National Aluminium Company Limited-NALCO has published General Maintenance And Servicing Of Valves In Boiler And Aux . Area Unit 1 To 10 In Cpp , Nalco . . Submission Date for this Tender is 14-07-2020. Kitchen Equipment Tenders in CPP, NALCO, ANGUL Odisha. Bidders can get complete Tender details and download the document.
Name of Work: GENERAL MAINTENANCE AND SERVICING OF VALVES IN BOILER & AUX. AREA UNIT 1 TO 10 IN CPP, NALCO. | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1 | Fabrication & erection of piping upto 25, as per scope of work. | 1 | Meter | |
2 | 2 | Fabrication & erection of piping from 26, as per scope of work. | 1 | Meter | |
3 | 3 | Fabrication & erection of piping from 51, as per scope of work. | 1 | Meter | |
4 | 4 | Fabrication & erection of piping from 77, as per scope of work. | 1 | Meter | |
5 | 5 | Fabrication & erection of piping from 11, as per scope of work. | 1 | Meter | |
6 | 6 | Fabrication & erection of piping from 17, as per scope of work. | 1 | Meter | |
7 | 7 | Fabrication & erection of piping from 25, as per scope of work. | 1 | Meter | |
8 | 8 | Fabrication & erection of piping > 400mm, as per scope of work. | 1 | Meter | |
9 | 9 | Dismantling of piping upto 25 mm, as per scope of work. | 1 | Meter | |
10 | 10 | Dismantling of piping from 26 mm to 50 m, as per scope of work. | 1 | Meter | |
11 | 11 | Dismantling of piping from 51 mm to 76 m, as per scope of work. | 1 | Meter | |
12 | 12 | Dismantling of piping from 77 mm to 110, as per scope of work. | 1 | Meter | |
13 | 13 | Dismantling of piping from 111 mm to 175, as per scope of work. | 1 | Meter | |
14 | 14 | Dismantling of piping from 176 mm to 250, as per scope of work. | 1 | Meter | |
15 | 15 | Dismantling of piping from 251mm to 400m, as per scope of work. | 1 | Meter | |
16 | 16 | Dismantling of piping >400mm, as per scope of work. | 1 | Meter | |
17 | 17 | Erection of piping upto 25 mm, as per scope of work. | 1 | Meter | |
18 | 18 | Erection of piping from 26 mm to 50 mm, as per scope of work. | 1 | Meter | |
19 | 19 | Erection of piping from 51 mm to 76 mm, as per scope of work. | 1 | Meter | |
20 | 20 | Erection of piping from 77 mm to 110 mm, as per scope of work. | 1 | Meter | |
21 | 21 | Erection of piping from 111 mm to 175 mm, as per scope of work. | 1 | Meter | |
22 | 22 | Erection of piping from 176 mm to 250 mm, as per scope of work. | 1 | Meter | |
23 | 23 | Erection of piping from 251 mm to 400 mm, as per scope of work. | 1 | Meter | |
24 | 24 | Erection of piping >400mm, as per scope of work. | 1 | Meter | |
25 | 25 | Carbon steel fillet welding, as per scope of work. | 1 | Meter | |
26 | 26 | Carbon steel butt welding, as per scope of work. | 1 | Meter | |
27 | 27 | Alloy steel/Stainless steel fillet weldi, as per scope of work. | 1 | Meter | |
28 | 28 | Alloy steel/Stainless steel butt welding, as per scope of work. | 1 | Meter | |
29 | 29 | Carbon steel cutting, as per scope of work. | 1 | Meter | |
30 | 30 | Removal of Valve size-15 NB-50 NB, as per scope of work. | 1 | each | |
31 | 31 | Removal of Valve size-65 NB-100 NB, as per scope of work. | 1 | each | |
32 | 32 | Removal of Valve size-125 NB-200 NB, as per scope of work. | 1 | each | |
33 | 33 | Removal of Valve size-250 NB-350 NB, as per scope of work. | 1 | each | |
34 | 34 | Erection of Valve size-15-50 NB, as per scope of work. | 1 | each | |
35 | 35 | Erection of Valve size-65 NB-100 NB, as per scope of work. | 1 | each | |
36 | 36 | Erection of Valve size-125 NB-200 NB, as per scope of work. | 1 | each | |
37 | 37 | Erection of Valve size-250 NB-350 NB, as per scope of work. | 1 | each | |
38 | 38 | Rectification of leakage flange size-15, as per scope of work. | 1 | each | |
39 | 39 | Rectification of leakage flange size-65, as per scope of work. | 1 | each | |
40 | 40 | Rectification of leakage flange size-125, as per scope of work. | 1 | each | |
41 | 41 | Rectification of leakage flange size-250, as per scope of work. | 1 | each | |
42 | 42 | Rectification of leakage flange size-400, as per scope of work. | 1 | each | |
43 | 43 | Cleaning of strainer size-upto 25 NB, as per scope of work. | 1 | each | |
44 | 44 | Cleaning of strainer size-50 NB-100 NB, as per scope of work. | 1 | each | |
45 | 45 | Cleaning of strainer size-150 NB-250 NB, as per scope of work. | 1 | each | |
46 | 46 | Cleaning of strainer size-300 NB-400 NB, as per scope of work. | 1 | each | |
47 | 47 | Erection of equipment-Moving, as per scope of work. | 1 | Metric Tonne | |
48 | 48 | Erection of equipment-Static, as per scope of work. | 1 | Metric Tonne | |
49 | 49 | Dismantling of equipment-Moving, as per scope of work. | 1 | Metric Tonne | |
50 | 50 | Dismantling of equipment-Static, as per scope of work. | 1 | Metric Tonne | |
51 | 51 | Fabrication of structurals, as per scope of work. | 1 | Metric Tonne | |
52 | 52 | Erection of structurals, as per scope of work. | 1 | Metric Tonne | |
53 | 53 | Cleaning of heat exchanger, as per scope of work. | 1 | Square meter | |
54 | 54 | Erection / Fabrication of scaffoldings-I, as per scope of work. | 1 | Meter | |
55 | 55 | Erection / Fabrication of scaffoldings-O, as per scope of work. | 1 | Meter | |
56 | 56 | WSB traverse movement jamming Rectificat, as per scope of work. | 1 | each | |
57 | 57 | WSB Guide rod replacement, as per scope of work. | 1 | Lumpsum per Equipment | |
58 | 58 | WSB Swivel tube replacement, as per scope of work. | 1 | each | |
59 | 59 | WSB Traverse gear box/rotary gear box ov, as per scope of work. | 1 | each | |
60 | 60 | WSB Servicing, as per scope of work. | 1 | each | |
61 | 61 | LRSB Traverse/rotary/travelling carriage, as per scope of work. | 1 | each | |
62 | 62 | APH sootblower gearbox replacement, as per scope of work. | 1 | each | |
63 | 63 | Burner tilt jamming clearing, as per scope of work. | 1 | each | |
64 | 64 | LRSB lance &/or feed pipe replacement, as per scope of work. | 1 | each | |
65 | 65 | Assistance for LRSB operation, as per scope of work. | 1 | each | |
66 | 66 | FD fan bullet casing lifting &fixing, as per scope of work. | 1 | each | |
67 | 67 | Greasing of Audco plug valves, as per scope of work. | 1 | each | |
68 | 68 | Servicing / cleaning of Seal Air/ Scanne, as per scope of work. | 1 | each | |
69 | 69 | Gland packings replacement of valve size, as per scope of work. | 1 | each | |
70 | 70 | Gland packings replacement of valve size, as per scope of work. | 1 | each | |
71 | 71 | Gland packings replacement of valve size, as per scope of work. | 1 | each | |
72 | 72 | Gland packings replacement of valve size, as per scope of work. | 1 | each | |
73 | 73 | Gland packings replacement of valve size, as per scope of work. | 1 | each | |
74 | 74 | Gland packings replacement of valve size, as per scope of work. | 1 | each | |
75 | 75 | Oil gun Repair, as per scope of work. | 1 | each | |
76 | 76 | Oil gun U-clamp Repair/ replacement, as per scope of work. | 1 | each | |
77 | 77 | Oil gun tip removal from vaned diffuser, as per scope of work. | 1 | each | |
78 | 78 | Scanner guide hose Cleaning /Repairing/R, as per scope of work. | 1 | each | |
79 | 79 | Ignitor guide tube Cleaning /Repairing/R, as per scope of work. | 1 | each | |
80 | 80 | ESP field inspection and internal rectif, as per scope of work. | 1 | Lumpsum per Equipment | |
81 | 81 | ESP collecting electrode straightening , as per scope of work. | 1 | Lumpsum per Equipment | |
82 | 82 | ESP shock bar guide rectification, as per scope of work. | 1 | Lumpsum per Equipment | |
83 | 83 | ESP Gear box overhauling, as per scope of work. | 1 | Lumpsum per Equipment | |
84 | 84 | ESP emitting rapping system rectificatio, as per scope of work. | 1 | Lumpsum per Equipment | |
85 | 85 | Transportaion of equipment/material from, as per scope of work. | 1 | Metric Tonne | |
86 | 86 | Servicing of Chain Pulley Bocks upto 2T, as per scope of work. | 1 | each | |
87 | 87 | Servicing of Chain Pulley Bocks Above 2T, as per scope of work. | 1 | each | |
88 | 88 | Servicing of Chain Pulley Bocks above 5T, as per scope of work. | 1 | each | |
89 | 89 | Load testing of Chain pulley Blocks, as per scope of work. | 1 | Metric Tonne | |
90 | 90 | Assistance for overhauling of dewatering, as per scope of work. | 1 | each | |
91 | 91 | Assistance for servicing of Safety valve, as per scope of work. | 1 | each | |
92 | 92 | Assistance for servicing of Safety valve, as per scope of work. | 1 | each | |
93 | 93 | Assistance for Safety valve stem and dis, as per scope of work. | 1 | each | |
94 | 94 | Assistance for servicing of high pressu, as per scope of work. | 1 | each | |
95 | 95 | Assistance for servicing of high pressu, as per scope of work. | 1 | each | |
96 | 96 | Assistance for gauge glass assy. Replac, as per scope of work. | 1 | each | |
97 | 97 | Assistance for lifting by chain pulley, as per scope of work. | 1 | each | |
98 | 98 | Assistance for lifting by chain pulley, as per scope of work. | 1 | each | |
99 | 99 | Assistance for servicing of HFO/LDO tra, as per scope of work. | 1 | each | |
100 | 100 | Assistance for servicing of HFO/LDO Unl, as per scope of work. | 1 | each | |
101 | 101 | Assistance for machining reconditioning, as per scope of work. | 1 | Lumpsum per Equipment | |
102 | 102 | Assistance for alignment of FD/PA/ID fan, as per scope of work. | 1 | each | |
103 | 103 | Assistance for store/office/house keepin, as per scope of work. | 1 | each | |
104 | 104 | Assistanace for boiler hydraulic test, as per scope of work. | 1 | each | |
105 | 105 | Servicing of dewatering sump pump, as per scope of work. | 1 | each | |
106 | 106 | Luboil pump oil seal/ mechanical seal re, as per scope of work. | 1 | each | |
107 | 107 | Luboil pump coupling rectification/ repl, as per scope of work. | 1 | each | |
108 | 108 | Oil Tank & Filter Cleaning of PA/FD Fan, as per scope of work. | 1 | Lumpsum per Equipment | |
109 | 109 | Application of painting Paint supplied, as per scope of work. | 1 | Square meter | |
110 | 110 | Application of painting, as per scope of work. | 1 | Square meter | |
111 | 111 | Safety valve servicing /Stem and disc , as per scope of work. | 1 | each | |
112 | 112 | Gauge glass assy. repair/replacement, as per scope of work. | 1 | each | |
113 | 113 | Servicing/ O/H of HFO/LDO transfer pump, as per scope of work. | 1 | each | |
114 | 114 | Replacement of port in drum level gauge, as per scope of work. | 1 | each | |
115 | 115 | Overhauling of bridge trolley 10T, as per scope of work. | 1 | each | |
116 | 116 | Overhauling of bridge trolley 15 T, as per scope of work. | 1 | each | |
117 | 117 | Cleaning of hanger support of boiler pip, as per scope of work. | 1 | each | |
118 | 118 | Servicing of safety valve upto 2", as per scope of work. | 1 | each | |
119 | 119 | Servicing of 1" actuator operated valve, as per scope of work. | 1 | each | |
120 | 120 | Servicing of 1 1/2" actuator operated va, as per scope of work. | 1 | each | |
121 | 121 | Servicing of 2" actuator operated valve, as per scope of work. | 1 | each | |
122 | 122 | Servicing of 65 nb actuator operated val, as per scope of work. | 1 | each | |
123 | 123 | Servicing of 80 nb actuator operated val, as per scope of work. | 1 | each | |
124 | 124 | Servicing of 100 nb actuator operated va, as per scope of work. | 1 | each | |
125 | 125 | Servicing of 150 nb actuator operated va, as per scope of work. | 1 | each | |
126 | 126 | Servicing of 200 nb actuator operated va, as per scope of work. | 1 | each | |
127 | 127 | Servicing of 250 nb actuator operated va, as per scope of work. | 1 | each | |
128 | 128 | Servicing of 350 nb actuator operated va, as per scope of work. | 1 | each | |
129 | 129 | Servicing of 1/2 " hand operated valve, as per scope of work. | 1 | each | |
130 | 130 | Servicing of 1 " hand operated valve, as per scope of work. | 1 | each | |
131 | 131 | Servicing of 1 1/2 " hand operated valve, as per scope of work. | 1 | each | |
132 | 132 | Servicing of 2 " hand operated valve, as per scope of work. | 1 | each | |
133 | 133 | Servicing of 65 nb hand operated valve, as per scope of work. | 1 | each | |
134 | 134 | Servicing of 80 nb hand operated valve, as per scope of work. | 1 | each | |
135 | 135 | Servicing of 100 nb hand operated valve, as per scope of work. | 1 | each | |
136 | 136 | Servicing of 150 nb hand operated valve, as per scope of work. | 1 | each | |
137 | 137 | Servicing of 200 nb hand operated valve, as per scope of work. | 1 | each | |
138 | 138 | Servicing of 250 nb hand operated valve, as per scope of work. | 1 | each | |
139 | 139 | Servicing of 350 nb hand operated valve, as per scope of work. | 1 | each | |
140 | 140 | Servicing of 400 nb hand operated valve, as per scope of work. | 1 | each | |
141 | 141 | Servicing of 25 nb - 100 nb sc nrv, as per scope of work. | 1 | each | |
142 | 142 | Servicing of .150 nb - 250 nb sc nrv, as per scope of work. | 1 | each | |
143 | 143 | Servicing of 300 nb - 450 nb sc nrv, as per scope of work. | 1 | each | |
144 | 144 | Servicing of control valve-4", as per scope of work. | 1 | each | |
145 | 145 | Servicing of control valve-6", as per scope of work. | 1 | each | |
146 | 146 | Servicing of control valve-2", as per scope of work. | 1 | each | |
147 | 147 | Servicing of control valve-1.5 ", as per scope of work. | 1 | each | |
148 | 148 | Servicing of control valve-10", as per scope of work. | 1 | each | |
149 | 149 | Servicing of SBV head assembly, as per scope of work. | 1 | each | |
150 | 150 | Servicing of 15 nb trap, as per scope of work. | 1 | each | |
151 | 151 | Servicing of 25 nb trap, as per scope of work. | 1 | each | |
152 | 152 | Gland tightening of valve size upto 1", as per scope of work. | 1 | each | |
153 | 153 | Gland tightening of valve size > 1" to 4, as per scope of work. | 1 | each | |
154 | 154 | Gland tightening of valve size >6", as per scope of work. | 1 | each | |
155 | 155 | Replacement/Servicing of oil coolers of, as per scope of work. | 1 | each | |
156 | 156 | Replacement/Servicing of Bearing assy of, as per scope of work. | 1 | each | |
157 | 157 | Inspection of Air Preheater, as per scope of work. | 1 | each | |
158 | 158 | Air Preheater cleaning, as per scope of work. | 1 | each | |
159 | 159 | Air preheater drive coupling servicing, as per scope of work. | 1 | each | |
160 | 160 | Air preheater drive coupling /or clutch, as per scope of work. | 1 | each | |
161 | 161 | Air motor / or replacement, as per scope of work. | 1 | each | |
162 | 162 | Air motor servicing, as per scope of work. | 1 | each | |
163 | 163 | Attending fan damper jamming, as per scope of work. | 1 | each | |
164 | 164 | LOP servicing, as per scope of work. | 1 | each |