}

Modification Of Top Crown Of 1400 Mt Horton Spheres For Installation Of Radar Gauge And Temperature Transmitter At Indane Bottling Plant , Budge Budge, LPG Bottling Plant, Budge Budge,Buita, South 24 Pa-West Bengal

Indian Oil Corporation Limited-IOCL has published Modification Of Top Crown Of 1400 Mt Horton Spheres For Installation Of Radar Gauge And Temperature Transmitter At Indane Bottling Plant , Budge Budge. Submission Date for this Tender is 08-07-2020. Temperature Transmitters Tenders in LPG Bottling Plant, Budge Budge,Buita, South 24 Pa West Bengal. Bidders can get complete Tender details and download the document.




Tender Notice

24648364
Modification Of Top Crown Of 1400 Mt Horton Spheres For Installation Of Radar Gauge And Temperature Transmitter At Indane Bottling Plant , Budge Budge
Open Tender
Indian
West Bengal
LPG Bottling Plant, Budge Budge,Buita, South 24 Pa
08-07-2020

Tender Details

Modification Of Top Crown Of 1400 Mt Horton Spheres For Installation Of Radar Gauge And Temperature Transmitter At Indane Bottling Plant , Budge Budge

Key Value

Document Fees
Refer document
EMD
INR 20000.0 /-
Tender Value
Refer document

BOQ Items

Name of Work:Modification of top crown of Horton Spheres for Installation of Radar Gauge and Temperature Transmitter at Indane Bottling Plant, Budge Budge
Sl. No. Item Description Item Code / Make Quantity Units
1 1 Supply ,TPI and Installation of 6” SA 333 Gr6\nSch 80 Pipe with 300# WNRF Flange and\nStud Nuts with Gasket BI01010001010000000000000515BI0100001113 1 Nos
2 2 Supply, TPI and Installation of 3” SA 333 Gr 6\nSch 80 Pipe with 300# WNRF SA 350 LF2\nFalnge with stud nuts and gasket BI01010001010000000000000515BI0100001118 1 Nos
3 3 Supply , TPI and Installation of 4” SS 304 Sch\n10S Perforated Pipe along with internal\narrangement for holding Pipe at the\nbottom of the Sphere BI01010001010000000000000515BI0100001122 18 Mtr
4 4 Supply , TPI and Installation of 3” SS 304 Sch\n10S Perforated Pipe along with internal\narrangement for holding Pipe at the\nbottom of the Sphere BI01010001010000000000000515BI0100001123 18 Mtr
5 5 Supply and Installation of Scaffolding\nMaterial and GI Sheets for Fire Screen\nArrangement and Internal Scaffolding for\nHot work BI01010001010000000000000515BI0100001125 1 SU
6 6 PESO Approval for start of Hot work and\nCommissioning Approval after successful\ncompletion of Hot Work 1 SU
7 7 Supply of Consumables and Machinery\nalong with Electrical cables and FLP lights\nfor successful completion of the hot work\njob. 1 SU
8 8 NDT of Hot work area for modification of\nSphere including UT, RT and SR or newly\nweld joints. 1 SU
9 9 Third Party Inspection agency expenses\nfor Drawing Appraisal and Witness of Hot\nwork job and related NDT including\nRadiography and Stress Relieving and\nwitnessing hydrotest of Sphere and\nproviding general certificate to that\neffect. BI01010001010000000000000515BI0100001126 1 SU
10 10 Labor Charges for the above work\nincluding Modification (hot work),Degassing,Disconnection of inlet,Outlet,Cleaning,\nScaffolding,Inspection, Hydro testing and\nCommissioning BI01010001010000000000000515BI0100001128 1 SU
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail