Biennial Rate Contract For Road Transportation Of Electrical Equipment/Materials, Vidyut Bhavan (4th Floor), Bidhannagar-West Bengal

West Bengal State Electricity Distribution Company Limited-WBSEDCL has published Biennial Rate Contract For Road Transportation Of Electrical Equipment/Materials. Submission Date for this Tender is 15-07-2020. Casks Barrels and Drums Tenders in Vidyut Bhavan (4th Floor), Bidhannagar West Bengal. Bidders can get complete Tender details and download the document.




Tender Notice

24627985
Corrigendum : Biennial Rate Contract For Road Transportation Of Electrical Equipment/Materials
Open Tender
Indian
West Bengal
Vidyut Bhavan (4th Floor), Bidhannagar
15-07-2020

Tender Details

Biennial Rate Contract For Road Transportation Of Electrical Equipment / Materials-1 Railpole upto 13 mtr. (52/60kg. Per MTR or (105/120 Lbs per yd.) (Minimum Chargeable unit- 20 units) 2 RATE TO BE QUOTED FOR LOADING, UNLOADING, COUNTING & STACKING (Rs. Per Pole Per Trip ) 3 MINIMUM CHARGES PER TRIP FOR LOADING, UNLOADING, COUNTING AND STACKING (Rs. L.S. ) 4 RATE TO BE QUOTED FOR TRANSPORTATION OF STEEL SECTIONS AND RAILS FROM S/YARD TO CENTRAL & OTHERS STORES FOR DISTANCE SLAB 1-30 KMS. (Rs. Per Unit Per Km. ) 5 RATE TO BE QUOTED FOR TRANSPORTATION FROM ONE STORE TO ANOTHER STORE FOR DISTANCE SLAB 1 to 30 KMS. (Rs. Per Unit Per Km. ) 6 Steel Tubular Pole (upto 11 mtr. Long) (Minimum Chargeable unit- 20 units for Truck & 25 units for Trailor) 7 RATE TO BE QUOTED FOR LOADING, UNLOADING, COUNTING & STACKING (Rs. Per Pole Per Trip ) 8 MINIMUM CHARGES PER TRIP FOR LOADING, UNLOADING, COUNTING AND STACKING (Rs. L.S. ) 9 RATE TO BE QUOTED FOR TRANSPORTATION FROM ONE STORE TO ANOTHER STORE FOR DISTANCE SLAB 1 to 30 KMS. (Rs. Per Unit Per Km. ) 10 Steel Tubular Pole (above 11 mtr. Long) (Minimum Chargeable unit- 30 units for Tralor) 11 RATE TO BE QUOTED FOR LOADING, UNLOADING, COUNTING & STACKING (Rs. Per Pole Per Trip ) 12 MINIMUM CHARGES PER TRIP FOR LOADING, UNLOADING, COUNTING AND STACKING (Rs. L.S. ) 13 RATE TO BE QUOTED FOR TRANSPORTATION FROM ONE STORE TO ANOTHER STORE FOR DISTANCE SLAB 1 to 30 KMS. (Rs. Per Unit Per Km. ) 14 M.S.angles,channels,M.S.Plates,G.C.sheets,Flats,Steel wire, Rods in coil, G.P. sheets B.Q.Plates, M.S. Rounds, Tor steel, Steel wire etc.(upto 6 meters length) (Minimum Chargeable unit- 8.0 MT) 15 RATE TO BE QUOTED FOR LOADING, UNLOADING, COUNTING & STACKING (Rs. Per MT Per Trip ) 16 MINIMUM CHARGES PER TRIP FOR LOADING, UNLOADING, COUNTING AND STACKING (Rs. L.S. ) 17 RATE TO BE QUOTED FOR TRANSPORTATION OF STEEL SECTIONS AND RAILS FROM S/YARD TO CENTRAL & OTHERS STORES FOR DISTANCE SLAB 1-30 KMS. (Rs. Per Tonne Per Km. ) 18 RATE TO BE QUOTED FOR TRANSPORTATION FROM ONE STORE TO ANOTHER STORE FOR DISTANCE SLAB 1 to 30 KMS. (Rs. Per Tonne Per Km. ) 19 Galvanized/Non Galvanized Hot Rolled Steel Beams/Joists, (above 6 meters length) (Minimum Chargeable unit- 20 units) 20 RATE TO BE QUOTED FOR LOADING, UNLOADING, COUNTING & STACKING (Rs. Per Unit Per Trip ) 21 MINIMUM CHARGES PER TRIP FOR LOADING, UNLOADING, COUNTING AND STACKING (Rs. L.S. ) 22 RATE TO BE QUOTED FOR TRANSPORTATION OF STEEL SECTIONS AND RAILS FROM S/YARD TO CENTRAL & OTHERS STORES FOR DISTANCE SLAB 1-30 KMS. (Rs. Per Unit Per Trip ) 23 RATE TO BE QUOTED FOR TRANSPORTATION FROM ONE STORE TO ANOTHER STORE FOR DISTANCE SLAB 1 to 30 KMS. (Rs. Per Unit Per Trip ) 24 M.S.Angles,Channels,Joists,M.S.Plates,Billets,G.C.sheets, Flats,Steel wire, Rods in coil, G.P. sheets . B.Q.Plates, M.S. Rounds, Tor steel, Steel wire etc.(above 6 meters length) (Minimum Chargeable 8.0 MT for Truck & 15MT for Trailor) 25 RATE TO BE QUOTED FOR LOADING, UNLOADING, COUNTING & STACKING (Rs. Per MT Per Trip ) 26 MINIMUM CHARGES PER TRIP FOR LOADING, UNLOADING, COUNTING AND STACKING (Rs. L.S. ) 27 RATE TO BE QUOTED FOR TRANSPORTATION OF STEEL SECTIONS AND RAILS FROM S/YARD TO CENTRAL & OTHERS STORES FOR DISTANCE SLAB 1-30 KMS.(Rs. Per Ton Per Km. ) 28 RATE TO BE QUOTED FOR TRANSPORTATION FROM ONE STORE TO ANOTHER STORE FOR DISTANCE SLAB 1 to 30 KMS. (Rs. Per Ton Per Km. ) 29 G.I.wire, steel wire, Earth spike, stay wire, stay sets, hardware fittings, clamps, PVC wire, Nuts & bolts, spares in crates or cases, all types of assorted materials namely P.V.modules, lamps dies, tools, weighing machine, G.I.Pin etc. (Minimum Chargeable unit- 8.0 MT) 30 RATE TO BE QUOTED FOR LOADING, UNLOADING, COUNTING & STACKING (Rs. Per MT Per Trip ) 31 MINIMUM CHARGES PER TRIP FOR LOADING, UNLOADING, COUNTING AND STACKING (Rs. L.S. ) 32 RATE TO BE QUOTED FOR TRANSPORTATION FROM ONE STORE TO ANOTHER STORE FOR DISTANCE SLAB 1 to 30 KMS. (Rs. Per Ton Per Km ) 33 All sorts of PVC, U.G.XLPE, LTAB & HTAB cables, Control Cables AAC,AAAC,ACSR & other conductor drums, Isolators upto 33/36 KV, Lightning arrestors upto 33 KV, Link switches, all types of Porcelain Pin/Post Insulators etc.(weighing upto 1 M/T each) (Minimum Chargeable unit- 8.0 MT) 34 RATE TO BE QUOTED FOR LOADING, UNLOADING, COUNTING & STACKING (Rs. Per Ton Per Trip. ) 35 MINIMUM CHARGES PER TRIP FOR LOADING, UNLOADING, COUNTING AND STACKING (Rs. L.S. ) 36 RATE TO BE QUOTED FOR TRANSPORTATION FROM ONE STORE TO ANOTHER STORE FOR DISTANCE SLAB 1 to 30 KMS. (Rs. Per Ton Per Km ) 37 All types of 11KV Polymer Insulatorn[ 100 nos. will be treated as 1(One) Unit] (Minimum Chargeable unit- 50 Units)n 38 RATE TO BE QUOTED FOR LOADING, UNLOADING, COUNTING & STACKING (Rs. Per Unit Per Trip. ) 39 MINIMUM CHARGES PER TRIP FOR LOADING, UNLOADING, COUNTING AND STACKING (Rs. L.S. ) 40 RATE TO BE QUOTED FOR TRANSPORTATION FROM ONE STORE TO ANOTHER STORE FOR DISTANCE SLAB 1 to 30 KMS. (Rs. Per Unit Per Trip. ) 41 All types of 33KV Polymer Insulatorn[ 100 nos. will be treated as 1(One) Unit] (Minimum Chargeable unit- 25 Units) 42 RATE TO BE QUOTED FOR LOADING, UNLOADING, COUNTING & STACKING (Rs. Per Unit Per Trip. ) 43 MINIMUM CHARGES PER TRIP FOR LOADING, UNLOADING, COUNTING AND STACKING (Rs. L.S. ) 44 RATE TO BE QUOTED FOR TRANSPORTATION FROM ONE STORE TO ANOTHER STORE FOR DISTANCE SLAB 1 to 30 KMS. (Rs. Per Unit Per Trip. ) 45 All sorts of PVC & U.G.Cables, ,XLPE,LTAB/HTAB cables, control cables, AAC, AAAC,ACSR & other conductor drums, Isolators link switches, etc. (weighing above 1 M/T but upto 4 M/T each) except trailor consignment. (Minimum Chargeable unit- 8.0 MT) 46 RATE TO BE QUOTED FOR LOADING, UNLOADING, COUNTING & STACKING (Rs. Per MT. ) 47 MINIMUM CHARGES PER TRIP FOR LOADING, UNLOADING, COUNTING AND STACKING (Rs. L.S. ) 48 RATE TO BE QUOTED FOR TRANSPORTATION FROM ONE STORE TO ANOTHER STORE FOR DISTANCE SLAB 1 to 30 KMS. (Rs. Per Ton Per Km. ) 49 All sorts of cables( XLPE ) and other drump (weighing above 4 M/T each) Trailor consignment (Minimum Chargeable 8.0 MT for Truck & 15MT for Trailor) 50 RATE TO BE QUOTED FOR LOADING, UNLOADING, COUNTING & STACKING (Rs. Per MT. ) 51 MINIMUM CHARGES PER TRIP FOR LOADING, UNLOADING, COUNTING AND STACKING (Rs. L.S. ) 52 RATE TO BE QUOTED FOR TRANSPORTATION FROM ONE STORE TO ANOTHER STORE FOR DISTANCE SLAB 1 to 30 KMS. (Rs. Per Ton Per Km. ) 53 Auto re-closure and sectionaliser (Minimum Chargeable unit- 06 Units) 54 RATE TO BE QUOTED FOR LOADING, UNLOADING, COUNTING & STACKING (Rs. Per Unit . ) 55 MINIMUM CHARGES PER TRIP FOR LOADING, UNLOADING, COUNTING AND STACKING (Rs. L.S. ) 56 RATE TO BE QUOTED FOR TRANSPORTATION FROM ONE STORE TO ANOTHER STORE FOR DISTANCE SLAB 1 to 30 KMS. (Rs. Per Trip Per Km. ) 57 11KV/12 KV Single Panel Switchgear,11 KV Switch Board And Circuit Breaker(Upto 33-36 KV) Outdoor Type OCB/VCB/RMU 33 KV Panel Board Including SCADA Compatible Panel And 11 KV Capacitor Bank. (Minimum Chargeable unit- 2.0 Unit ) 58 RATE TO BE QUOTED FOR LOADING, UNLOADING, COUNTING & STACKING (Rs. Per Unit . ) 59 MINIMUM CHARGES PER TRIP FOR LOADING, UNLOADING, COUNTING AND STACKING (Rs. L.S. ) 60 RATE TO BE QUOTED FOR TRANSPORTATION FROM ONE STORE TO ANOTHER STORE FOR DISTANCE SLAB 1 to 30 KMS. (Rs. Per Trip Per Km.) 61 3 Ph. Capacitor Bank For O.D. Errection, Comprising Of SF-6 Breaker Reactor,33 KV CT & PT Lightning Arrestor, Neutral C.T. Mounting Panel Board and Structures Etc. As Applicable(If the above Equipments Required More than One Truck, each Truck Load will be treated as one Unit for the purpose of Calculation of rate of Loading, Unloading etc. and Transportation Cost)Transit Insurance, if required, will be done by the Transporter and subsequently the Company will reimburse the Premium at actual on production of Original documents. (Minimum Chargeable unit-at Actual) 62 RATE TO BE QUOTED FOR LOADING, UNLOADING, COUNTING & STACKING (Rs. Per Unit . ) 63 MINIMUM CHARGES PER TRIP FOR LOADING, UNLOADING, COUNTING AND STACKING (Rs. L.S. ) 64 RATE TO BE QUOTED FOR TRANSPORTATION FROM ONE STORE TO ANOTHER STORE FOR DISTANCE SLAB 1 to 30 KMS. (Rs. Per Unit Per Km.) 65 Distribution Transformer upto 25 KVA, 33 KV CT, 33 KV PT, Battery Charger and 11 KV CT,PT combined units. (Minimum Chargeable unit- 10 Unit ) 66 RATE TO BE QUOTED FOR LOADING, UNLOADING, COUNTING & STACKING (Rs. Per Unit . ) 67 MINIMUM CHARGES PER TRIP FOR LOADING, UNLOADING, COUNTING AND STACKING (Rs. L.S. ) 68 RATE TO BE QUOTED FOR TRANSPORTATION FROM ONE STORE TO ANOTHER STORE FOR DISTANCE SLAB 1 to 30 KMS. (Rs. Per Unit Per Km.) 69 Distribution Transformers above 25 KVA but upto 100 KVA (Minimum Chargeable unit- 08 Unit ) 70 RATE TO BE QUOTED FOR LOADING, UNLOADING, COUNTING & STACKING (Rs. Per Unit . ) 71 MINIMUM CHARGES PER TRIP FOR LOADING, UNLOADING, COUNTING AND STACKING (Rs. L.S. ) 72 RATE TO BE QUOTED FOR TRANSPORTATION FROM ONE STORE TO ANOTHER STORE FOR DISTANCE SLAB 1 to 30 KMS. (Rs. Per Unit Per Km.) 73 Distribution transformer 160 KVA to 315 KVA (Minimum Chargeable unit- 03 Unit ) 74 RATE TO BE QUOTED FOR LOADING, UNLOADING, COUNTING & STACKING (Rs. Per Unit . ) 75 MINIMUM CHARGES PER TRIP FOR LOADING, UNLOADING, COUNTING AND STACKING (Rs. L.S. ) 76 RATE TO BE QUOTED FOR TRANSPORTATION FROM ONE STORE TO ANOTHER STORE FOR DISTANCE SLAB 1 to 30 KMS. (Rs. Per Unit Per Km.) 77 100 KVA Station Service Transformers, 100 KVA/0.415 KVA Indoor Type Transformer and battery (Minimum Chargeable unit- 03 Unit ) 78 RATE TO BE QUOTED FOR LOADING, UNLOADING, COUNTING & STACKING (Rs. Per Unit . ) 79 MINIMUM CHARGES PER TRIP FOR LOADING, UNLOADING, COUNTING AND STACKING (Rs. L.S. ) 80 RATE TO BE QUOTED FOR TRANSPORTATION FROM ONE STORE TO ANOTHER STORE FOR DISTANCE SLAB 1 to 30 KMS. (Rs. Per Unit Per Km.) 81 100 KVA(33/0.4KV) Earthing Cum Station Service Transformers (Minimum Chargeable unit- At Acutal ) 82 RATE TO BE QUOTED FOR LOADING, UNLOADING, COUNTING & STACKING (Rs. Per Unit . ) 83 MINIMUM CHARGES PER TRIP FOR LOADING, UNLOADING, COUNTING AND STACKING (Rs. L.S. ) 84 RATE TO BE QUOTED FOR TRANSPORTATION FROM ONE STORE TO ANOTHER STORE FOR DISTANCE SLAB 1 to 30 KMS. (Rs. Per Unit Per Km.) 85 Distribution transformer 630 KVA to 1000 KVA (Minimum Chargeable unit- At Acutal ) 86 RATE TO BE QUOTED FOR LOADING, UNLOADING, COUNTING & STACKING (Rs. Per Unit . ) 87 MINIMUM CHARGES PER TRIP FOR LOADING, UNLOADING, COUNTING AND STACKING (Rs. L.S. ) 88 RATE TO BE QUOTED FOR TRANSPORTATION FROM ONE STORE TO ANOTHER STORE FOR DISTANCE SLAB 1 to 30 KMS. (Rs. Per Unit Per Km.) 89 Mixed consignments of different items namely all type of steel materials upto 6 mtr., Conductors and transformers upto 100 KVA, hardware fittings, clamps polycon, PVC wires, Transformer Oil in drums and other kinds of materials having weight upto 1 M/T each and length upto 6 mtr., and any other materials not covered in any category(excluding the materials under item no. 11,12, 13, 15, 18, 19, 20, 21 ) (If two or more categories of materials of different rates and mixed to form a trip of mixed consignment, the Company will give protection that the amount payable on a trip of mixed consignment at the rate of item ‘18’ is not less than the amount which the transporter can get by carrying less than 8 M/T of a particular category of materials having higher rates) (save & except item no.23, 24, 25, 26, 27 ) (Minimum Chargeable unit- 08 MT ) 90 RATE TO BE QUOTED FOR LOADING, UNLOADING, COUNTING & STACKING (Rs. Per MT . ) 91 MINIMUM CHARGES PER TRIP FOR LOADING, UNLOADING, COUNTING AND STACKING (Rs. L.S. ) 92 RATE TO BE QUOTED FOR TRANSPORTATION FROM ONE STORE TO ANOTHER STORE FOR DISTANCE SLAB 1 to 30 KMS. (Rs. Per Unit Per Km.) 93 Transformer and other oil in drums or Barrel (Minimum Chargeable unit- 30 Drums or Barrel ) 94 RATE TO BE QUOTED FOR LOADING, UNLOADING, COUNTING & STACKING (Rs. Per Drum / Barrel ) 95 MINIMUM CHARGES PER TRIP FOR LOADING, UNLOADING, COUNTING AND STACKING (Rs. L.S. ) 96 RATE TO BE QUOTED FOR TRANSPORTATION FROM ONE STORE TO ANOTHER STORE FOR DISTANCE SLAB 1 to 30 KMS. (Rs. Per Drum / Barrel ) 97 Pilferproof meter box: nna) 900 x 350 x 250 mm- 25 Nos. will be consider as 1 unitsnnb) 400 x 300 x 200 mm- 75 Nos. will be consider as 1 unitsnnc) 265 x 215 x 75 mm- 112 Nos. will be consider as 1 unitsnn (Minimum Chargeable unit- 08 Unit) 98 RATE TO BE QUOTED FOR LOADING, UNLOADING, COUNTING & STACKING (Rs. Per Unit . ) 99 MINIMUM CHARGES PER TRIP FOR LOADING, UNLOADING, COUNTING AND STACKING (Rs. L.S. ) 100 RATE TO BE QUOTED FOR TRANSPORTATION FROM ONE STORE TO ANOTHER STORE FOR DISTANCE SLAB 1 to 30 KMS. (Rs. Per Unit Per Km.) 101 Energy Meter, Single phase with PP Boxn[ 100 nos. will be treated as 1(One) Unit] (Minimum Chargeable unit- 30 Unit)n 102 RATE TO BE QUOTED FOR LOADING, UNLOADING, COUNTING & STACKING (Rs. Per Unit . ) 103 MINIMUM CHARGES PER TRIP FOR LOADING, UNLOADING, COUNTING AND STACKING (Rs. L.S. ) 104 RATE TO BE QUOTED FOR TRANSPORTATION FROM ONE STORE TO ANOTHER STORE FOR DISTANCE SLAB 1 to 30 KMS. (Rs. Per Unit Per Km.) 105 Energy Meter, Single phase without PP Boxn[ 100 nos. will be treated as 1(One) Unit] (Minimum Chargeable unit- 40 Unit)n 106 RATE TO BE QUOTED FOR LOADING, UNLOADING, COUNTING & STACKING (Rs. Per Unit . ) 107 MINIMUM CHARGES PER TRIP FOR LOADING, UNLOADING, COUNTING AND STACKING (Rs. L.S. ) 108 RATE TO BE QUOTED FOR TRANSPORTATION FROM ONE STORE TO ANOTHER STORE FOR DISTANCE SLAB 1 to 30 KMS. (Rs. Per Unit Per Km.) 109 Energy Meter, Three phase with PP Boxn[ 30 nos. will be treated as 1(One) Unit] (Minimum Chargeable unit- 10 Unit)n 110 RATE TO BE QUOTED FOR LOADING, UNLOADING, COUNTING & STACKING (Rs. Per Unit . ) 111 MINIMUM CHARGES PER TRIP FOR LOADING, UNLOADING, COUNTING AND STACKING (Rs. L.S. ) 112 RATE TO BE QUOTED FOR TRANSPORTATION FROM ONE STORE TO ANOTHER STORE FOR DISTANCE SLAB 1 to 30 KMS. (Rs. Per Unit Per Km.) 113 Cutting charges of Long length Steel materials (Per Sq. cm.) 114 For Transportation within Hill Area 115 Steel Tubular Pole (upto 11 mtr. Long) (Minimum Chargeable unit- 20 units for Truck) 116 RATE TO BE QUOTED FOR LOADING, UNLOADING, COUNTING & STACKING (Rs. Per Pole ) 117 MINIMUM CHARGES PER TRIP FOR LOADING, UNLOADING, COUNTING AND STACKING (Rs. L.S. ) 118 RATE TO BE QUOTED FOR TRANSPORTATION FROM ONE STORE TO ANOTHER STORE FOR DISTANCE SLAB 1 to 30 KMS. (Rs. Per Unit Per Km.) 119 M.S.angles,channels,M.S.Plates,G.C.sheets,Flats,Steel wire, Rods in coil, G.P. sheets B.Q.Plates, M.S. Rounds, Tor steel, Steel wire etc.(upto 6 meters length) (Minimum Chargeable unit- 5.0 MT) 120 RATE TO BE QUOTED FOR LOADING, UNLOADING, COUNTING & STACKING (Rs. Per MT ) 121 MINIMUM CHARGES PER TRIP FOR LOADING, UNLOADING, COUNTING AND STACKING (Rs. L.S. ) 122 RATE TO BE QUOTED FOR TRANSPORTATION OF STEEL SECTIONS AND RAILS FROM S/YARD TO CENTRAL & OTHERS STORES FOR DISTANCE SLAB 1-30 KMS. (Rs. Per MT Per Km.) 123 RATE TO BE QUOTED FOR TRANSPORTATION FROM ONE STORE TO ANOTHER STORE FOR DISTANCE SLAB 1 to 30 KMS. (Rs. Per MT Per Km.) 124 G.I.wire, steel wire, Earth spike, stay wire, stay sets, hardware fittings, clamps, PVC wire, Nuts & bolts, spares in crates or cases, all types of assorted materials namely P.V.modules, lamps dies, tools, weighing machine, G.I.Pin etc. (Minimum Chargeable unit- 5.0 MT) 125 RATE TO BE QUOTED FOR LOADING, UNLOADING, COUNTING & STACKING (Rs. Per MT ) 126 MINIMUM CHARGES PER TRIP FOR LOADING, UNLOADING, COUNTING AND STACKING (Rs. L.S. ) 127 RATE TO BE QUOTED FOR TRANSPORTATION FROM ONE STORE TO ANOTHER STORE FOR DISTANCE SLAB 1 to 30 KMS. (Rs. Per MT Per Km.) 128 All sorts of PVC, U.G.XLPE, LTAB & HTAB cables, Control Cables AAC,AAAC,ACSR & other conductor drums, Isolators upto 33/36 KV, Lightning arrestors upto 33 KV, Link switches, all types of Porcelain Pin/Post Insulators etc.(weighing upto 1 M/T each) (Minimum Chargeable unit- 5.0 MT) 129 RATE TO BE QUOTED FOR LOADING, UNLOADING, COUNTING & STACKING (Rs. Per MT ) 130 MINIMUM CHARGES PER TRIP FOR LOADING, UNLOADING, COUNTING AND STACKING (Rs. L.S. ) 131 RATE TO BE QUOTED FOR TRANSPORTATION FROM ONE STORE TO ANOTHER STORE FOR DISTANCE SLAB 1 to 30 KMS. (Rs. Per MT Per Km.) 132 All types of 11KV Polymer Insulatorn[ 100 nos. will be treated as 1(One) Unit] (Minimum Chargeable unit- 30 Units)n 133 RATE TO BE QUOTED FOR LOADING, UNLOADING, COUNTING & STACKING (Rs. Per Unit ) 134 MINIMUM CHARGES PER TRIP FOR LOADING, UNLOADING, COUNTING AND STACKING (Rs. L.S. ) 135 RATE TO BE QUOTED FOR TRANSPORTATION FROM ONE STORE TO ANOTHER STORE FOR DISTANCE SLAB 1 to 30 KMS. (Rs. Per Unit Per Km.) 136 All types of 33KV Polymer Insulatorn[ 100 nos. will be treated as 1(One) Unit] (Minimum Chargeable unit- 15 Units)n 137 RATE TO BE QUOTED FOR LOADING, UNLOADING, COUNTING & STACKING (Rs. Per Unit ) 138 MINIMUM CHARGES PER TRIP FOR LOADING, UNLOADING, COUNTING AND STACKING (Rs. L.S. ) 139 RATE TO BE QUOTED FOR TRANSPORTATION FROM ONE STORE TO ANOTHER STORE FOR DISTANCE SLAB 1 to 30 KMS. (Rs. Per Unit Per Km.) 140 All sorts of PVC & U.G.Cables, ,XLPE,LTAB/HTAB cables, control cables, AAC, AAAC,ACSR & other conductor drums, Isolators link switches, etc. (weighing above 1 M/T but upto 4 M/T each) except trailor consignment. (Minimum Chargeable unit- 5.0 MT) 141 RATE TO BE QUOTED FOR LOADING, UNLOADING, COUNTING & STACKING (Rs. Per MT ) 142 MINIMUM CHARGES PER TRIP FOR LOADING, UNLOADING, COUNTING AND STACKING (Rs. L.S. ) 143 RATE TO BE QUOTED FOR TRANSPORTATION FROM ONE STORE TO ANOTHER STORE FOR DISTANCE SLAB 1 to 30 KMS. (Rs. Per MT Per Km.) 144 All sort of cables ( XLPE ) and other drums (weighing above 4 M/T each) (Minimum Chargeable unit- 5.0 MT) 145 RATE TO BE QUOTED FOR LOADING, UNLOADING, COUNTING & STACKING (Rs. Per MT ) 146 MINIMUM CHARGES PER TRIP FOR LOADING, UNLOADING, COUNTING AND STACKING (Rs. L.S. ) 147 RATE TO BE QUOTED FOR TRANSPORTATION FROM ONE STORE TO ANOTHER STORE FOR DISTANCE SLAB 1 to 30 KMS. (Rs. Per MT Per Km.) 148 Auto re-closure and sectionaliser (Minimum Chargeable unit- 06 Units) 149 RATE TO BE QUOTED FOR LOADING, UNLOADING, COUNTING & STACKING (Rs. Per Unit ) 150 MINIMUM CHARGES PER TRIP FOR LOADING, UNLOADING, COUNTING AND STACKING (Rs. L.S. ) 151 RATE TO BE QUOTED FOR TRANSPORTATION FROM ONE STORE TO ANOTHER STORE FOR DISTANCE SLAB 1 to 30 KMS. (Rs. Per Unit Per Km.) 152 11KV/12 KV Single Panel Switchgear,11 KV Switch Board And Circuit Breaker(Upto 33-36 KV) Outdoor Type OCB/VCB/RMU 33 KV Panel Board Including SCADA Compatible Panel And 11 KV Capacitor Bank. (Minimum Chargeable unit- 2.0 Unit ) 153 RATE TO BE QUOTED FOR LOADING, UNLOADING, COUNTING & STACKING (Rs. Per Unit ) 154 MINIMUM CHARGES PER TRIP FOR LOADING, UNLOADING, COUNTING AND STACKING (Rs. L.S. ) 155 RATE TO BE QUOTED FOR TRANSPORTATION FROM ONE STORE TO ANOTHER STORE FOR DISTANCE SLAB 1 to 30 KMS. (Rs. Per Unit Per Km.) 156 3 Ph. Capacitor Bank For O.D. Errection, Comprising Of SF-6 Breaker Reactor,33 KV CT & PT Lightning Arrestor, Neutral C.T. Mounting Panel Board and Structures Etc. As Applicable(If the above Equipments Required More than One Truck, each Truck Load will be treated as one Unit for the purpose of Calculation of rate of Loading, Unloading etc. and Transportation Cost)Transit Insurance, if required, will be done by the Transporter and subsequently the Company will reimburse the Premium at actual on production of Original documents. ( Minimum Chargeable unit- at Actual ) 157 RATE TO BE QUOTED FOR LOADING, UNLOADING, COUNTING & STACKING (Rs. Per Unit) 158 MINIMUM CHARGES PER TRIP FOR LOADING, UNLOADING, COUNTING AND STACKING (Rs. L.S. ) 159 RATE TO BE QUOTED FOR TRANSPORTATION FROM ONE STORE TO ANOTHER STORE FOR DISTANCE SLAB 1 to 30 KMS. (Rs. Per Unit Per Km.) 160 Distribution Transformer upto 25 KVA33 KV CT, 33 KV PT, Battery Charger and 11 KV CT,PT combined units. (Minimum Chargeable unit- 06 Units) 161 RATE TO BE QUOTED FOR LOADING, UNLOADING, COUNTING & STACKING (Rs. Per Unit ) 162 MINIMUM CHARGES PER TRIP FOR LOADING, UNLOADING, COUNTING AND STACKING (Rs. L.S. ) 163 RATE TO BE QUOTED FOR TRANSPORTATION FROM ONE STORE TO ANOTHER STORE FOR DISTANCE SLAB 1 to 30 KMS. (Rs. Per Unit Per Km.) 164 Distribution Transformers above 25 KVA but upto 100 KVA (Minimum Chargeable unit- 04 Units) 165 RATE TO BE QUOTED FOR LOADING, UNLOADING, COUNTING & STACKING (Rs. Per Unit ) 166 MINIMUM CHARGES PER TRIP FOR LOADING, UNLOADING, COUNTING AND STACKING (Rs. L.S. ) 167 RATE TO BE QUOTED FOR TRANSPORTATION FROM ONE STORE TO ANOTHER STORE FOR DISTANCE SLAB 1 to 30 KMS. (Rs. Per Unit Per Km.) 168 Distribution transformer 160 KVA to 315 KVA (Minimum Chargeable unit- 02 Units) 169 RATE TO BE QUOTED FOR LOADING, UNLOADING, COUNTING & STACKING (Rs. Per Unit ) 170 MINIMUM CHARGES PER TRIP FOR LOADING, UNLOADING, COUNTING AND STACKING (Rs. L.S. ) 171 RATE TO BE QUOTED FOR TRANSPORTATION FROM ONE STORE TO ANOTHER STORE FOR DISTANCE SLAB 1 to 30 KMS. (Rs. Per Unit Per Km.) 172 100 KVA Station Service Transformers, 100 KVA/0.415 KVA Indoor Type Transformer and battery (Minimum Chargeable unit- 02 Units) 173 RATE TO BE QUOTED FOR LOADING, UNLOADING, COUNTING & STACKING (Rs. Per Unit ) 174 MINIMUM CHARGES PER TRIP FOR LOADING, UNLOADING, COUNTING AND STACKING (Rs. L.S. ) 175 RATE TO BE QUOTED FOR TRANSPORTATION FROM ONE STORE TO ANOTHER STORE FOR DISTANCE SLAB 1 to 30 KMS. (Rs. Per Unit Per Km.) 176 100 KVA(33/4KV) Earthing Cum Station Service Transformers (Minimum Chargeable unit- At Acutal ) 177 RATE TO BE QUOTED FOR LOADING, UNLOADING, COUNTING & STACKING (Rs. Per Unit ) 178 MINIMUM CHARGES PER TRIP FOR LOADING, UNLOADING, COUNTING AND STACKING (Rs. L.S. ) 179 RATE TO BE QUOTED FOR TRANSPORTATION FROM ONE STORE TO ANOTHER STORE FOR DISTANCE SLAB 1 to 30 KMS. (Rs. Per Unit Per Km.) 180 Distribution transformer 630 KVA to 1000 KVA (Minimum Chargeable unit- At Acutal ) 181 RATE TO BE QUOTED FOR LOADING, UNLOADING, COUNTING & STACKING (Rs. Per Unit ) 182 MINIMUM CHARGES PER TRIP FOR LOADING, UNLOADING, COUNTING AND STACKING (Rs. L.S. ) 183 RATE TO BE QUOTED FOR TRANSPORTATION FROM ONE STORE TO ANOTHER STORE FOR DISTANCE SLAB 1 to 30 KMS. (Rs. Per Unit Per Km.) 184 Mixed consignments of different items namely all type of steel materials upto 6 mtr., Conductors and transformers upto 100 KVA, hardware fittings, clamps polycon, PVC wires, Transformer Oil in drums and other kinds of materials having weight upto 1 M/T each and length upto 6 mtr., and any other materials not covered in any category(excluding the materials under item no. ( 36, 37, 39, 42, 43, 44, 45 ) (If two or more categories of materials of different rates and mixed to form a trip of mixed consignment, the Company will give protection that the amount payable on a trip of mixed consignment at the rate of item ‘18’ is not less than the amount which the transporter can get by carrying less than 8 M/T of a particular category of materials having higher rates) (save & except item no.47, 48, 49, 50, 51 ) (Minimum Chargeable unit- 5.0 MT ) 185 RATE TO BE QUOTED FOR LOADING, UNLOADING, COUNTING & STACKING (Rs. Per MT ) 186 MINIMUM CHARGES PER TRIP FOR LOADING, UNLOADING, COUNTING AND STACKING (Rs. L.S. ) 187 RATE TO BE QUOTED FOR TRANSPORTATION FROM ONE STORE TO ANOTHER STORE FOR DISTANCE SLAB 1 to 30 KMS. (Rs. Per MT Per Km.) 188 Transformer and other oil in drums or Barrel (Minimum Chargeable unit- 16 Drums or Barrel ) 189 RATE TO BE QUOTED FOR LOADING, UNLOADING, COUNTING & STACKING (Rs. Per Drum/Barrel ) 190 MINIMUM CHARGES PER TRIP FOR LOADING, UNLOADING, COUNTING AND STACKING (Rs. L.S. ) 191 RATE TO BE QUOTED FOR TRANSPORTATION FROM ONE STORE TO ANOTHER STORE FOR DISTANCE SLAB 1 to 30 KMS. (Rs. Per Drum/Barrel Per Km.) 192 Pilferproof meter box: nna) 900 x 350 x 250 mm- 25 Nos. will be consider as 1 unitsnnb) 400 x 300 x 200 mm- 75 Nos. will be consider as 1 unitsnnc) 265 x 215 x 75 mm- 112 Nos. will be consider as 1 unitsn(Minimum Chargeable unit- 05 Units ) 193 RATE TO BE QUOTED FOR LOADING, UNLOADING, COUNTING & STACKING (Rs. Per Unit ) 194 MINIMUM CHARGES PER TRIP FOR LOADING, UNLOADING, COUNTING AND STACKING (Rs. L.S. ) 195 RATE TO BE QUOTED FOR TRANSPORTATION FROM ONE STORE TO ANOTHER STORE FOR DISTANCE SLAB 1 to 30 KMS. (Rs. Per Unit Per Km.) 196 Energy Meter, Single phase with PP Boxn[ 100 nos. will be treated as 1(One) Unit] (Minimum Chargeable unit- 15 Units )n 197 RATE TO BE QUOTED FOR LOADING, UNLOADING, COUNTING & STACKING (Rs. Per Unit ) 198 MINIMUM CHARGES PER TRIP FOR LOADING, UNLOADING, COUNTING AND STACKING (Rs. L.S. ) 199 RATE TO BE QUOTED FOR TRANSPORTATION FROM ONE STORE TO ANOTHER STORE FOR DISTANCE SLAB 1 to 30 KMS. (Rs. Per Unit Per Km.) 200 Energy Meter, Single phase without PP Boxn[ 100 nos. will be treated as 1(One) Unit] (Minimum Chargeable unit- 20 Units )n 201 RATE TO BE QUOTED FOR LOADING, UNLOADING, COUNTING & STACKING (Rs. Per Unit ) 202 MINIMUM CHARGES PER TRIP FOR LOADING, UNLOADING, COUNTING AND STACKING (Rs. L.S. ) 203 RATE TO BE QUOTED FOR TRANSPORTATION FROM ONE STORE TO ANOTHER STORE FOR DISTANCE SLAB 1 to 30 KMS. (Rs. Per Unit Per Km.) 204 Energy Meter, Three phase with PP Boxn[ 30 nos. will be treated as 1(One) Unit] (Minimum Chargeable unit- 05 Units )n 205 RATE TO BE QUOTED FOR LOADING, UNLOADING, COUNTING & STACKING (Rs. Per Unit ) 206 MINIMUM CHARGES PER TRIP FOR LOADING, UNLOADING, COUNTING AND STACKING (Rs. L.S. ) 207 RATE TO BE QUOTED FOR TRANSPORTATION FROM ONE STORE TO ANOTHER STORE FOR DISTANCE SLAB 1 to 30 KMS. (Rs. Per Unit Per Km.)

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 19-Jun-2020 BOQ_CORRIGENDUM BOQ 15-07-2020
2 29-Jun-2020 PREBID Other 15-07-2020

Key Value

Document Fees
INR 7080 /-
EMD
INR 125000.0 /-
Tender Value
INR 21 Crore /-
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail