Provision Of Oxygen Gen Plant For Icu , Ot And Covid 19 Wards And Medical Gas Pipe Line System At Mh Under Ge ( South ) Pathankot, Pathankot-Punjab

Military Engineer Services-MES has published Provision Of Oxygen Gen Plant For Icu , Ot And Covid 19 Wards And Medical Gas Pipe Line System At Mh Under Ge ( South ) Pathankot. Submission Date for this Tender is 11-08-2020. Medical Gas System Tenders in Pathankot Punjab. Bidders can get complete Tender details and download the document.




Tender Notice

24651746
Corrigendum : Provision Of Oxygen Gen Plant For Icu , Ot And Covid 19 Wards And Medical Gas Pipe Line System At Mh Under Ge ( South ) Pathankot
Open Tender
Indian
Punjab
Pathankot
11-08-2020

Tender Details

Provision Of Oxygen Gen Plant For Icu , Ot And Covid 19 Wards And Medical Gas Pipe Line System At Mh Under Ge ( South ) Pathankot

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 25-Jun-2020 Date Corrigendum Date 17-07-2020
2 10-Jul-2020 Date Corrigendum2 Date 24-07-2020
3 17-Jul-2020 Revised BOQ and Amendments To Tender BOQ 24-07-2020
4 18-Jul-2020 Amendments To Tender Other 24-07-2020
5 24-Jul-2020 Bid Auto Extn Corrigendum Bid Auto Extn Corrigendum 31-07-2020
6 25-Jul-2020 Date Corrigendum3 Date 07-08-2020
7 01-Aug-2020 Amendments to tender Other 07-08-2020
8 07-Aug-2020 Date corrigendum Date 11-08-2020

Key Value

Document Fees
INR 1000 /-
EMD
INR 220000.0 /-
Tender Value
INR 1.45 Crore /-

BOQ Items

Name of Work : PROVN OF OXYGEN GEN PLANT FOR ICU, OT AND COVID 19 WARDS AND MEDICAL GAS PIPE LINE SYSTEM AT MH UNDER GE(SOUTH) PATHANKOT
Sl. No. Item Description Item Code / Make Quantity Units
1 1 Supply , installation, commissioning and testing of Fully-Automatic Oxygen Control Panel as per technical specifications, as per approved medical standardards and consisting of following features :-\n(a) Control panel will have two first stage regulators each capable of delivering 100 - 200 psig outlet pressure. It should comply Indian medical standardards and should comply standards: HTM 02-01 /DIN/EN/ISO-7396-1 and should be CE certified body 0482 (b) Both the first stage regulators in the oxygen control panel will have non-halogenated polymer in the high pressure side to ensure that there will be no ignition due to adiabatic compression. (c) 40 micron filter should be provided at the inlet of each high pressure regulators of the oxygen control panel.\n(d) The first stage regulators will be connected to a common second stage regulator which will deliver an outlet pressure of 60 psi g.(e) The first two regulators meant for first stage will be capable of switchover system incorporated from “RUNNING” to “RESERVE” bank due to differential pressure. 1 Each\nJob
2 1.01 (f) The control panel will provide for two individual content contact pressure gauges to indicate the cylinder pressure in the two wings of the manifold and common pressure gauge to indicate the delivery / line pressure.(g) The control panel will have built in audio-visual signal lamp indications for bank Changeover.(h) The control panel will be covered with aesthetically suitable cover for safe operation indicating the respective services. (j) Control panel will have built in transformer to ensure safe operation by low voltage and all protections of surge, overload and earthfault. The Control panel shall include two pressure relief valves, one high pressure approx 200 psi and one low pressure approx 75 psi and with a flow capacity of 1000 LPM\nMake: Greggersen / Tedisel Medical/Trumph/WTK or equivalent approved make of HQ CEWC
3 2 Supply , installation, commissioning and testing of Oxygen Manifold: Main confirming to ISO standards with Middle Frames 2 Banks x 8 Cylinder per Each bank Oxygen Manifold (without cylinders) , suitable to withstand a pressure of 145 Kg/cm2, along with high-pressure copper annealed tail pipes with end Brass adapter suitable for Oxygen Cylinders and manifold.Top frame comprising of high pressure copper pipes of size 1/2” I.D. x 15swg with high pressure brass fittings made of high tensile brass and connections through non- return valves; high pressure copper tail pipes, made of high pressure copper pipe of size 1/4” I.D. x 15 swg. The design of middle and bottom frames should be provided to fit both round and flat bottom cylinders safely. The manifold shall be tested (hydraulically) at 3500 psig and necessary test certificates accompany along with the supply. Only Non Halogenated Polymer materials are to be used in the Non Return Valves supplied along with the manifold. \nMake: Oxicareengineers/ Globalmedlife Solution/ Lifeline Medisol/ Aktiv or equivalent approved make of HQ CEWC\n 1 Each\nSet
4 3 Supply , installation, commissioning and testing of Oxygen Manifold: Emergency confirming to ISO standards with Middle Frames 2 Banks x 4 Cylinders per Bank Oxygen Manifold (without cylinders) , suitable to withstand a pressure of 145 Kg/cm2, along with high-pressure copper annealed tail pipes with end Brass adapter suitable for Oxygen Cylinders and manifold.Top frame comprising of high pressure copper pipes of size 1/2” I.D. x 15swg with high pressure brass fittings made of high tensile brass and connections through non- return valves; high pressure copper tail pipes, made of high pressure copper pipe of size 1/4” I.D. x 15 swg. The design of middle and bottom frames should be provided to fit both round and flat bottom cylinders safely. The manifold shall be tested (hydraulically) at 3500 psig and necessary test certificates accompany along with the supply. Only Non Halogenated Polymer materials are to be used in the Non Return Valves supplied along with the manifold. 1 Each\nSet
5 3.01 Notes for item No.2 and 3 :(a) The cylinders required will be measured and paid separately.(b) The rate inclusive for the provn of cylinder brackets and fixing chains which will be zinc plated for cylinder placing arrangement. (c) The manifold should be tested (hydraulically) at 250kg / sq cm and the rate inclusive for the same.Each header bar shall be with pigtail connections to suit cylinder valves as per IS:3224.\n(d) The copper tail pipes are fitted to the individual non return valves of the cylinder manifold for easy removal of cylinders without disturbance to system operation and the rate inclusive for the same..\nMake: Oxicareengineers/ Globalmedlife Solution/ Lifeline Medisol/ Aktiv or equivalent approved make of HQ CEWC\n\n\n\n\n
6 4 Supply installation, testing and commissioning of oxygen Back Pressure Compensated flow meter with control range of 0 – 15 lpm (calibration within +/- 10% ) with 250 ml humidifier bottle made of unbreakable polycarbonate material and autoclavable at 121 degree Centigrade temperature.The flow meter shall be strict precision, durability standard and body shall be made of brass chrome plated materials.The flow tube and shroud components shall be made of clear, impact resistant polycarbonate.Flow Tube shall have large and expanded 0 – 5 lpm range for improved readability at low flows with Inlet filter of stainless steel wire mesh to prevent entry of foreign particles.Make: Oxicareengineers/ Globalmedlife Solution/ Lifeline Medisol/ Aktiv or equivalent approved make of HQ CEWC\n 14 Each
7 5 Supply , installation, commissioning and testing of Nitrous Oxide Manifold, confirming to ISO standard with Middle Frames 2 Banks x 1 Cylinder per Bank as primary and 1 Nos of secondary cylinder supplies which will be emergency supply source (without cylinders). Nitrous- Oxide Manifold should be suitable to withstand a pressure of 145 Kg/cm2, along with high-pressure copper annealed tail pipes with end Brass adapter suitable for Nitrous oxide Cylinders and manifold.Top frame comprising of high pressure copper pipe of size 5/8” I.D. x 7/8” OD with high pressure brass fittings made of high tensile brass, NRV and high pressure copper tailpipes made of high pressure copper pipe of size 3/16 inch I.D. x 3/8 inch OD. The manifold will be hydraulically tested to 3500 psi and necessary test certificates accompany along with the supply. . The manifold will be so designed that it shall suit easy cylinder changing and positioning. The system will have non–return valves for easy changing of cylinders without closing the bank. Each header bar shall be with pigtail connections to suit cylinder valves as per IS:3224. 1 Each\nSet
8 5.01 Note: (a) The cylinders required will be measured and paid separately.(b) The rate inclusive for the provn of cylinder brackets and fixing chains which will be zinc plated for cylinder placing arrangement. (c) The manifold should be tested (hydraulically) at 250kg / sq cm and the rate inclusive for the same.\n(d) The copper tail pipes are fitted to the individual non return valves of the cylinder manifold for easy removal of cylinders without disturbance to system operation and the rate inclusive for the same..\nMake: Oxicareengineers/ Globalmedlife Solution/ Lifeline Medisol/ Aktiv or equivalent approved make of HQ CEWC
9 6 Supply, installation, testing and commissioning of Medical Air Plant Reciprocating Type 2000 LPM Duplex System (1 working+1 standby) Including hetles air drier,electrical control panel, reciever tank, pressuer reducing station for Air-4 &SA-7, compressors DUPLEX Air system (1 working+1 standby) type with Compressed air filteration system one set of 4-stage filter as per technical specifications:- (a) The Medical Compressed Air System should consist of 2 nos. Air Compressors with Electric Motor, Electrical Switch Gear and Automatic Control System, Air Receiver, No-heat Air Dryer, Pressure Regulator-cum –filter, interconnecting piping with necessary valves and fittings thereof.(b) Specifications:\nCapacity - 73.3 cfm/2076 LPM piston displacement at 8.5 kg/cm2,Drive Electric Motor -2(two) Nos.(1 working+1 standby) \nCapacity - 10 HP+10HP.Speed -1440 rpm (syn.) Drive - Belt drive ,Electricity supply-440 volt, 50 Hz. 3 phase,Starter -Star/Delta Control & Switchgear/ L & T/BCH/OEM approved with overload protection.\n(c) Air Receiver-500 Ltrs., (d) Air Dryer of suitable capacity (e) Filters - Ultra filters, 1 Each\n
10 6.01 (f) Compressed air filtration system: one set of 4 – stage filter.\nThe filters should be made of die cast aluminums housing \nwith epoxy power paint on the outside and anodized surface \ntreatment inside to prevent corrosion and ensure extra long life.\nThe filters should have maximum contaminant removal efficiency with minimum pressure drop. Total 4-stage of filters should be used (stage 1 & 2 should be installed before the basic cant dryer and balance two stages after it as mentioned below:-\n\n\n
11 6.02 Stage 1 : coalescing filters for general-purpose protection,\n removing liquid water and oil aerosol to 0.1 mg/cum. (0.1 pm) and particles down to 1 micron.\nStage 2 : particular filter for dust protection, removing particles down to 1 micron.\nStage 3 : high efficiency coalescing filters, removing liquid \nwater and oil aerosol to 0.01 mg/cu.m. (0.01 pip) and particles\n down to 0.01 micron.\nStage 4 : active carbon filter for removal of oil vapors and\n hydrocarbon odours with maximum remaining oil content of 0.003 mg/cum. (0.003 pip) should be installed after stage 3 filter.\nThe filters should have following additional features :\nAudible alarm to give warning when dismantling attempted \nunder pressure Sight glass to allow visual check of liquid \ncollection and drain operation.\nMake:Anestaiwata/ Ingersoulrand/Boge/Coaire or equivalent approved make of HQ CEWC
12 7 Supply, installation, testing and commissioning of Medical Vacuum Plant Reciprocating Vacuum 2500 LPM Duplex system (1 working+1 standby) ,with reciever tank 1500 Ltr,bacteria filters, vacuum filters complete all as per technical specifications and as per the following details :- 1 Each\n
13 7.01 (a) Vaccum Pump Single stage, minimum capacity 3141LPM/111 cfm(piston displacement) or 7.5 HP each motor. Each pump should be suited for maximum working pressure of 29 inch mercury (730 mm mercury) Each pump should be fitted with MS channel frame complete having vibration isolators with 3 Nos.silencers at vacuum pump discharge end. The pump should be air cooled.3 sets of isolation valve, on return valve and filter should be provided with pumps the system should be expandable to receive one additional pump in future.\n(b) Drive Assembly :The electrical drive for vacuum pump should consist of suitable TEFC induction motor operating at 1440 RPM and\n connected through a V-belt. The motor shouldbe suited for 415 V +10% 50 HZ.3 Phase AC supply.Capacity : 7.5 HP-2 Nos (1 working+1 standby) , make-Crompton Grease / Kirloskar\n(c) Vacuum Receiver : 1 No vacuum receiver of 1500 liters capacity The reservoir should be fabricated from MS plates as per IS:226 and \nmanufactured as per IS:2825.The reservoir should be supplied with safety valve, pressure gauge and drain valve etc.manufacture’s test certificate to be provided.\n\n
14 7.02 (d) Vacuum Switch :Vacuum switch of 0-760 mm range should be provided, should have both NO/NC contracts and suitable for 230 V 50 Hz AC supply. The vacuum switch should be housed in weather proof casing with 3/8”BSP gas service connection at the bottom of the assembly.\n(e) Vacuum Filter :2 Nos vacuum filters with drain valve. This filter should be non-ferrous and online. The discharge to autosphare should be through micron filter cartridge, and suitable capacity bacteria filter & secretion trap \n(f)The medical vacuum plant shall be CE Marked/ISO comprising of air cooled, oil lubricated rotary vane/reciprocating vacuum pumps to provide a flow rate.\nMake: Anestaiwata/ Ingersoulrand/Boge/Coaire or equivalent approved make of HQ CEWC\n\n
15 8 Supply, installation testing and commissiong of Ward suction unit or Ward Vacuum Unit with above 1000 ml suction collection jar-1 Nos as per specifications mentioned below:- \n(a) The vacuum regulator should have a vacuum gauge with analog display.The scale should be in mbar or mmhg as required by the end user. (b) 1no of Suction Regulator and 1no of 1000 ml polysulfone /polycarbonate collection jar. (c) Suction regulator should be supplied with a safety jar, including and antibacterial filter and an anti-overflow safety device and should have wide membrane continuous suction controller. 14 Each \n
16 8.01 (d) Should have vacuum levels: 0-760 mm of Hg and Should have vacuum gauge fitted with a protective bumper device. (e)   Should have on/off knob allowing for the quick restoration of a readjusted vacuum level. (f)   Must have central adjustment knob with a color coded for 0 to 760 mm of Hg. Should have Polysulfone/polycarbonate 1700cc safety jar, autoclavable at 121º C at 5mins, unbreakable, fitted with an anti-overflow safety device and equipped with a plastic antibacterial filter and should be totally transparent, to ensure perfect sucked liquid visibility. \nMake: Oxicareengineers/ Globalmedlife Solution/ Lifeline Medisol/ Aktiv or equivalent approved make of HQ CEWC\n
17 9 Supply,Instllation testing and commissiong of Copper Piping 28 mm OD x 1.0 mm thick with complete fittings/fixtures as per technical specification and BS: 13348 and as mentioned below:- (a) Installation of piping should be carried out as per approved medical standards with utmost cleanliness. (b) Only pipes, fittings and valves which have been degreased as per approved medical standards should be used . (c) Pipe fixing clamps for upto 28mm diameter. (d) Pipes should be non ferrous suitable for the diameter of the pipe and wherever required rigid metallic hanging or cemented supports to be used. (e) The main lines to the building to be taken overhead through heavy grade metallic poles or GI tubes with inspection points in metallic boxes wherever required . Adequate supports shall be provided while laying pipelines to ensure that the pipes do not sag. 50 RM
18 9.01 Suitable sleeves shall be provided wherever pipes cross through walls / slabs. All pipe clamps shall be non-reactive to copper.(f) All pipe joints should be made using inert gas fluxless brazing method. (g) All joints should be of copper to copper and should be brazed by silver brazing filler material without flux while being brazed joints shall be continuously purged with oil free dry nitrogen to prevent the formation of copper oxide on the inside surface of the joint. (h) All pipes should be installed without springing or forcing. (j) All pipes should be protected against mechanical injury in a manner satisfactory to authorities having jurisdiction.(k) Test: After erection, all the new pipes cleaned or purged with the help of dry nitrogen gas. Complete system should be tested with dry nitrogen at 2 times of working pressure for 24 hours. (l) Painting: All existing and proposed exposed pipes/should be painted with two coats of Synthetic enamel paint & color codification as per IS : 2379 of 1963. and approved medical standards.
19 9.02 (m) All concealed pipes to have gas identification bands / labels at appropriate distance. (n) Similarly all pipes which need embedding in the wall should be tested/painted/labeled and properly insulated. (p) Certification: To be certified that pipes are suitable for the particular service and complete cross connection (anti-confusion) test should be carried out. (q) Distribution piping system: MATERIAL (PIPE): Solid drawn, seamless, deoxidized, non arsenical, half hard, tempered and degreased materials conforming to BS: EN 13348. Copper pipe must have reputed third party inspection certificate (E.g.Lloyd?s or Kite marked or TUV or SGS). Fittings should be made of copper conforming to BS 864 and suitable for a working Pressure of upto 17 bar and especially made forbrazed socket type connections.
20 9.03 All copper pipes should be inspected and certified for medical use before dispatch and the pipe should be delivered plugged or capped at both ends. \nNote: (a) The tenderer shall design & submit complete layout drawings with proper colour code, fittings, fixtures complete for approval of GE or rep of accepting Officer before placing order and the quoted includes for the same.(b) The quoted rate inclusive of all mechanical protections with metallic pipes to pipe weherevr required . Make: Mexflow/Janya/ Metal Gem / Cubex or any other equivalent approved makes of HQ CEWC
21 10 All as per srl item no 9.00 to 9.03 here-in-before but 22mm OD x 1.0mm thick 350 RM
22 11 All as per srl item no 9.00 to 9.03 here-in-before but 15mm OD x 1.0mm thick 450 RM
23 12 All as per srl item no 9.00 to 9.03 here-in-before but 12mm OD x 1.0mm thick 280 RM
24 13 Supply,Installation, testing and commissioning of oxygen Gas outlet points complete with matching probe/adopter with one end suitable for Hose & other end suitable for terminal units complete set for Oxygen, Nitrous Oxide, Air, & Vacuum system as per technical specification confirming to CE certified (CE 0482)/ HTM 02-01/EN/ISO/DIN and as mentioned below:- (a) The outlets shall be modular singles, and shall incorporate nameplate color-coding. The single modular outlets shall be of a design that provides for ganging of rough-in plates in the field to form multiples. (b) The gas services shall be sequentially arranged and located as shown on the plans with a minimum centerline spacing of 5 inches (12.5 cm) between outlets. (c) The outlets shall be capable of supporting dispensing equipment without the use of slide brackets. The medical gas outlets shall be designed so that, once installed, routine service of both the primary and secondary check valves can be accomplished without removing the nameplate or gas specific portions. 14 Each
25 13.01 (d) The primary check valve shall be unitized and of the cartridge type. So that the primary check valve can be removed for service without shutting off the gas supply to the outlet, the secondary check valve shall operate automatically to stop the free flow of the pressure gas. (e) There shall be no secondary check for vacuum or gas evacuation service. Medical gas outlets that require the removal of the nameplate or gas specific components for routine service shall not be acceptable. (f) The outlets shall Conform to CE certified (CE 0482)/ HTM 02-01/EN/ISO/DIN and should meet with the provisions of council Directive of Medical Devices Directive. (g) All outlets are 100% tested for flow and leaks (h) The outlet nameplate shall be permanently color coded with a durable scratch-resistant and protective label. (j) Medical gas outlets shall be cleaned for oxygen service as per Medical Standards, capped and placed in a protective container for shipment. (k) The outlets shall be installed in strict accordance with manufacturer’s instructions, and tested before use in conformance with local and federal codes.\n
26 13.02 (l) Outlets shall be Double Lock Outlet type manufactured with an approx 165 mm length, Copper inlet pipe stub which is silver brazed to the outlet body. Body shall be of one piece brass construction. For positive pressure gas services, the outlet shall be equipped with a primary and secondary check valve and the secondary check valve shall have break safe mechanism and also comply to pressure test standards and rated at minimum 200 psi in the event the primary check valve is removed for maintenance.The outlet assembly should have separate colour coding for each services and will accept only corresponding gas specific adaptors. All outlets shall be cleaned and de-greased for medical gas service, factory assembled and tested.The medical gas outlets should be of quick connecting and wall mounted modular type.\nMake: Greggersen/ Tedisel/Trumph/WTK or equivalent approved make of HQ CEWC.
27 14 All as per srl item no 13.00 to 13.02 here-in-before but Nitrous Oxide outlet 5 Each
28 15 All as per srl item no 13.00 to 13.02 here-in-before but Medical Air 4 Oulet with probe ( Compressed Air ( 4 Bar )) 14 Each
29 16 All as per srl item no 13.00 to 13.02 here-in-before but Vacuum outlet 14 Each
30 17 Supply, Installation, testing and commissioning of Integrated / Combined alarm -valve box as per DIN EN ISO 7396-1 or HTM 02-01 for 3 Gas -O2, air & vaccum. The alarm panel shall be enclosed in a steel decorative frame powder coated duly powder coated and shall be designed to accept an electrical input range of 120-240 volts AC – 50-60 hertz. The source voltage shall be stepped down with a self-contained transformer. The panel shall contain audible and visual alarm indicators with the following features:- 2 Each\nJob
31 17.01 (a) It should be combined with Area Alarm for low space consumption. It should provide a zone isolation facility for use either in an emergency or for maintenance purpose. The Area Valve Service Unit should incorporate a ball valve with NIST connectors either side mounted in a lockable box with emergency access. It should be reliable and easy to operate and must have NIST connectors facilitate easy purge, sample & pressure testing and emergency supply system.
32 17.02 (b) The unit should be pre-piped, wired and tested ready for installation into a finished building. Medical gas/vacuum services should be fixed copper, piped to and from their respective area valve service units. A color coded service identity label should be fitted behind the valve handle. The unit should provide a zone isolation facility, for use either in an emergency or for maintenance purposes. The box shall be made from steel decorative frame powder coated to prevent corrosion . All wetted parts (except seals and gaskets) should be brass or copper. Each unit assembly should be factory tested for gas tightness. Rubber pipe grommets should be provided to ensure any leaking gas does not escape from the unit into a wall cavity. All visible aluminum surfaces should be powder coated.
33 17.03 (c) The valve unit of the compressed gases or vacuum consists of the following components:(i) medical ball-valve DN 20 and pressure gauge per gas type.,(ii) valve group consists of valve block, shut-off valve and visible physical isolation for service., (iii) quick access by special lock and push in window, (iv) diameter connection pipe 22mm available, (v)- emergency supply inlet NIST-Coupling , pressure transmitter for each gas type.The pressure transmitter converts the current pressure to the alarm panel. The alarm panelsystem is programmed to ensure a warning signal in case of any increase or decrease of the pressure.
34 17.04 (d) The valves shall be bronze, ball-type, with Teflon (TFE) seats and seals. All valves shall be dual gauge ported, rated at a working pressure of 600 psi (29 in/Hg vacuum), and shall be operated by a lever-type handle, requiring only a quarter turn from a fully open position to a fully closed position. Valves shall incorporate an adjustable packing and a blow- out proof stem. Only full port valves having flow rates comparable to equivalent size of pipe shall be used. Valves shall be piped from left to right. Valves shall be provided with type K copper tubing extensions to facilitate installation. Valves shall be 3 piece in-line repairable type. Each valve assembly shall be supplied cleaned for oxygen service in accordance with current medical standards. The valve tube ends shall be capped and sealed in a protective container to prevent contamination prior to installation. Gauges shall be 50 mm OD for monitoring pressure and vacuum.
35 17.05 (e) A fully color coded label package shall be supplied with each valve box assembly for application by the installer. The valve box shall be of minimum IP-41 with sheet steel construction powder coated to prevent rust. A single box shall house from one to three valves. Box shall be supplied with a ¾” plaster flange. Valve box assembly shall be supplied with a formed steel decorative frame powder coated which encloses an easily removable flexible window.\nMake: Greggersen /Tedisel Medical/ trumph/WTK or equivalent approved make of HQ CEWC
36 18 Supply, Installation, testing and commissioning of the Master Alarm Panel, which shall be LCD touch screen microprocessor controlled and designed to comply with Complies with HTM 02-01 /EN (ISO-7396-1)/DIN/CE Certified (CE 0482) . The panel shall be 100% digital and shall not require re-calibration. The panel shall be able to interface with building management systems with the use of either an Ethernet Modbus interface or a BacNet interface or RS-485 Transmission. The alarm panel shall be enclosed in a steel box and shall be designed to accept an electrical input range of 120-240 volts AC – 50-60 hertz. 1 Each
37 18.01 The source voltage shall be stepped down with a self-contained transformer. The panel shall contain audible and visual alarm indicators. The audible alarm may be silenced by pressing the alarm silence button, but the visual alarm indicator can only be cancelled by fault correction. The alarm shall detect and filter out transient signals (less than 0.6 seconds). The alarm shall be capable of displaying alarm history for all possible alarm conditions. Each source signal module shall monitor 6 to 8 source signals. \nEach Master Alarm should be modular in design and be fitted with required number of master alarm modules.
38 18.02 The master alarms should be capable to monitor from 10 to 30points in a standard box or 10 to 50 points in a large box. Each point represents an alarm condition that the source equipment might have. When an alarm condition exists, a red light flashes and the audible alarm sounds. If several alarm conditions occur simultaneously, the most recent alarm light should flash, while the other alarm lights should remain lit. When an alarm condition is created, an audible alarm should be actuated. A dry contact module should be available to interface with a building management system. \nThe box material should be of gauge steel of requisite thickness and equipped with mounting brackets that are adjustable . The emissions from alarms should conform to EMC standards.
39 18.03 The Panel shall   Complies with HTM 02-01 /EN (ISO-7396-1)/DIN., High visibility LED/LCD readouts , Adjustable audible alarm repeat (from 1 to 99 minutes) , Can be interfaced with BMS and Should be European CE Certified (CE 0482) and should meet with the provisions of Council Directive 93/42/EEC concerning Medical Devices Directive.\nNote for item No. 17 & 18 :(a) The rate inclusive of all necessary control & power wiring with copper conductor cables with necessary conduits , clamps, cable trays etc and interconnection of master and area valve service unit with inbuilt area alram and all cabling from local alarm panels to master alarm panel complete. \nMake: Greggersen,Germany or Pneumatik Berlin- Germany / MPS/Tri-Tech Medical -USA / Phoenix-Pipeline-UK/Modular-US or equivalent approved make of HQ CEWC
40 19 Supply, Installation, testing and commissioning of 15mm OD MEDICAL LINE VALVE or ISOLATING VALVE as per CE CERTIFIED /HTM -2022/02-01/DIN/ISO/ BS EN 1057 or ball valves as per BS 1057 , rated at 400 psig, as well as full vacuum ( 29.9" Hg). Valves go from full ON to full OFF by turning the vinyl-gripped valve handle 90 degree Locking-type handles may be ordered separately when required. Copper tubing is factory installed to help prevent valve seat damage during soldering. main and riser valves are not required to be installed in a box unless specially noted or required. \nMake: CONEX/ RB/RN/SIM/AUDCO/AKTIV or equivalent approved make of HQ CEWC 2 Each
41 20 All as per srl item no 19.00 here-in-before but 22 mm OD 2 Each
42 21 All as per srl item no 19 here-in-before but 28 mm OD 1 Each
43 22 Supply, installation, testing and commissioning of Horizontal Bed Head Panel with provision of a safe efficient means of delivering services to patients staff in both general and special care applications, it is modular design made of horizontal aluminium extrusions, and ability to house medical gas termainal units ( as per specifications of tender) and electrical socket , smooth curved surfaces, no visible screws and choice of coloured décor stripe, ease of installation via separate rail-bracket or wall mounting plates, easy removal of covers for maintenance and pipeline connection, with integral twin medical rail as part of the modular extrusion design. It has segregation of services i.e. extra low voltage, normal voltage and medical gases , should be maintained throughout . Its aluminium extrusions have a polyester coating finish on all external surfaces. It have provision for nurse call, data or monitoring sockets, should be made at the point of manufacture . 14 Each
44 22.01 It should be supplied duly prepiped , prewired and fully tested or in carcass form. "Each Horizontal Bed Head Panel shall be having a provision of (as per outlet distribution list) - four multipin 5-15 Amps , switch socket outlet combine - it should be minimum1500 mm long."provision for nurse call \n(a) It shall confirm to ISO Standards with the following features\n (i) The headwall system should be constructed of aluminum extrusions joined together to form a carcass to suit the particular application. Unit should be factory assembled for electrical and mechanical components.
45 22.02 (ii) Segregation of services i.e. Low voltage supplies, High Voltage supply and Medical gases should be maintained throughout. Front fascia plate should be removable individually to access for respective service. Bed space management system with optional equipment rail. With all Equipment Rail mount Accessories. All down drops should be installed at one end preferably & Vertical drop installed at one end should be covered with Aluminum boxing with matching color. Entire pipe line should run in continuous horizontal panels with no break for each unit & length as per area where it has to be installed.
46 22.03 (iii) Each bedhead unit shall be supplied with electrical and electrical outlets prefitted, wired and certified. (wired up to the distribution box provided with leakage protection) facility per unit as under: Oxygen – 2 ,Vacuum – 2 ,Medical Air-2 , Holder for vacuum collection jar –1 , Nurse call switch – 1 , Infusion pump mount pole with adapter for mounting at least two infusion pumps , 5 /15 A combined Electrical outlets – 6. , Two spare spaces , Monitor Bracket \n Makes :Oxicareengineers/Globalmedlife solution/Aktiv/ Lifeline Medisol/Tedisel or equivalent approved make of HQ CEWC
47 23 Supply ,installation ,testing and commissioning of medical gas hose assemblies as per standard, High pressure Hose antistatic duly colour coded for oxygen , Nitrous Oxide Compressed air and vacuum as per technical specification,antistatic and colour coded rubber tube – white for oxygen, blue for nitrous oxide, black for compressed air and yellow for vacuum and low pressure tubes for Vacuum application. \nMake: Oxylitre /Oxicareengineers/Globalmedlife solution/ Aktiv/ Lifeline Medisol or equivalent approved make of HQ CEWC 300 RM
48 24 Supply, installation, testing and commissining of Medical Oxygen Generation PSA system 211 LPM @ 4.1 Bar, comprising of oxygen Analyser,Three-way vent valve for off-spec oxygen, 1500Litre Oxygen receiver, , Userfriendly HMI screen showing history and real-timedata, Remote On-line remote monitoring , Bacterial Filter and sterile filtration system post oxygen receiver prior to the hospital line. Piping system fully stainless steel, Air Compressor and Process System with Rotary Screw Compressor 18KW compressor, Refrigeration dryer sized to meet the high ambient temperature which will ensure 3º dewpoint all the time, 1000Litre Air receiver, 4 stage inlet filtration, CarbonTower with sufficient carbon for 4 years, Automatic Changeover System - In the event of PSA pressure going down below 3.7Bar, the automatic changeover valve shall operate and open the backupsystem of hospital complete with Additional Compressor and Dryer with automatic changeover. Make: OXAIR OA 450 MODEL/ equivalent in GCE /Boge/Agastyaaeroworks or equivalent approved make of HQ CEWC 1 Each\nset
49 24.01 Note :(a) The system produces constant 93-94% purity (No ±) which is much above Indian/European Pharmacopeia Regulations.(b) certified as medical equipment by ISO 13485 body.(c) If the purity goes below 90% our system doesn’t permit impure oxygen to go into the system and automatic change over to cylinders should happen.Sensing Oxygen Analysers and sensors to be used to monitor the purity on-line and control the system.(d) The system uses Allen Bradley or equivalent PLC and Weintek or equivalent HMI screen. Dryers, compressors are to be linked with MODBUS and shall be monitored on-line through IOT by OEM service team 24/7 at no extra cost. (e) The rate inclusive of 5 Year Warranty on process valves and 7 Years Warranty on Zeolite complete. (f) Necessary technical specification shall be submitted for approval before placing order.
50 25 Supply only D type jumbo cylinder suitable for Oxygen Cylinder with complete filled gas as per medical standards with 34 Magne steel material of construction, water capacity 46.7 Ltr, working pressure (min) 150 Kg/Sqcm, test pressure (min) 250 Kg/Sqcm at 15 Degree C, wall thickness (minimum) 5.5 mm as per IS complete suitable for manifolds:- Make: Indigenous make approved by Indian medical authorities or equivalent approved make of HQ CEWC Note: Necessary certification of Dept of Explosives GOI (PESO) to be submitted before claiming payment. 20 Each
51 26 Supply only D type jumbo cylinder suitable for Nitrox Cylinder with complete filled gas as per medical standards with 34 Magne steel material of construction, water capacity 46.7 Ltr, working pressure (min) 150 Kg/Sqcm, test pressure (min) 250 Kg/Sqcm at 15 Degree C, wall thickness (minimum) 5.5 mm as per IS complete suitable for manifolds:- Make: Indigenous make approved by Indian medical authorities or equivalent approved make of HQ CEWC Note: Necessary certification of Dept of Explosives GOI (PESO) to be submitted before claiming payment. 3 Each
52 26.01 Notes for Item No.1 to 26: The quoted rate inclusive for the following:-\na) The Contractor shall provide comprehensive on-site warranty (Including All Spares,Accessories and Labour) for a period of 5 years from the date of final acceptance of the complete system after successful and complete installation and commissioning\nwith regular updation of newer technology as and when evolved.\nb) The Contractor shall install, depute trained manpower to maintain manifold and medical gas pipeline system in case of any breakdowns within 24 Hrs.The technical maintenance personnel of the Contractor shall be responsible for supervision and maintenance shall be available to reach the site(s) within 1\nhour's notice.\nc) If the performance of any individual equipment or system is not satisfactory, the same shall be replaced by the supplier free of cost.\n
53 26.02 d) If it is found that to meet the performance criteria, any extra equipment is required the same will be provided free of cost by the supplier.\ne) All faults appearing the their rectification shall be periodically advised to the hospital, the period being not more than a month.\nf) Any lacuna or lacunae noticed in the functioning of the installation as a result of any design feature shall be rectified by the supplier free of cost.\ng) The Contractor shall fully associate the engineers and technicians of the Institute during installation, testing, commissioning, operation and maintenance period.\nh) The Contractor shall train the staff of 167 MH the operation of complete medical gas and oxygen plant system.\nj) The Contractor shall submit MOU with authorised Medical Service experienced in the relevant field for not less than 5 years immediately before placing work order.\nk) All electrical wiring/cables/cable tray/connected distribution system of complete medical gas and oxygen plant system is deemed to be included in the quoted rates.
54 27 M&L for flameproof point wiring with PVC insulated fire retardant stranded copper conductor cable of 1.5 sqmm in steel concealed conduit heavy duty and pressed steel terminal boxes (for mounting switches /sockets/ regulators/ceiling roses etc ) made of not less than 16 gauge MS sheet and 6cm depth covered with and drawing 1.5 sqmm PVC insulated fire retardant stranded copper conductor cable as earth continuity wire in green colour connected to common earth and each terminal box/fitting all as specified and directed by Engr-in-Charge (Phase Neutral and earth wire shall be provided in standard colour code R,Y,B for phase, Black for neutral green for earth wire). Note: The rate inclusive all fittings/accessories required for flame proof wiring.\n 6 Each \nPoint
55 28 M & L for Switch flame proof rotary type with termination box in LM6, 16A, single pole 250V complete all as specified and as directed. 6 Each
56 29 Supply & Fix sheet metal enclosure with DB's ( grouted in walls) double door type for MCB's 04 ways,IP-54,IK-09 with 200 Amps 240 volts rated bus bar all as specified. 2 Each
57 30 M&L 6 to 32 Amps MCB SP ( ISI Marked) 50 C/S 10 KA 'C' sereis complete all as specified. 4 Each
58 31 S&F MCB 6 to 32 Amp SPN 50 C/S 10 KA 'C' sereis complete all as specified all as directed 2 Each
59 32 Supply and Fix LED flameproof tube light fitting 16 watt CMRI certified complete with all accessories prewired and connecting electrically all as required at site or directed. 4 Each
60 33 Supply & Fix flameproof Exhaust fan AC sinlge phase 230/240 volts of size 300 mm sweep complete all as specified and as directed. 2 Each
61 34 Earthing complete with galvanized steel earth plate electrode 60cmx60cmx6 mm thick buried directly in ground (Earth pit not less than 2.25 Mtr deep below normal ground level )with top edge of the plate not less than 1.5 Mtr below normal ground level connecting with galvanized iron GI earth wire 4mm dia by means of bolt nut check nuts and washers of galvanized iron and provision of GI tubing medium grade (ISI marked)of size 15mm for protection of GI earth wire upto test point, 20mm dia GI light grade watering pipe with funnel and wire mesh, RCC pit cover of size 300x300x40mm reinforced with XPM having weight not less than 4Kg/sqmm including 6mm thick MS bar handle made to shape, PCC pit with 1:3:6 type C1 with angle iron frame made of angle iron of size 40x40x4mm, adequate qty of charcoal dust and salt layers all around the earth plate,earth work in any type of soil, all as required at site complete all as specified in plate No 3 of SSR Part-I and all as specified or indicated including testing on completion.NOTE :-Rates inclusive of necessary earth work, PCC pit, RCC cover, funnel with watering pipe, GI earth strip upto 7.5 m long for connecting to test point etc. all as required at site for complete earthing). 2 Each Set
62 35 Supply & fixing 30 KVA servo motor operated automatic voltage stabilizer suitable for operation on 3 phase 4 wire unbalanced load, unbalanced supply having following specifications :- Input 300-420 Volt, AC 3 phase, output-415 volt, AC 3 phase, stability Plus Minus , cooling natural oil cooled with first filling of ISI mark Transformer oil efficiency more than 98 %. The stabilizer shall be provided with following facilities :-\na) Digital Amp Meter and volt meter to indicate input/output voltage and output current in each phase.\nb) Automatic low/high voltage cut off in output.\nc) Overload protection in output.\nd) Input and output terminal \nThe entire assembly shall be housed in a steel sheet enclosure duly painted and mounted on unidirectional castor wheels for easy movement of the equipments 2 Each
63 36 Excavation in trenches in any type of soil n exc 1.5 mtr in width and n. exc 1.5 mtr in depth and getting out all as required for laying of cables,Foundation filling of poles or stays. 154 Cum
64 37 Returning filling, in including spreading ,leveling, watering and well ramming in layers not exc 25 cm each all as required. 86 Cum
65 38 Removing excavated material to a distance not exceeding 50 meters and depositing where directed at a level not exc 1.5 mtr above the starting point. 104 Cum
66 39 M & L for good quality dry sand cushioning to under ground electric cable on layer of 8 cm thick before laying the cable and second layer of 15 cm thick after laying the cable all as specified in clause 19.75 of MES Schedule part-I (2009) Note : Sand shall be fined sand as specifed and punned thickness shall be measured and paid. 26 Cum
67 40 Supply and laying sub class 'B' bricks of old size (230x115x75 mm) or of size locally available , laid along alignment of cable as protection to cable in trenches complete all as specified and directed by Engineer-in-Charge 2600 Each
68 41 Supply, laying and testing of LT UG cable 50 sqmm 3.5 core, XLPE Insulated ,screened, PVC bedded, galvanized steel strip or wire armoured, electric power cables (heavy duty) 1100 Volts grade with stranded aluminium conductor of following sizes complete all as specified and directed. \n 350 RM
69 42 Supply, laying and testing of LT UG cable 16 sqmm 4 core, XLPE Insulated ,screened, PVC bedded, galvanized steel strip or wire armoured, electric power cables (heavy duty) 1100 Volts grade with stranded aluminium conductor of following sizes complete all as specified and directed. \nNote for Srl item no 41 & 42: Earth work ( Excavation, Returning & refilling and removal), sand cushining , cable protection cover, GI protection pipe shall be measured and paid for seperately under respective item of Sch 'A'. 60 RM
70 43 Supply and fix 4 Pole MCCB 100 Amp, 50 Hz, 415 V AC with rupturing capacity 25 KA ,thermal adjustable ,Icu=100%Icu in sheet steel enclosure made out of CRCA sheet duly powder coated of thickness 2mm with IP- 54 and LED indication lamps complete all as specified and directed by Engineer-in-Charge. 2 Each
71 44 Material and labour earthing with steel earth plate electrode of size 60x60cmx6mm thick buried directly in ground to a depth not less than 2.25 mtr deep below normal ground level with top edge of the earth plate not less than 1.5 mtr deep below normal ground level connected to galvanized iron strip of size 32x6mm as earthing lead by means of nuts, bolts and washers of steel after welding of GI strip to earth electrode to the full length of earth plate, GI medium grade pipe 40 mm bore protection pipe upto test point, 20mm dia GI light grade watering pipe with funnel and wire mesh, RCC pit cover of size 300x300x40mm reinforced with XPM having weight not less than 4Kg/sqmm including 6mm thick MS bar handle made to shape, PCC pit with 1:3:6 type C1 with angle iron frame made of angle iron of size 40x40x4mm, adequate qty of charcoal dust and salt layers all around the earth plate, earth work in any type of soil, all as required at site complete all as specified in plate No 3 of SSR Part-I and all as specified or indicated including testing on completion.NOTE :-Rates inclusive of necessary earth work, PCC pit, RCC cover, funnel with watering pipe, GI earth strip upto 7.5 m long for connecting to test point etc. all as required at site for complete earthing). 12 Each Set
72 45 M & L for ABC type fire extinguisher 6 kg hand held ISI Marked complete all as specified and as directed. 5 Each
73 46 Supply, installing, testing and commissioning of LT feeder pillar box factory made oudoor type, double door, slopy canopy, fabricated out of 3.15mm thick CRCA sheet with angle iron base frame made of 50 x50 x 6mm ,45 cm height, dust and vermine proof, suitable for voltage 415 V 3 Phase 4 wire weather proof, with IP-54 protection, with separate hinge door for each compartment for incoming and outgoing MCCB etc with locking arrangement, with back door openable (Screwed), legs grouted in and including PCC 1:2:4 Type B 1 (using 20 mm graded crushed stone aggregate) including painting with two coats of epoxy powder paint over a coat of primer after under going a rigorous metal treatment process involving alkaline degreasing, descaling in dilute sulphuric acid or any other acid and phosphate and with aluminium busbar (TPN), suitable double compression copper cable glands complete in all respect for Dg set main Panel and including provn of the following:- Note: The panel shall be as per CPRI certificate. 2 Each\nJob
74 46.01 i)Aluminium Bus bar 200-A- mounted on porcelain insulator - 01 Set ( Set of 4 Nos) with PVC sleeve insulation\nii) MCCB 4 pole 415 V 3 phase100 Amp, 35 KA (Thermal magnetic release) Ics=100%Icu and adjustable overload setting 80% to100% - 01 Nos (incomming)\niii) MCCB 4 pole 415 V 3 phase 63 Amp, 25 KA(Thermal magnetic release) Ics=100%Icu and adjustable overload setting 80% to100% - 02 Nos (outgoing)\niv) RCBO Double pole 40 Amps Sensitivity 300 mA 240V 50 HZ AC supply - 02 Nos\nv) Digital time switch with current carrying capacity 16 Amps 1 Ph -02 Nos\nvi) Digital voltmeter 96x96mm from 0- 500 volts - 01 Nos \nvii) Digital Amp meter 0-500 Amp with CT's & slection switch - 01 Nos\nviii) RYB LED indicator- one set
75 47 Surface dressing n exc 30cm deep and avaraging 15cm deep and getting out in any type of soil complete all as specified. 240 Sqm
76 48 M&L PCC 1:4:8 type D-2 using 40mm graded crushed stone aggregate as in foundation filling and mass concrete complete all as specified. 4.75 Cum
77 49 M & L for reinforced cement concrete M-25(design mix) using 20 mm graded crushed stone aggregate in Foundations, including rafts, footings, foundation beams; plinth beams; bases for columns, etc.; basement slabs, under-reamed piles and mass concrete complete all as specified. 14.5 Cum
78 50 M & L for reinforced cement concrete M-25(design mix) using 20 mm graded crushed stone aggregate in columns, pillars, piers, posts and struts complete all as specified. 7 Cum
79 51 M & L for reinforced cement concrete M-25(design mix) using 20 mm graded crushed stone aggregate as in slabs supported on walls, beams and columns in floors, roofs, landings, balconies, canopies, deck slabs and in shelves and the like complete all as specified. 9 Cum
80 52 M & L for reinforced cement concrete M-25(design mix) using 20 mm graded crushed stone aggregate in chajjas complete all as specified. 0.3 Cum
81 53 M & L for reinforced cement concrete M-25(design mix) using 20 mm graded crushed stone aggregate in beams, cantilevers, bressummers, lintels over 1.5m span complete all as specified. 6.5 Cum
82 54 M&L Formwork to sides of concrete foundations, footings, bases of columns, raft and raft beams, sides and soffits (if any) of foundation and plinth beams; and similar work, vertical or to batter rough finished surfaces of concrete flat surface complete all as specified. 62 Sqm
83 55 M&L Formwork to sides of pillars, posts, struts, piers, columns and stanchions rough finished surfaces of concrete square, rectangular or polygonal complete all as specified. 75.5 Sqm
84 56 M&L Formwork to soffits of suspended slabs such as roof slabs, floor slabs, landings and similar work; not exceeding 200mm thick (Horizontal or sloping) rough finished surfaces of concrete flat complete all as specified. 71.5 Sqm
85 57 M&L Formwork to sides and soffits of floor or roof beams, beam haunchings, girders, bressummers, lintels, cantilevers, shelves including supports, overhangs, etc. also splays between floors and beams, etc rough finished surfaces of concrete flat complete all as specified. 34 Sqm
86 58 M&L Formwork to chullah hoods, chajjas, troughs and similar items including edges rough finished surfaces of concrete flat complete all as specified. 2.15 Sqm
87 59 M&L mild steel TMT bars 10mm dia and over cut to length, bent to shape, required including cranking, bending, spirally for hopping for columns, hooking ends and binding with and including mild steel wire (annealed) not less than 0.9mm dia or securing with clips complete all as specified . 5000 Kg
88 60 Mild steel TMT bars 5mm dia and over upto and including 10mm dia in stirrups, spacers and binders, cut to length, bent to shape required, including cranking, bending spirally for hooping for columns, hooking ends and binding with and including mild steel wire (annealed) not less than 0.9mm dia or securing with clips complete all as specified. 650 Kg
89 61 M&L for Brick work with fly ash bricks, straight or curved on plan exc 6 m mean radius built in cement mortar 1: 6 complete all as specified. 30 Cum
90 62 M&L for 15mm thick plaster in cement mortar 1:4 on fair faces of brick work or concrete surfaces finishing the surfaces even and smooth without using extra cement all as specified. 166 Sqm
91 63 M&L rendering 10mm thick on concrete in cement mortar 1:3 in facia or edging of chajjas,ceiling and roof projection making the line in true shape finished even & smooth without using extra cement all as specified. 70 Sqm
92 64 M&L for Rendering 10mm thick in cement mortar 1:6 on fair faces of brick work or concrete surfaces finishing the surfaces even and smooth without using extra cement all as specified. 65 Sqm
93 65 M&L for preparing the new plaster surface and applying three coats of white wash on ceiling all as specified. 70 Sqm
94 66 M&L for two coats of exterior emulsion paint over a coat of primer over prepared surface of wall by applying 1-2 mm thick wall care putty complete all as specified. 166 Sqm
95 67 M&L for two coats of oil bound distemper over a coat of primer over prepared surface of wall by applying 1-2 mm thick wall care putty complete all as specified. 65 Sqm
96 68 M&L 75 mm thick PCC 1:4:8 type D-2 using 40 mm graded crushed stone aggregate as in sub base of floors etc and finishing the surface even and smooth without using extra cement complete all as specified. 120 Sqm
97 69 M&L for 50 mm thick PCC 1:3:6 type C-1 using 20 mm graded crushed stone aggregate (as in plinth protection finished even and fair complete all as specified. 31 Sqm
98 70 M&L providing glazed ceramic coloured tiles in vertical surface 450x300mmx7mm thick, set and jointed in neat cement slurry and pointed in white or coloured cement to match the shade of tile including over 10mm thick rendering in cement mortar 1:4 complete all as specified. 64 Sqm
99 71 M&L Non-skid ceramic colouerd tiles 7 to 8 mm thick (Square/rectangular) area of each tile exceeding 0.18 sqm but not exceeding 0.38 sqm,in floors etc.set and jointed in neat cement slurry and pointed in coloured cement match the coloured tiles over 15mm thick screed bed in cement mortar 1:4 complete all as specified. 36 Sqm
100 72 S&F pressed steel frame for doors made out of MS sheet 1.25mm thick of size 125x60mm for with one or more rebates including necessary fixing lugs, hinges, lock strike plate etc including filling of concrete 1:3:6 type C-1 back of chowkhats complete all as specified. 11 RM
101 73 35mm thick, 2nd class hard wood plain framed, panelled (factory made) shutters (two panels) with lock rail and panel of 9mm BWP commercial ply or 12mm veneered particle board with commercial veneering on both faces. The size of rail and stile as per IS-1003 (Part-I) kiln seasoned and chemically pressure treated, fitted to chowkats all as specified & directed. \n 5.15 Sqm
102 74 S&F steel window/ventilator with tubular frame factory made of size 79mm x 39mm, 16 gauge rectangular tubular frame with side hung shutter with glazing bars 12x3mm flat iron incl projecting type hinges with steel handle and steel peg stay dovetailed or welded incl 2 Nos tower bolts 100mm long and including 10mm square bar grills complete, including two coats of synthetic enamel paint over one coat of red oxide primer all as specified & as shown on drg No CEPZ/TD-245/01 and 246/02 sheet ½ & 2/2. 2 Sqm
103 75 S&F 150mm long aluminium, anodized barrel tower bolts of extruded section ISI marked 4 Each
104 76 S&F 150mm extruded aluminium alloy handle fabricated anodized ISI marked . 8 Each
105 77 S&F 20mm thick cement plaster in cement mortar 1:4 finish fair and even without extra cement to receive water proofing treatment and providing and laying of water proofing treatment roof with APP(Atactic polypropyllene) midified prefabricated five layer 3mm thick water proofing membrane , super thermolay of STP Ltd with non woven polyster mat reinforcement of 160gsm, weight of membrane @ 3.6kg/Sqm over a solvent based bitumen primer , shalitex primer @ 0.3 ltr/sqm by the same manufacturer conforming to IS 3384-1986, The membrane shall be laid using butane torch, The end lap should be 100mm and side lap must be minimum 75mm the membrane shall be terminated shall be overlapped with another membrable (flushing) with an overlap covering upto a distance of 300mm. In case parapet height is less than/up to 500mm. membrane shall be terminated at the top of parapet. All rain water pipe openings shall be suitably sealed with APP membrane all as specified and directed. Note : The rate includes for filling of cracks in existing roof with cement putty using suitable bonding agent(Shalocrate-42) before laying cement plaster and inclusive of scafolding for single or double storey all as directed). 70 Sqm
106 78 Supply only liquid water proofing compound of approved brand. 25 Ltr
107 79 M&L for hard core of gauge n.exc 63 mm, deposited, spread and levelled in layers n.exc 15 cm thick, watered and rammed to a true surfaces complete. 17.34 Cum
108 80 M&L for Sand filling under floors or in foundations including watering and consolidation including Spreading and levelling in layers n exc. 25 cm thick 4 Cum
109 81 M&L for machine pressed glossy finish rubber moulded precast interlocking paver block with grey cement and pigment, factory made, any shape and size as directed (any colour as directed by Engineer in charge), confirming to IS-15658-2006 of 60 mm thickness, made out of M-35 grade of concrete all as specified and directed. 80 Sqm
110 82 M&L for cement concrete in foundations, filling and mass-concrete using type C-2 1:3:6 (40 mm graded crushed stone aggregate ) as a sub base of drain complete all as specified and directed. 2 Cum
111 83 M& L for Cement concrete in surface channels and drains using type B-1 of 1:2:4 (20 mm graded crushed stone aggregate ) complete all as specified and directed. 0.5 Cum
112 84 M&L for providing type B-1 of 1:2:4 ( 20 mm graded crushed stone aggregate ) as copings, kneelers, apex stones, bed plates, kerbs, water troughs and the like including weathering, slightly rounded for chamfered angles and throating and including necessary form work complete all as specified and directed. 0.5 Cum
113 85 M & L extra for forming fair finished drain or channel 30 cm inner girth in cement concrete, using ex- tra cement, including forms, moulds, mi- tred/stopped ends complete all as specified and directed. 14 RM
114 86 M&L for providing pre cast cover slab for drain cover, manholes cover etc using type B-1, 1:2:4 (20 mm graded crushed stone aggregate) set in cement mortar 1:6 complete all as specified and directed. 1 Cum
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail