Military Engineer Services-MES has published Repair/Replacement Of Various Capacity Of Dg Sets , Amf Panels And Change Over Switches And Allied Works At Mouza Dalan And Sirsa Camp At Army Station Katihar Under Age ( I ) ( Af ) Purnea. Submission Date for this Tender is 13-07-2020. Switch Supply Tenders in AGE (I) (AF) PURNEA Bihar. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 06-Jul-2020 | Bid Auto Extn Corrigendum | Bid Auto Extn Corrigendum | 13-07-2020 |
Name of Work: REPAIR/REPLACEMENT OF VARIOUS CAPACITY OF DG SETS,AMF PANELS AND CHANGE OVER SWITCHES AND ALLIED WORKS AT MOUZA DALAN AND SIRSA CAMP AT ARMY STATION KATIHAR UNDER AGE (I) (AF) PURNEA | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1 | DG SET OF CAPACITY 160 KVA (Kirloskar)\nM&L for Servicing/overhauling of stand by DG Set capacity 160KVA installed in ARO complex , segregation of serviceable and unserviceable parts including cleaning, re-fixing of all serviceable parts and testing etc. complete all as specified and directed by the Engr- in -Charge. | 1 | Job | |
2 | 2 | Supply and fix in replacement of following unserviceable parts suitable for stand by DG Set capacity 160 KVA installed in ARO complex against Sch item No. 3 above :- (a) Fuel Filter Element Pre Make :- Kirlosker /Mico | 1 | Each | |
3 | 3 | (b) Fuel Filter Element micro Make :- Kirlosker /Mico | 1 | Each | |
4 | 4 | (c) Lub Oil Filter Make :- Kirlosker /Mico | 1 | Each | |
5 | 5 | (d) Oil filter Make :- Kirlosker /Mico | 1 | Each | |
6 | 6 | (e) Air cleaner element inner &outer make Kirloskar/MICO | 1 | Each | |
7 | 7 | (f) Rubber Hose pipe | 2 | Each | |
8 | 8 | (g) Topping up of Coolent Make:- Servo / Castrol | 20 | Ltrs | |
9 | 9 | (h) Flexible fuel pipes | 2 | Each | |
10 | 10 | (i) Fan Belts Make Fenner | 1 | Each | |
11 | 11 | (j) Engine oil(20W40) Make Servo/Castrol/HP | 20 | Ltrs | |
12 | 12 | Repair to door panel of DG SET by taking down carefully door panel of the DG SET 160 KVA and refitted after replacement of the hinges -02 Nos and welding work if reqd to set & fix the door panel properly | 2 | Each job | |
13 | 13 | M&L for Opening of defective AMF Panel of capacity 160 KVA and segregating serviceable and un serviceable parts and refixing the serviceable parts along with the following new parts suitable for 160 KVA DG Set complete all as directed:-\ni) Complete internal wiring of interconnected contactor bus bar .\nii) Replacement of Relay Model MCX- 34 contractor=2 Nos.\niii) Push switch-02Nos\niv) Indicator lamp-6 Nos\nv) Timer delay relay suitable \nvi) Electronic battery charger kit box-1 vii) MCB Fuse unit of 250 A rating for DG & main supply-02 nos | 1 | Each Job | |
14 | 14 | DG SET OF CAPACITY 125 KVA (Kirloskar)\nM&L for Servicing/overhauling of stand by DG Set capacity 125 KVA installed in power house in OT area, segregation of serviceable and unserviceable parts including cleaning, re-fixing of all serviceable parts and testing etc. complete all as specified and directed by the Engr- in -Charge. | 1 | Job | |
15 | 15 | Supply and fix in replacement of following unserviceable parts suitable for stand by DG Set capacity 125 KVA installed in OT area power house Over Point (a) Fuel Filter Element Pre Make :- Kirlosker /Mico | 1 | Each | |
16 | 16 | (b) Fuel Filter Element micro Make :- Kirlosker /Mico | 1 | Each | |
17 | 17 | (c) Lub Oil Filter Element Make :- Kirlosker /Mico | 1 | Each | |
18 | 18 | (d) Oil filter Make :- Kirlosker /Mico | 1 | Each | |
19 | 19 | (e) Air cleaner element inner &outer make Kirloskar/MICO | 1 | Each | |
20 | 20 | (f) Topping up of Coolent Make :-Servo/Castrol | 10 | Ltrs | |
21 | 21 | (g) Rubber Hose pipe | 1 | Each | |
22 | 22 | (h) Flexible fuel pipes | 1 | Each | |
23 | 23 | (i) Fan Belts Make Fenner | 1 | Each | |
24 | 24 | (j) Lub Oil Pipe | 1 | Each | |
25 | 25 | (k) Engine oil Make Servo/Castrol/HP | 20 | Ltrs | |
26 | 26 | (l) Injector pipe | 1 | Nos | |
27 | 27 | (m) Injector over flod pipe. | 1 | Nos | |
28 | 28 | (n) Set of O ring | 2 | Set | |
29 | 29 | (o) CR bearing STD | 1 | Each | |
30 | 30 | (p) Cylinder head gasket | 1 | Each | |
31 | 31 | (q) CR Bush STD | 6 | Each | |
32 | 32 | DG SET OF CAPACITY 63 KVA (Kirloskar)\nM&L for Servicing/overhauling of stand by DG Set capacity 63KVA installed in power house in OT area, segregation of serviceable and unserviceable parts including cleaning, re-fixing of all serviceable parts and testing etc. complete all as specified and directed by the Engr- in -Charge. | 2 | Each Job | |
33 | 33 | Supply and fix in replacement of following unserviceable parts suitable for stand by DG Set capacity 63 KVA installed in power house in OT location .against Sch item No. 1 above :- (a) Fuel Filter Element Pre Make :- Kirlosker /Mico | 2 | Each | |
34 | 34 | (b) Fuel Filter Element micro Make :- Kirlosker /Mico | 2 | Each | |
35 | 35 | (c) Lub Oil Filter Element Make :- Kirlosker /Mico | 2 | Each | |
36 | 36 | (d) Oil filter Make :- Kirlosker /Mico | 2 | Each | |
37 | 37 | (e) Air cleaner element inner &outer make Kirloskar/MICO | 2 | Set | |
38 | 38 | (f) Flexible fuel pipes | 2 | Set | |
39 | 39 | (g) Engine oil (20W 40) Make Servo/Castrol/HP | 40 | Ltrs | |
40 | 40 | (h) Mobil Pressure Pipe | 2 | Each | |
41 | 41 | (i) Rubber Hose Pipes | 2 | Each | |
42 | 42 | (j) fan Belt Make :- Fenner | 2 | Each | |
43 | 43 | (k) Topping up of coolant Make :- Servo/castrol | 40 | Ltrs | |
44 | 44 | (l) Hose for air cleaner | 2 | Each | |
45 | 45 | Repair of battery chargnig set capacity 12V/24V 180 AH and carring out following repair work and it serviceable with changing of minor part as required :- (a) Rewinding of rectifier Transformer of battery charging set cap. 12/ 24Volt single phase 230 volt including varnishing -01 Each job (b) Toggle switch for volt/ Amp meter- 02 Nos (c) Volt meter and Amp meter as suitable for battery charger-01 Nos (d) S&F Fuses suitable for battery chargerf 12/24 Volt-01 Each | 2 | Each | |
46 | 46 | M&L for taking out self starter, of stand by DG Set cap. 63 KVA opening and segregating serviceable & unserviceable parts,cleaning the serviceable parts for re-use, greasing,Oiling re-assembling the self starter and replacement of following unserviceable parts :-\n(a) Carbon bushes\n(b) Brass plunger \n(c) Solenoid switch \n(d) Body brass nut (e) Funnel coil | 2 | Job | |
47 | 47 | All as per item no. 46 above but stand by DG Set cap. 125 KVA | 2 | Each Job | |
48 | 48 | All as per item no. 46 above but stand by DG Set cap. 160 KVA | 1 | Each Job | |
49 | 49 | S&F in replacement of Battary terminal Lead of copper of existing size having on end battery terminal of brass and thimble on other ends 1.5 mtrs long complete all as directed by Engr- in- Charge. | 4 | Nos | |
50 | 50 | Supply only Distilled water for all DG Sets as directed by Engr-in-charge. | 150 | Ltrs | |
51 | 51 | Cleaning of radiator of DG set of any capacity by gauging using Kerosene oil , radiator clening solution, with hydrolic pressure of pump and brush and necessary soldering work as reqd as spcified by Engr- in -Charge | 3 | Nos | |
52 | 52 | Dismantling of alternator 63 KVA its segregating serviceable and unserviceable parts, repplacement of following worn out parts :- (a) Carban bushes (b) Rectifier bolt bearing (c) Bearing (d) Rewinding of alternator with suitable size of copper wire, varnishing papering (e) Cable connector with suitable size of alluminium lugs. | 1 | Each Job | |
53 | 53 | All as per item no. 52 above but stand by DG Set cap. 125 KVA | 1 | Each Job | |
54 | 54 | Supply and replacement Hand rotated pump of required capacity or taking out DHPP from barrel as directed by Engr-in-charge | 2 | Each | |
55 | 55 | DG SET OF CAPACITY 66.6 KVA (Greaves Cotton) Striping out/dismantling the engine assembly of DG Set capacity 66.6KVA complete for carrying out necessary segregation of serviceable and U/S spare parts all as directed and specified by Engr-in-Charge for carrying out overhauling , replacement of U/S spare with new one at power house area. reinstallation/commissioning /testing/connection of DG set panel complete Note :-cost of new spare parts will be measured and paid for separately under relevant items | 1 | Each Job | |
56 | 56 | (a) Connecting Rod assy | 6 | Each | |
57 | 57 | (b) Cylinder liner | 6 | Each | |
58 | 58 | (c) Piston complete | 6 | Each | |
59 | 59 | (d)Set of joint | 6 | Set | |
60 | 60 | (e) Set of O ring | 1 | Set | |
61 | 61 | (f) Cylinder head gasket | 2 | Each | |
62 | 62 | (g) valve pair | 6 | Each | |
63 | 63 | (h) valve Guide | 6 | Each | |
64 | 64 | (i) valve seat inlet | 6 | Each | |
65 | 65 | (j) valve colet | 6 | Each | |
66 | 66 | (k) valve Tappet | 6 | Each | |
67 | 67 | (l) lub oil pump assly | 1 | Each | |
68 | 68 | (m) Main bearing STD | 1 | Each | |
69 | 69 | (n) CR bearing STD | 1 | Each | |
70 | 70 | (o) CR Bush STD | 1 | Each | |
71 | 71 | (p) Cam bush STD | 1 | Each | |
72 | 72 | (q) Trust washer STD | 1 | Each | |
73 | 73 | (r) Expension Valve | 1 | Each | |
74 | 74 | (s) Stop Solenoidd Assly | 1 | Each | |
75 | 75 | (t) Tharmostate Element | 1 | Each | |
76 | 76 | (u) Srarter Ring | 1 | Each | |
77 | 77 | (v) Water pump Assly | 1 | Each | |
78 | 78 | (w) Radiator Fan | 1 | Each | |
79 | 79 | (x) Lub oil Pipe | 1 | Each | |
80 | 80 | (y) L.O.P. Guage | 1 | Each | |
81 | 81 | (z) Elect WT Guage 12 V | 1 | Each | |
82 | 82 | (aa) Sensor Unit | 1 | Each | |
83 | 83 | (ab) Benjo Bolt 19" | 8 | Each | |
84 | 84 | (ac) Hose for air cleaner | 1 | Each | |
85 | 85 | (ad) Lub Oil Drain Pipe | 1 | Each | |
86 | 86 | (ae) Fuel Filter Element Pre | 1 | Each | |
87 | 87 | (af) Fuel Filter Element micro | 1 | Each | |
88 | 88 | (ag) Lub Oil Filter Element | 1 | Each | |
89 | 89 | (ah) Cogged V Belt BX51 | 2 | Each | |
90 | 90 | (ai) Replacement of Oil filter Make :Kirloskar/MICO | 2 | Each | |
91 | 91 | (aj) Replacement of Air cleaner element inner &outer make: Kirloskar/MICO | 1 | Set | |
92 | 92 | (ak) Replacement of Rubber Hose pipe | 1 | Set | |
93 | 93 | (al) Replacement of Flexible fuel pipes | 1 | Set | |
94 | 94 | (am) Replacement of Fan Belts Make: Fenner or equilent | 1 | Set | |
95 | 95 | (an) Replacement of Flexible coupling Make: kirloskar | 1 | Each | |
96 | 96 | (ao) Replacement of Engine oil Make: Servo/Castrol/HP | 20 | Ltrs | |
97 | 97 | DG SET OF CAPACITY 125 KVA (Kirloskar) Striping out/dismantling the engine assembly of DG Set capacity 125KVA complete for carrying out necessary segregation of serviceable and U/S spare parts all as directed and specified by Engr-in-Charge for carrying out overhauling , replacement of U/S spare with new one at power house area. reinstallation/commissioning /testing/connection of DG set panel complete Note :-cost of new spare parts will be measured and paid for separately under relevant items | 1 | Each Job | |
98 | 98 | (a) Connecting Rod assy | 6 | Each | |
99 | 99 | (b) Cylinder liner | 6 | Each | |
100 | 100 | (c) Piston complete | 6 | Each | |
101 | 101 | (d)Set of joint | 6 | Set | |
102 | 102 | (e) Set of O ring | 1 | Set | |
103 | 103 | (f) Cylinder head gasket | 2 | Each | |
104 | 104 | (g) valve pair | 6 | Each | |
105 | 105 | (h) valve Guide | 6 | Each | |
106 | 106 | (i) valve seat inlet | 6 | Each | |
107 | 107 | (j) valve colet | 6 | Each | |
108 | 108 | (k) valve Tappet | 6 | Each | |
109 | 109 | (l) lub oil pump assly | 1 | Each | |
110 | 110 | (m) Main bearing STD | 1 | Each | |
111 | 111 | (n) CR bearing STD | 1 | Each | |
112 | 112 | (o) CR Bush STD | 1 | Each | |
113 | 113 | (p) Cam bush STD | 1 | Each | |
114 | 114 | (q) Trust washer STD | 1 | Each | |
115 | 115 | (r) Expension Valve | 1 | Each | |
116 | 116 | (s) Stop Solenoidd Assly | 1 | Each | |
117 | 117 | (t) Tharmostate Element | 1 | Each | |
118 | 118 | (u) Srarter Ring | 1 | Each | |
119 | 119 | (v) Water pump Assly | 1 | Each | |
120 | 120 | (w) Radiator Fan | 1 | Each | |
121 | 121 | (x) Lub oil Pipe | 1 | Each | |
122 | 122 | (y) L.O.P. Guage | 1 | Each | |
123 | 123 | (z) Elect WT Guage 12 V | 1 | Each | |
124 | 124 | (aa) Sensor Unit | 1 | Each | |
125 | 125 | (ab) Benjo Bolt 19" | 8 | Each | |
126 | 126 | (ac) Hose for air cleaner | 1 | Each | |
127 | 127 | (ad) Lub Oil Drain Pipe | 1 | Each | |
128 | 128 | (ae) Fuel Filter Element Pre | 1 | Each | |
129 | 129 | (af) Fuel Filter Element micro | 1 | Each | |
130 | 130 | (ag) Lub Oil Filter Element | 1 | Each | |
131 | 131 | (ah) Cogged V Belt BX51 | 2 | Each | |
132 | 132 | (ai) Replacement of Oil filter Make :Kirloskar/MICO | 2 | Each | |
133 | 133 | (aj) Replacement of Air cleaner element inner &outer make: Kirloskar/MICO | 1 | Set | |
134 | 134 | (ak) Replacement of Rubber Hose pipe | 1 | Set | |
135 | 135 | (al) Replacement of Flexible fuel pipes | 1 | Set | |
136 | 136 | (am) Replacement of Fan Belts Make: Fenner or equilent | 1 | Set | |
137 | 137 | (an) Replacement of Flexible coupling Make: kirloskar | 1 | Each | |
138 | 138 | (ao) Replacement of Engine oil Make: Servo/Castrol/HP | 20 | Ltrs | |
139 | 139 | M&L for repair to panel board of 66.5 KVA DG SET by taking down all unserviceable accessories and supply & fix of the following items : -(i) MCCB 4 Pole , 100 Amp, 25 KA ---01 NO (ii) Volt meter 0 - 500 volt 01 NO (iii) Ammeter 0-300 Amp --01 NO (iv) Selector switch -1 No (v) Indicating lamp --01 set ( set of three) (vi)Changeover switch TPN , 320 AMPS -01 | 1 | Each Job | |
140 | 140 | Supply and Fix Safety control panel unit for 160 KVA DG Set.Make-Kirlosker,model No- KG 545 ESP as directed by Engr-in-charge Note:-The contract sum shall be arrieved at after deducting amount of schedule of credit from the total quated amount. \n | 1 | Each |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail