Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited-UPRVUNL has published Round The Clock Operation Routine And Preventive Mechanical Maintenance And Breakdown Mechanical Maintenance Of Ash Handling Plant Of Unit No 08 And 09 Dtps Htps Kasimpur For A Period Of One Year. Submission Date for this Tender is 29-08-2020. Mechanical engineering Service Tenders in Ash Handling Plant DTPS Uttar Pradesh. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 19-Aug-2020 | Date Extension2 | Date | 29-08-2020 |
Name of Work: Round the clock Operation, Routine & Preventive mechanical maintenance and Breakdown mechanical maintenance of Ash Handling Plant of Unit No. 08 & 09, ‘D’TPS, HTPS, Kasimpur for a period of one year. | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1 | Round the clock Operation and Routine & Preventive mechanical maintenance of Ash handling Plant of Unit No.8 (250MW) or Unit No.9 (250MW). | item 1 | 90 | Jobs |
2 | 2 | Round the clock Operation and Routine & Preventive mechanical maintenance of Ash handling Plant of Unit No.8 (250MW) & Unit No. 9 (250MW). | item 2 | 1005 | Jobs |
3 | 3 | Break down maintenance of Ash Slurry Pumps, Ash Water pumps, Sealing Water Pumps, Drain Pumps etc as per details giving below:- | item 3 | ||
4 | 3.01 | Dismantling & shifting of Ash Slurry Pump from its foundation at (-) 8.5 Mtr. to ground level (Zero meter). | item 4 | 4 | No. |
5 | 3.02 | Shifting of Overhauled/New Pump from ground Level to the foundation of Pump at (-) 8.5 Mtr. | item 5 | 4 | No. |
6 | 3.03 | Complete overhauling of ‘SAM’ make Ash Slurry Pumps | item 6 | 8 | No. |
7 | 3.04 | Dismantling &Shifting of BALP/FWP/FAHP/BAHP/ASP from its foundation to zero meter | item 7 | 6 | No. |
8 | 3.05 | Shifting of BALP/FWP/FAHP/BAHP/ASP from zero meter to the foundation of the pump. | item 8 | 6 | No. |
9 | 3.06 | Overhauling of Bottom Ash Low Pressure Pump (BALP) | item 9 | 2 | No. |
10 | 3.07 | Overhauling of Flushing Water Pump (FWP) | item 10 | 1 | No. |
11 | 3.08 | Overhauling of Bottom Ash High Pressure Pump (BAHP) | item 11 | 2 | No. |
12 | 3.09 | Overhauling of Fly Ash High Pressure Pump (FAHP) | item 12 | 3 | No. |
13 | 3.1 | Overhauling of Seal Water Pump | item 13 | 2 | No. |
14 | 3.11 | Overhauling of Drain Sump Pump | item 14 | 2 | No. |
15 | 3.12 | Overhauling of Bottom Ash Overflow Pump (BAOFP) | item 15 | 1 | No. |
16 | 3.13 | Alignment of Ash Slurry Pump | item 16 | 8 | No. |
17 | 3.14 | Alignment of Bottom Ash Overflow Pump | item 17 | 1 | No. |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail