

Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 13-Jul-202 | Technical Corrigendum | Technical Bid | 20-07-2020 |
Name of Work: DESIGN, FABRICATION, SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF GRID-CONNECTED SOLAR PV POWER PLANT WITH BATTERY BACK UP (HYBRID SYSTEM) UNDER ROOF-TOP NET METERING CAPACITIES ARE 8 KW AT EACH PRIMARY HEALTH CENTER AND TOTAL 272 KW FOR 34 NOS OF PRIMARY HEALTH CENTER IN NAGPUR DISTRICT IN THE STATE OF MAHARASHTRA THROUGH DPC, NAGPUR FUND WITH COMPREHENSIVE MAINTENANCE CONTRACT FOR 5 YEARS | ||||
---|---|---|---|---|
Item Description | Item Code / Make | Quantity | Units | |
1 | DESIGN, FABRICATION, SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF GRID-CONNECTED SOLAR PV POWER PLANT WITH BATTERY BACK UP (HYBRID SYSTEM) UNDER ROOF-TOP NET METERING CAPACITIES ARE 8 KW AT EACH PRIMARY HEALTH CENTER AND TOTAL 272 KW FOR 34 NOS OF PRIMARY HEALTH CENTER IN NAGPUR DISTRICT IN THE STATE OF MAHARASHTRA THROUGH DPC, NAGPUR FUND WITH COMPREHENSIVE MAINTENANCE CONTRACT FOR 5 YEARS | BI01010001010000000000000515BI0100001113 | 272 | KW |
Copyright © 2021 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail