Work Contract For Bifurication Of North Thittan Ss Iv 250 Kva And North Thittankulam Ss I 100 Kva At 11Kv North Thittankulam Feeder
Tender Value
2 Lakhs
Estimated cost
Bid Submission
08 Jul 2020
0 days left
EMD
2000
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Kovilpatti → Tamil Nadu
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
WORK CONTRACT FOR BIFURICATION OF NORTH THITTAN SS IV 250 KVA AND NORTH THITTANKULAM SS I 100 KVA AT 11KV NORTH THITTANKULAM FEEDER
BOQ
| WORK CONTRACT FOR BIFURICATION OF NORTH THITTAN SS IV 250 KVA AND NORTH THITTANKULAM SS I 100 KVA AT 11KV NORTH THITTANKULAM FEEDER | |||||
|---|---|---|---|---|---|
| Sl.No. | Item Description | Item Code / Make | Quantity | Units | |
| 1 | 1 | Excavation of Pole pit for 8 Mtr PSC Pole (Medium rocky ground) | item 1 | 1 | E |
| 2 | 2 | Erection of 8 Mtr PSC Pole (Medium rocky ground) | item 2 | 1 | E |
| 3 | 3 | Loading and un loading of 8 Mtr PSC Pole | item 3 | 1 | E |
| 4 | 4 | Transporting of 8 mtr poles from road side to Pole Pit. | item 4 | 1 | E |
| 5 | 5 | Excavation of pole pit 9 Mtr PSC Pole (Medium rocky ground) | item 5 | 9 | E |
| 6 | 6 | Erection of 9 Mtr PSC Pole (Medium rocky ground) | item 6 | 9 | E |
| 7 | 7 | Loading and un loading of 9 Mtr PSC Pole | item 7 | 9 | E |
| 8 | 8 | Transporting of 9 mtr poles from road side to Pole Pit. | item 8 | 9 | E |
| 9 | 9 | Erection of Single pole structure with open type arrangement , Bus bar arrangement and erection of DT | item 9 | 6 | E |
| 10 | 10 | Loading and Unloading of Transformer | item 10 | 6 | E |
| 11 | 11 | Transporting of 16 KVA Distribution Transformer | item 11 | 2 | E |
| 12 | 12 | Erection of 16 KVA Distribution Transformer | item 12 | 1 | E |
| 13 | 13 | Transporting of 25 KVA Distribution Transformer | item 13 | 1 | E |
| 14 | 14 | Erection of 25 KVA Distribution Transformer | item 14 | 1 | E |
| 15 | 15 | Transporting of 63 KVA Distribution Transformer | item 15 | 1 | E |
| 16 | 16 | Erection of 63 KVA Distribution Transformer | item 16 | 9 | E |
| 17 | 17 | Transporting of 16 KVA Distribution Transformer | item 17 | 9 | E |
| 18 | 18 | Erection of 16 KVA Distribution Transformer | item 18 | 9 | E |
| 19 | 19 | Transporting of 100 KVA Distribution Transformer | item 19 | 9 | E |
| 20 | 20 | Erection of 100 KVA Distribution Transformer | item 20 | 6 | E |
| 21 | 21 | Erection of Tapping channel X arm | item 21 | 6 | E |
| 22 | 22 | Erection of 3'6\" V X arm | item 22 | 2 | E |
| 23 | 23 | Erection of Guarding X arm | item 23 | 5 | E |
| 24 | 24 | Erection of 3 Ph X arm | item 24 | 13 | E |
| 25 | 25 | Erection of S Ph X arm | item 25 | 10 | E |
| 26 | 26 | Erection of HT TI fitting | item 26 | 13 | E |
| 27 | 27 | Fixing of Inulator LT | item 27 | 6 | E |
| 28 | 28 | Fixing Shackle LT | item 28 | 27 | E |
| 29 | 29 | Fixing of Inulator HT | item 29 | 48 | E |
| 30 | 30 | Fixing of Disc HT | item 30 | 45 | E |
| 31 | 31 | HT/LT line stringing with 7/2.50 AAAC | item 31 | 55 | Run |
| 32 | 32 | Erection of stay set | item 32 | 1 | Set |
| 33 | 33 | Painting of structure | item 33 | 6 | E |
| 34 | 34 | Pole Earthing | item 34 | 10 | E |
| 35 | 35 | Pole concreating | item 35 | 10 | E |
| 36 | 36 | Erection of Strret light switch box | item 36 | 4 | E |
| 37 | 37 | Altration of clamps | item 37 | 29 | E |
| 38 | 38 | Making slotted holes | item 38 | 30 | E |
| 39 | 39 | Transporting of materials from section office to work spot. | item 39 | 4 | Trip |
| 40 | 40 | DT Metering with whole current meter. | item 40 | 7 | E |
| 41 | 41 | DT Metering with integareted meter. | item 41 | 1 | E |
| 42 | 42 | Dismandling of 8 mtr PSC Pole | item 42 | 3 | E |
| 43 | 43 | Dismandling of 7.5 mtr RCC Pole | item 43 | 5 | E |
| 44 | 44 | Dismandling of 3 Ph X arm | item 44 | 23 | E |
| 45 | 45 | Removal of Inulator LT | item 45 | 21 | E |
| 46 | 46 | Removal Shackle LT | item 46 | 42 | E |
| 47 | 47 | Grill seperation of poles including Trasporting | item 47 | 8 | E |
| 48 | 48 | Dismandling of 250 KVA Distribution Transformer | item 48 | 1 | E |
| 49 | 49 | Dismandling of 100 KVA Distribution Transformer | item 49 | 1 | E |
| 50 | 50 | Dismandling of 7/2.59 ACSR | item 50 | 72 | Run |
| 51 | 51 | Loading and unloading of released Transformer. | item 51 | 2 | E |
AI Tender Summary
Tender Timeline
Jun 20, 2020
11:30 IST
Tender Published
Tender notice published.
CompletedJul 08, 2020
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
CompletedJul 09, 2020
Bid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender