lines and power socket in AMDR HF Post..Item no 141NOS
151.15Provisioning of all the lagging and welding material .Provisioning of all the De-laging/ lagging and welding material during regutting and welding of all the devices and compartments..Item no 151NOS
161.16Provisioning of weather protecting covers .Provisioning of weather protecting covers to all the cable trays and wave guide run from Antenna to HF compartment.Item no 161NOS

AI Tender Summary

OUR REF NO 24754064
AUTHORITY Government Departments
TENDER VALUE Ref. Documents
LAST DATE 23-07-2020
Authority
Authority Name Indian Navy
Work Description Structural Modification , Cabling , Device Installation And Fabrication Work For Installation Of Radar Amdr Onboard In Ship , Deck Strengthening ( Material Aluminium ) Welding Rods/Aluminum Spools Are To Be Supplied By The Firm . Antenna Deck Strengthening ( Material Aluminium ) As Per Wld . , Manufacture And Install Of Base Foundations With Associated Hot Work And Re-Gutting For The Following As Per Referred Drawings ( All The Materials Are Supplied By The Firm ) At Hf Compartment . Manufacturing Of Basement Foundations For Rpr , Transmitter Device , Cooling Device , Acb , Heat Exchanger , Interface Device , Pdbs , Wave Guide Run With Harmonic Filters , Power Supply Sockets , As Per Wlds ( Ref Document No: Qadb/Cor/2016/003 ) Along With Associated Re Gutting And Manufacturing Of Eye Hooks To Lift Devices . , Manufacture And Install Of Base Foundations With Associated Hot Work And Re-Gutting For The Following As Per Referred Drawings ( All The Materials Are Supplied By The Firm ) At Hf Compartment . Fitment Of Tpr , Transmitter Device , Cooling Device , Acb , Heat Exchanger , Interface Device , Pdbs , Wave Guide Run With Harmonic Filters , Power Supply Sockets , As Per Wlds ( Ref Document No: Qadb/Cor/2016/003 ) , All Base Foundations To Be Pinted And Fitment Of Eye Hooks To Lift Devices . , Resiting / Blanking . Resiting / Blanking Of The Existing Ventilation Trunking Feeding The Cabinets Of Radar Positive-E In Hf Compartment And Positive-E Centre Post ( Subject To Inspection On Site ) . , Resiting . Resiting Of The Existing Light Fixtures And Manufacturing Of Additional Cable Trays In The Hf Compartment , Positive-E Centre Post And Ops Room During Installation And Associated Regutting And Hot Work ( Subject To Inspection On Site ) . . , Manufacturing . Manufacturing Of 06 Deck Tubes And 09 Bulkhead Glands Of Material Ss/Aluminum And Fitment Of The Same . The Glands Are To Be Repacked Post Cable Laying And Proven During Air Pressure Test ( Apt ) Of The Ship . . , Repacking . The Glands Are To Be Repacked Post Cable Laying And Proven During Air Pressure Test ( Apt ) Of The Ship . . , Cabling . Cabling Of Approximately 1500 Meters ( Proposed Length ) In Channel Trays As Per Wld ( Ref Document No: Qadb/Cor/ 2016/004 ) Supply And Installation Of Cable Trays , Aluminum Cable Tallies With Engraved And Embossed Lettering At Both The Ends , Earth Strips For Cables And Devices And C Clamps . . , Termination Of Old / Unused Cables . Termination Of Old / Unused Cables By Terminating The Shield Circumferentially And Grounding The Core At Both Ends . . , Connectorisation { ( A ) Identification Of Cable Ends B ) Cable End Preparation C ) Preparation Of Core End For Clamping D ) Crimping Of Contacts And Insertion Of Contacts E ) Shield/Screen Termination F ) Earth Connection G ) Check Wire . } . Connectorisation Of Over 150 Connectors And Glands For Powering Up The System With Associated Cable Booting For The Same . . , Earthing ( Earth Strips Are To Be Supplied By Firm ) . Proper Earthing/Bonding Of All Units As Per Nec-Std 1101 . , Manufacturing And Fitment Of Clamps . Manufacturing And Fitment Of Clamps For Mounting Of The Channel Trays And Bulkhead Mounted Devices , As Required . . , Supply And Installation . Supply And Installation Of 01 In No Transformer , 02 In No Pdbs And 05 Nos 220V , 50 Hz Supply Boards ( With 5/15 Amp Sockets With Switch Each Board 06 Sockets ) Along With Associated Degutting , Manufacturing Of Base Plate , Regutting And Cabling . ( Location Would Be Indicated By The Yard ) . , Supply And Installation . Supply And Installation Of One 2 Ton Marine Air Conditioner Along With Reducer , Flow Meter , Chilled Water Pipe Lines And Power Socket In Amdr Hf Post . . , Provisioning Of All The Lagging And Welding Material . Provisioning Of All The De-Laging/ Lagging And Welding Material During Regutting And Welding Of All The Devices And Compartments . . , Provisioning Of Weather Protecting Covers . Provisioning Of Weather Protecting Covers To All The Cable Trays And Wave Guide Run From Antenna To Hf Compartment .
Basic Detail
Tender No COM/OFF/WEA/19-20/470
Bidding Type Tender
Location
City NAVAL DOCKYARD VISAKHAPATNAM
State Andhra Pradesh
Key Dates
Publish Date 15 Jul 2020
Submission Date 23 Jul 2020
Open Date 24 Jul 2020
Finance
Tender Value Ref. Documents
Tender Fee Ref. Documents
EMD 26000
Exemption Not Available
Document List
B57A8A54-A203-46DA-B2FD-A82C4277B41B.html
BOQ_398351.xls
TEWITHDATES470.pdf
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Jul 15, 2020
11:30 IST

Tender Published

Tender notice published.

Completed
Jul 23, 2020
18:00 IST

Corrigendum-1 Issued

Clarifications on tender conditions and amendments issued.

Completed
Jul 23, 2020
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Jul 24, 2020

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
html

B57A8A54-A203-46DA-B2FD-A82C4277B41B.html

xls

BOQ_398351.xls

pdf

TEWITHDATES470.pdf

pdf

Tendernotice_1.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders