| 1 | 1 | Earth work in excavation in ordinary soil including 1.5m lift and lead upto 30m i/c all complete of work as per S.I. No. 251(a) | BI01010001010000000000000515BI0100001113 | 198.4 | Cum |
|---|
| 2 | 2 | Concrete with 4 cm gauge stone ballast, corase sand of 1.25 F.M.and cement,in proportion of 8:4:1 in foundations and under flore including supply of all material, labours t&p etc. required for proper completion of the work | BI01010001010000000000000515BI0100001114 | 37.2 | Cum |
|---|
| 3 | 3 | M-150 class brick work in 1:4 cement & core sand mortar i/c supply of all materials, labour and T&P etc. as per SI no. 305a | BI01010001010000000000000515BI0100001115 | 166.94 | Cum |
|---|
| 4 | 4 | R.C.C work in cement, app. Coarse sand & 2cm gauge app. Stone grits in proportion 1:1.5:3 in columning supply of reinforcement and its bending but including its fixing and including necessary centering and shuttering etc. and including supply of all materials, labours, T&P etc. reqd. for proper completion of the work including cost of binding wire. The rate excludes making of drip course which shall be paid extra as per SI No. 289 item | | 49.44 | Cum |
|---|
| 5 | 5 | R.C.C work in cement, app. Coarse sand & 2cm gauge app. Stone grits in proportion 1:1.5:3 in SLAB excluding supply of reinforcement and its bending but including its fixing and including necessary centering and shuttering etc. and including supply of all materials, labours, T&P etc. reqd. for proper completion of the work including cost of binding wire. The rate excludes making of drip course which shall be paid extra as per SI No. 284 new item | | 35.65 | Cum |
|---|
| 6 | 6 | M.S. (tor steel or plain) in plain work such as RCC or R.B. work including bending for proper shape and including supply of steel & its wastage, bends, hooks and authorised overlaping shall be measured and including cost of binding wire si no.502 | | 67.22 | Qtl. |
|---|
| 7 | 7 | M-150 class brick work in 1:4 cement & core sand mortar i/c supply of all materials, labour and T&P etc. as per SI no. 305a | | 122.82 | Cum |
|---|
| 8 | 8 | 12mm thick plaster in 1:4 cement & core sand mortar i/c supply of all materials, labour and T&P etc. as per SI no. 584a | | 1105.2 | sqm |
|---|
| 9 | 9 | Finishing wall with one coat of water proof cement paint of approved quality on previously old treated surface with this paint to give an even shade including supply of all materials, labour, Tools & plant etc. required for proper completion of the work. Same as item 660 but for weather coat (Asian or Berger Brand) SI No.662 two coat 80+25=105 | | 1105.2 | Sqm |
|---|
| 10 | 10 | painting or varnishing work in small areas or new wood work with one coat (upto one squire metre of ready mixed priming paint and one coat of approved superior quility ready mixed paint or varnish including supply of all materials , labour , tools & plants etc. required for propper completion of work. paint to be used shoud confirm the si no.641+642=55+25=80 | | 4.5 | Sqm |
|---|
| 11 | 11 | Cement concrete with stone grit, coarse sand and cement in proportion of 4:2:1 i/c supply of all materials, labour and T&P etc. as per SI no. 279(a) | | 0.45 | cum |
|---|
| 12 | 12 | M.S or iron work of small sizes and section such as holding down bolts, hold fast, tie rods grating etc. wrought to required from including supply of steel bolts, nuts wastage etc. and their fixing required for proper completion of the work si no.504 | | 2 | Qtl. |
|---|
| 13 | 13 | E/W filling with 8th km cartage including of all work | | 675 | cum |
|---|
| 14 | 14 | Construction of granular sub baseby providing coarse graded mixing in a mechanical mix plant at OMC carriage of mixed materail to work site spreading in uniform iayers with motor gradar on orepared surface and compacting with vivratory power roller achiev tha desired density ets all complete work. | | 6 | cum |
|---|
| 15 | 15 | Supply and fixing of 80 mm thick interlocking cement tiles with the cost of tiles including supply & spreading of sand to required template as necessary required for proper completion of work(Vibro compression tiles | | 50 | sqm |
|---|
| 16 | 16 | s/f inavergeration sign boardi/c all complete l | | 1 | no |
|---|
| 17 | 17 | Add 1% cess | | 1 | LumpSum |
|---|
| 18 | 18 | Add 12% GST | | 1 | LumpSum |
|---|