Call Basis Maintenance Of Wac Sac Units At Various Te Bldgs Bts Sites Under Kalyan Ssa Phi Revised
Tender Overview
Project Description
Call Basis Maintenance Of Wac Sac Units At Various Te Bldgs Bts Sites Under Kalyan Ssa Phi Revised , Replacement Of Following Defective/ Faulty/ Worn Out Components By New Components Of 1 . 5Tr / 2Tr Window / Split Ac Units Suitable For Operation On 1Ph 230V Ac Supply I/C Connections , Testing Etc . I/C Credit For Old Material As Reqd . , Starting Capacitor 80-100 Mfd , Running Capacitor 36-50 Mfd , Capacitor For Condenser Fan , Csr ( Complete Starting Running Wiring ) , Contactor Relay For Split Ac Outdoor Unit , Starting Relay , Thermostat , Selector Switch , Blade For W/Split Ac Unit , Blower Assembly For Split Ac Unit , Pcb For Split Ac Indoor/Outdoor Unit Of 1 . 5 Tr , Pcb For Outdoor Unit Of Invertor Type Split Of 1 . 5Tr , Fan Motor For Condenser Unit 1 . 5 / 2 Tr Ac , Fan Motor For Indoor Unit Of 1 . 5Tr Split Ac , 3 Core 2 . 5 Sqmm Unarmoured Flexible Copper Conductor Cable , Replacement Of Following Type New Compressor Of 1 . 5/2 . 0 Tr S/W Ac Unit I/C Connections , Testing Etc . And Credit For Old Compressor As Reqd . , Reciprocating Type , Rotary Type , Replcement Of Condenser Coil For 1 . 5/2 . 0 Tr Split Ac Unit I/C Testing Etc . And Credit For Old Coil As Reqd . , Charging R22 / R134 Gas For Existng Ac Unit For Topping Up Etc . As Reqd . , Complete Gas Charging With R22 / R134 Gas For Existng Ac Unit After Attending Gas Leakage/ Replacement Of Compressor I/C Pressure Testing & Vaccumizing As Reqd . , Wet Servicing Of Window / Split Ac Unit I/C Greasing Of Fan Motor , Replacement Of Bush/Bearing Of Fan / Blower Motor , Cleaning Of Condenser Coil With Caustic Soda , Washing Of Filters I/C Removing And Refixing Ac Unit , Testing Etc . As Required . ( This Item Is To Be Executed When Required Essentially ) , Repairing Of Existing Ac Twin Controller After Replacement Of Reqd . Faulty Items , Testing Etc . As Reqd . , Attending Complaint And Checking Of Faults Of Ac Unit By Skilled Technician , Rectification Of Minor Faults/Wiring Etc . As Reqd For The Following Distance Of One Side From Sub Divisional Office . This Item Shall Be Paid Once In 3 Months Period . Any Subsequent Visit Required Shall Be Borne By The Firm Within Stipulated Period Of 3 Months . , Upto 50 Kms , Above 50 To 100 Kms , Above 100 To 150 Kms , Dismantling & Shifting Of Existing Indoor & Outdoor Unit From One Site & Itc At Another Site & Dismantling Existing/ Faulty Unit & Keeping It To The Location As Directed By Engineer-In-Charge Etc . Complete Testing , Connections Complete As Reqd . ( Note: Transportation Charges Shall Be Paid Extra )
BOQ
| Name of work : Call basis maintenance of WAC, SAC units at various TE Bldgs/ BTS sites under Kalyan SSA. (Ph-I) (Revised) | |||||
|---|---|---|---|---|---|
| Sl.No. | Item Description | Item Code / Make | Quantity | Units | |
| 1 | 1 | Replacement of following defective/ faulty/ worn out components by new components of 1.5TR / 2TR Window / Split AC units suitable for operation on 1ph 230V AC supply i/c connections, testing etc. i/c credit for old material as reqd. | BI01010001010000000000000515BI0100001110 | ||
| 2 | 2 | Starting Capacitor 80-100 mfd | BI01010001010000000000000515BI0100001111 | 10 | nos |
| 3 | 3 | Running capacitor 36-50 mfd | BI01010001010000000000000515BI0100001112 | 10 | nos |
| 4 | 4 | Capacitor for Condenser Fan | BI01010001010000000000000515BI0100001113 | 10 | nos |
| 5 | 5 | CSR (Complete Starting Running Wiring) | BI01010001010000000000000515BI0100001114 | 5 | jobs |
| 6 | 6 | Contactor relay for Split AC outdoor unit | BI01010001010000000000000515BI0100001115 | 5 | nos |
| 7 | 7 | Starting Relay | BI01010001010000000000000515BI0100001116 | 5 | nos |
| 8 | 8 | Thermostat | BI01010001010000000000000515BI0100001117 | 10 | nos |
| 9 | 9 | Selector Switch | BI01010001010000000000000515BI0100001118 | 5 | nos |
| 10 | 10 | Blade for W/Split AC unit | BI01010001010000000000000515BI0100001119 | 10 | set |
| 11 | 11 | Blower Assembly for Split AC unit | BI01010001010000000000000515BI0100001120 | 2 | nos |
| 12 | 12 | PCB for Split AC indoor/outdoor unit of 1.5 TR | BI01010001010000000000000515BI0100001121 | 5 | nos |
| 13 | 13 | PCB for outdoor unit of Invertor type Split of 1.5TR | BI01010001010000000000000515BI0100001122 | 5 | nos |
| 14 | 14 | Fan motor for Condenser unit 1.5 / 2 TR AC | BI01010001010000000000000515BI0100001123 | 10 | nos |
| 15 | 15 | Fan Motor for Indoor unit of 1.5TR Split AC | BI01010001010000000000000515BI0100001124 | 5 | nos |
| 16 | 16 | 3 core 2.5 Sqmm unarmoured flexible Copper conductor cable | BI01010001010000000000000515BI0100001125 | 20 | mtr |
| 17 | 17 | Replacement of following type new Compressor of 1.5/2.0 TR S/W AC unit i/c connections, testing etc. and credit for old compressor as reqd. | BI01010001010000000000000515BI0100001126 | ||
| 18 | 18 | Reciprocating type | BI01010001010000000000000515BI0100001127 | 2 | jobs |
| 19 | 19 | Rotary type | BI01010001010000000000000515BI0100001128 | 2 | jobs |
| 20 | 20 | Replcement of Condenser coil for 1.5/2.0 TR Split AC unit i/c testing etc. and credit for old coil as reqd. | BI01010001010000000000000515BI0100001129 | 1 | jobs |
| 21 | 21 | Charging R22 / R134 gas for existng AC unit for topping up etc. as reqd. | BI01010001010000000000000515BI0100001130 | 10 | jobs |
| 22 | 22 | Complete gas charging with R22 / R134 gas for existng AC unit after attending gas leakage/ replacement of compressor i/c pressure testing & vaccumizing as reqd. | BI01010001010000000000000515BI0100001131 | 5 | jobs |
| 23 | 23 | Wet servicing of Window / Split AC unit i/c greasing of Fan motor, replacement of bush/bearing of fan / blower Motor, cleaning of condenser coil with caustic soda, washing of filters i/c removing and refixing AC unit, testing etc. as required. \n(This item is to be executed when required essentially) | BI01010001010000000000000515BI0100001132 | 125 | jobs |
| 24 | 24 | Repairing of existing AC twin Controller after replacement of reqd. faulty items, testing etc. as reqd. | BI01010001010000000000000515BI0100001133 | 5 | jobs |
| 25 | 25 | Attending complaint and checking of faults of AC unit by skilled technician, rectification of minor faults/wiring etc. as reqd for the following distance of one side from Sub Divisional Office. This item shall be paid once in 3 months period. Any subsequent visit required shall be borne by the firm within stipulated period of 3 months. | BI01010001010000000000000515BI0100001134 | ||
| 26 | 26 | Upto 50 kms | BI01010001010000000000000515BI0100001135 | 40 | jobs |
| 27 | 27 | Above 50 to 100 kms | BI01010001010000000000000515BI0100001136 | 30 | jobs |
| 28 | 28 | Above 100 to 150 kms | BI01010001010000000000000515BI0100001137 | 20 | jobs |
| 29 | 29 | Dismantling & shifting of existing indoor & outdoor unit from one site & ITC at another site & dismantling existing/ faulty unit & keeping it to the location as directed by engineer-in-charge etc. complete testing, connections complete as reqd.\n (Note: Transportation charges shall be paid extra) | BI01010001010000000000000515BI0100001138 | 8 | jobs |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender