Dpr, Boq And Cost Estimate For Providing Sewerage System In Left Out Approved Colonies Of Beri Town & Construction Of 3.0 Mld Stp Based On Sbr Technology Followed By Chlorination In Place Of Existing 2 Mld Stp Based On Water Stabilization Pond “Designing,

Tender Notice

24643673
Dpr, Boq And Cost Estimate For Providing Sewerage System In Left Out Approved Colonies Of Beri Town & Construction Of 3.0 Mld Stp Based On Sbr Technology Followed By Chlorination In Place Of Existing 2 Mld Stp Based On Water Stabilization Pond “Designing,
Indian
Haryana
19-06-2020
09-07-2020
09-07-2020

Tender Details

Dpr, Boq And Cost Estimate For Providing Sewerage System In Left Out Approved Colonies Of Beri Town & Construction Of 3.0 Mld Stp Based On Sbr Technology Followed By Chlorination In Place Of Existing 2 Mld Stp Based On Water Stabilization Pond “Designing, Construction, Erection, Testing & Commissioning Of Automatic & Plc Controlled With Scada 3.00 Mld Sewage Treatment Plant Based On Sequential Batch Reactor ( Sbr ) Technology, Complete In All Respect Including Approach Roads, Landscaping, Mcc Panel Room, Cctv Cameras & All Other Electrical, Mechanical, Piping & Instrumentation Works At Sewage Treatment Plant Including Operation & Maintenance For 12 Months During Defect Liability Period After Trial Run 3 Months And 5 Years Thereafter

Key Value

Document Fees
INR 15000 /-
EMD
INR 824320.00 /-
Tender Value
INR 4.12 Crore /-

Attachment

FileName File Description File Size
15571609-0252-46AE-9237-2CEEE9482FAE.html Tender Notice-Tender Notice 0
Tendernotice_2.pdf Tender Document-DNIT and Technical Eligibility Criteria 1480.68
BOQ_179937.xls Tender Document-Price Bid 263.50
Tendernotice_1.pdf Tender Document-Tender Notice 46.25

Other Information

Attachments
Additional Details Available on Click
✓ Tendering Authority
✓ Publication Document
(Tender Document / Tender Notice )

BOQ Items

Name of Work: DPR, BOQ and cost estimate for providing sewerage system in left out approved colonies of Beri Town & construction of 3.0 MLD STP based on SBR technology followed by chlorination in place of existing 2 MLD STP based on water stabilization pond “Designing, construction, erection, testing & commissioning of automatic & PLC controlled with SCADA 3.00 MLD Sewage Treatment Plant based on Sequential Batch Reactor (SBR) Technology, complete in all respect including approach roads, Landscaping, MCC Panel Room, CCTV Cameras & all other Electrical, Mechanical, Piping & Instrumentation works at Sewage Treatment Plant including Operation & Maintenance for 12 months during defect liability period after trial run 3 months and 5 years thereafter”
Sl. No. Item Description Item Code / Make Quantity Units
1 1 MPS NO. 1 & 2\ni) Design, construction, erection, testing & commissioning of 2.0 MLD capacity MPS-1 with peak factor 3 including screening chamber, wet well sump, pump Chamber of 4.26 x 3.66 m, Sluice gate valve for 400 mm dia sewer line, suitable size of 2 mechanical coarse screens (1 W + 1 SB), MCC panel, incomer, entire cable network, all other electrical , Mechanical, Piping & Instrumentation work including O & M for 12 months during defect liability period after trial run 3 month and 5 years thereafter.\nii) Removing & Shifting of old pumping machinery (2 No. 84 m3/h x 35 mtr. head and 2 No. 35 m3/h x 35 mtr. head) with accessories as given in scope of work, Diesel Generating set, Transformer set, Suction delivery pipes/ sluice valve, NRV etc. and repair of existing installations including their carriage & transportation to the new site of MPS-1 which are usable and providing new installations as per requirement / usability to make the system functional in all respects to the entire satisfaction of Engineer-in -charge.\niii) Providing and fixing of electric LT panel board suitable for 3 phase 4 wire AC supply with bus bar complete in all respect as per specifications mentioned in the DNIT.\n1 No. for 2 motors of 17.50 BHP\n1 No. for 2 motors of 35.00 BHP\niv) Laying, jointing & cutting of DI pipe of 250 mm i/d from proposed MPS No.1 to point ‘B’, in a length of 370 mtr. as shown on the layout plan, and extension of 300 mm i/d DI pipe from point ‘D’ to inlet box of the proposed STP in a length of 360 mtr. including excavation and all DI specials including 2 No. NRVs near point “A’ in the rising main coming from MPS No.1 & No.2 and connecting at point-‘A’ required to make it functional.\nNote: DI pipe will be provided by the department.\nv) O&M of MPS-2 including repair & maintenance of all civil, electrical, mechanical installation, deployment of staff for operation & maintenance of lawns etc. complete in all respect. BI01010001010000000000000515BI0100001113 1 Job
2 2 SEWERAGE TREATMENT PLANT\nA) Design, construction, erection, testing & commissioning of 3.00 MLD capacity Sewage Treatment Plant based on Sequential Batch Reactor (SBR) Technology complete in all respect, mechanical fine screen. Landscaping, disposal of treated effluent through open channel into nearby drain, MCC Panel Room & all other contingent Electrical, Mechanical, Piping & Instrumentation work, online monitoring system for effluent quality etc. With PLC & SCADA Arrangement for STP integrated with MPS-1 & MPS-2 including furniture & laboratory equipments as per detail given in the bid document and following components including O & M for 12 months during defect liability period after trial run 3 month and 5 years thereafter\ni) 2 No. High Mast of 9 mtr GI Octagonal pole of 4 mm thickness (T=100 mm, B=200mm, Base Plate = 320 x 320 x 20 mm), Window at 500 mm from Base Plate with 4 No. LED energy efficient lamps on each pole.\n(ii) Supply and installation 2 Nos. fine Screens of suitable size as per design for 3.00 MLD average flow with peak factor of 3\n(iii) Providing and installing 2 No. centrifuges (1 Working + 1 Stand bye) including centrifuge feed pump, all fittings, instrumentations, electric panel board etc. as per design complete in all respect including packing dry sludge in 20 Kg. bag and supplying the same to market Kisan Sewa Kendra or as directed by Engineer-in-charge within the lead as pointed at clause 4.4.4 of the NIT, including O & M for 12 months during defect liability period after trial run 3 month and 5 years thereafter BI01010001010000000000000515BI0100001114 1 Job
3 3 B) Design, Supply & Erection of 1 No. copper wound Transformer of 200 KVA on load tap changer or suitable capacity on higher side (at STP) of standard make outdoor type, VCB Panel, G.O. Switch, H.T. Metering Panels, APFC Panels along with for each Transformer, 11KV Substation, entire cable network from G.O. Switch to H.T. Metering equipment and from H.T. Metering to Transformer Main to L.T. Panel, Earthing, safety equipment and any other contingent thereto complete in all respect as per DNIT and getting it passed from Chief Electrical Officer including operation & Maintenance of 5 Years. BI01010001010000000000000515BI0100001115 1 Job
4 4 C) Design, Supply & Erection of 1 No. DG Set of 160 KVA suitable capacity on higher side (at STP) capacity with Acoustic Canopy, AMF Panel and Copper Earthing of suitable rate with change over switch & synchronizing panel complete as per DNIT including operation & Maintenance of 5 Years. BI01010001010000000000000515BI0100001116 1 Job
5 5 D) Providing and Installing 5 CCTV Cameras at STP complete as per satisfactions of the Engineer –in- Charge, within 96 hours of signing the Agreement along with 90 days recording (DVR) , 32 inch LED screen , 16 Chanel DVR with connectors , cables , poles & power supply with online real time output facility .\nCameras:\ni) 3 Nos PTZ speed dome 360 degree 50X zoom\nii) 2 cameras each 12mm lens size.\nMake: - Sony/ Canon/Panasonic/ Samsung & CP Plus CCTV Cameras should be installed and commissioned before starting execution of work & including O & M for 12 months during defect liability period after trial run 3 month and 5 years thereafter BI01010001010000000000000515BI0100001117 1 Job
6 6 E) Construction of HT / LT Panel room, PLC room, Centrifuge house, blower room and Lab cum office building including doors, windows & fittings with toilet block including all Sanitary fittings etc. as per drawings attached in DNIT at MPS & STP site covered area with RCC framed structure of brick work vitrified glazed tiles flooring, powder coated aluminum frame of size 100mm x 45mm of 10 gauge for chowkhat, 75mm x 45mm of 10 gauge for door frame, 45mm x 45mm of 10 gauge for window frame with 5mm thick glass AIS/Saint Gobain/ Modi Float Covered Area (200 sqm) including O & M for 12 months during defect liability period after trail run 3 month and 5 years thereafter. BI01010001010000000000000515BI0100001130 1 Job
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.

Copyright © 2020 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail