}

Construction Of Electrical Installation Building And 3 Nos Relay Hut In Connection With Replacement Of Signaling Gear With Electronic Interlocking At Hazrat Nizamuddin Under Sr. Den/Works.-Delhi

Northern Railway-NR has published Construction Of Electrical Installation Building And 3 Nos Relay Hut In Connection With Replacement Of Signaling Gear With Electronic Interlocking At Hazrat Nizamuddin Under Sr. Den/Works.. Submission Date for this Tender is 31-07-2020. Gear Product Tenders in Delhi. Bidders can get complete Tender details and download the document.




Tender Notice

24743795
Construction Of Electrical Installation Building And 3 Nos Relay Hut In Connection With Replacement Of Signaling Gear With Electronic Interlocking At Hazrat Nizamuddin Under Sr. Den/Works.
Open Tender
Indian
Delhi
31-07-2020

Tender Details

Construction Of Electrical Installation Building And 3 Nos Relay Hut In Connection With Replacement Of Signaling Gear With Electronic Interlocking At Hazrat Nizamuddin Under Sr. Den/Works.

Key Value

Document Fees
INR 5900 /-
EMD
INR 247400.0 /-
Tender Value
INR 1.94 Crore /-

BOQ Items

0 1 2 3 4 5 6 7 8
0 S.No. Item Code Item Qty Qty Unit Unit Rate Basic Value Escl.(%) Amount Bidding Unit
1 Schedule A-Schedule A USSOR item 12170025.00
2 1 Please see Item Breakup for details. 49908.48 27.01 63388.76 Above/\rBelow/Par
3 Description:- All items in all chapters of NR/DLI USSOR-2010 edition (Corrected upto date) except Ch. & Items\rquoted in this schedule and except items banned by HQ (Corrected upto date) for USSOR-2010 complete for all\rL&M as per Indian Railways Unified standard Specifications (Works & Materials) Volume-I & II 2010 edition\r(Corrected upto date).
4 2 Please see Item Breakup for details. 21325.44 15.16 24558.38 Above/\rBelow/Par
5 Description:- All items under chapter No.1 i.e. the chapter of Earth Work except items banned by HQ (Corrected\rupto date) for USSOR-2010) of NR/DLI USSOR-2010 edition (Corrected upto date) complete for all L&M as per\rIndian Railways Unified standard Specifications (Works & Materials) Volume-I & II 2010 edition (Corrected upto\rdate).
6 3 Please see Item Breakup for details. 36744.00 15.37 42391.55 Above/\rBelow/Par
7 Description:- All items under chapter No.2 i.e. the chapter of CARRIAGE OF MATERIALS except items banned\rby HQ (Corrected upto date) for USSOR-2010) of NR/DLI USSOR-2010 edition (Corrected upto date) complete\rfor all L&M as per Indian Railways Unified standard Specifications (Works & Materials) Volume-I & II 2010 edition\r(Corrected upto date).
8 4 Please see Item Breakup for details. 957950.00 22.52 1173680.34 Above/\rBelow/Par
9 Description:- Item No.033060 (033061 to 033064) under chapter No.3 i.e. item of Cement of NR/DLI USSOR-\r2010 edition (Corrected upto date) complete for all L&M as per Indian Railways Unified standard Specifications\r(Works & Materials) Volume-I & II 2010 edition (Corrected upto date).
10 5 Please see Item Breakup for details. 2388516.00 13.10 2701411.60 Above/\rBelow/Par
11 Description:- Item No.045010 (045011 to 045016) under chapter No.4 i.e. item of Steel Reinforced of NR/DLI\rUSSOR-2010edition(Correcteduptodate) completeforallL&MasperIndianRailwaysUnifiedstandard\rSpecifications (Works & Materials) Volume-I & II 2010 edition (Corrected upto date).of USSOR-2010 (Corrected\rup to date)
12 Please see Item Breakup for details. 17517.50 23.56 21644.62 Above/\rBelow/Par
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail