| 1 | 1 | Dismantlling and removing cement concrete including stacking the useful materials for re-use and removing the debries within 50mtr lead complete as per the direction of Engineer-in-Charge | | 125.6 | Cum |
|---|
| 2 | 2 | Dismantlling and removing Cement Concrete including stacking the useful materials for re-use and removing the debries within 50mtr lead complete as per the direction of Engineer-in-Charge.. | | 37.68 | Cum |
|---|
| 3 | 3 | Earth work in excavation in all kinds of soil for foundation within initial lead of 50m and initial lift of 1.5m including rough dressing and levelling the bed as per specification approved by the department and direction of Engineer-in-charge | | 259.98 | Cum |
|---|
| 4 | 4 | Conveyance of excavated materials such as rough stone, metal, khoa ,chips ,sand, surkhi quarry rubbish, moorum, laterite stone, washed gravel ,flyash and earth away from the work site by mechanical means including loading and unloading and depositing the same within 5km truck lead as per the direction of Engineer-in-chrage | | 380.93 | Cum |
|---|
| 5 | 5 | Filling in foundation with sand well watered and rammed with cost,coveyance ,royalty,taxes,labour etc complete as per direction of the Engineer-in-charge | | 52 | Cum |
|---|
| 6 | 6 | Cement Concrete (1:3:6) with 4cm size hard granite crusher broken metal including all cost ,conveyance,royalty& taxes etc complete of all materials to work site as per specifcation approved by the department & direction of Engineer-in-charge | | 52 | Cum |
|---|
| 7 | 7 | Supplying,cutting,binding,tying thegrills and placing in position of uncoated HYSD bar reinforcement for RCC work including cost,carraige,royalty and taxes of all materials,labour and cost of binding wire 18 to 20 gauges,cess etc complete as per drawing and technical specification with all cost and conveyance etc. complete as per the direction of Engineer-in-Charge. | | 166.39 | Qntl. |
|---|
| 8 | 8 | Rigid smooth centering and shuttering including false work and removing the same after casting etc complete | | 1863.19 | sqm |
|---|
| 9 | 9 | RCC M-25 with 20mm size down graded crusher broken chips including all cost,conveyance,royalty& taxes etc complete of all materials,machinaries required to work site as per specification approved by the department & direction of Engineer-in-charge. | | 207.99 | Cum |
|---|
| 10 | 10 | 6mm thick C:P (1:4) to RCC surfaces finished smooth including closed deep chiping and slury treatment. | | 606.62 | sqm |
|---|
| 11 | 11 | Cost of Display Board(LS) | | 1 | LS |
|---|