Replacement Of Lt Panel Board At Pocket-52 Cr Park Bps . , Lt Distribution Panel Sheet Steel Enclosure Made Out Of 2Mm Crca Sheet Totally Enclosed , Powder Coated Free Standing , Floor Mounted Type , Dust& Vermin Proof , Outward Opening , Lockable Doors Having Hidden Hinges And A Bolted Back Cover Both Using Non-Deteriorating Neoprene Rubber Gaskets To Provide Ip-54 Protection . The Each Part Of The Fabricated Panel Will Be Strictly Subjected To Seven Tank Treatment . The Various Components , Assemblies And Sub Equipments Of The Panel Will Be As Per Standard Given In Relevant Is . The Bus Bar Of The Panel Will Be Shaped Out Of High Conductivity , Electrolytic Conductor And Shall Be Liberal Sized In Aluminium . The Control Wiring Of The Panel Will Be Done With Pvc Flexible Copper Wires Of 1 . 5Mm Cross Section . Each Wire Will Be Terminating With A Ferule Crimped To The Wire , Size 1800Mm X1600x375mm . Having Following Components Of Approved Make: L&T / Siemens / Epcos / Ae / Havells . , Mccb 415V , Tp 3Phase High Breaking Capacity 50Ka 50Hz , 200Ampwith Spreader& Handle . , Mccb 415V , Tp 3Phase High Breaking Capacity 50Ka 50Hz , 100Amp With Spreader . , Mcb Single Pole 6Amp . , Mcb Triple Pole 32Amp , Mcb Triple Pole 63Amp , Pvc Insulated Copper Flexible Cable Single Core 16Sq . Mm Make: Havells / Finolex , Power Capacitors 415V Unit Of 10Kvar Make: Epcos / L&T , Over Load Relay 20-33 . , Over Load Relay 6-10 Amp Range Make: L&T / Siemens , Amp . Meter Digita . , Volt Meter Digital . , Motor Protection Relay . , Power Contactor 220V 3Phase70amp . , Power Contactor 220V 3Phase50amp . , Power Contactor 220V 3Phase25amp . , Star Delta Timer On Delay . , Indicating Lights Led Type Ryb& On / Off . , Current Transformer200 / 5 , 100 / 5 , 30 / 5 Make Ae / Advance , On Load Change Over Switch 200Amp . Open Execution Type . , Fitting Of The Above Components In Panel Enclosure With Terminal Blocks , Channels , Ferrules , Thimble , Support Insulator On Bus Bar , Required Hard Wares , Control Wiring In 1 . 5Sq Mm Wire Complete In All Respect . , Dismantling Of Old Panel , Structure , Damaged Components And Installation Of The Panel At Site By Making Foundation , Termination Of Cable Both Incoming & Out Going Side , Mongeringof Complete Panel , Including Cable Connection , . This Includes Cartage , Loading& Unloading Etc . , Testing & Commissioning Of The Panel With Relevant Is As Follow: - Check Equipments Specification - Continuity And Earthing -Mccb Mechanism And Alignment -Meggaring Of All Equipments For Phase To Phase , Neutral To Body , Neutral To Earth And Phase To Earth . - All Functional Tests -Checking For All Tightness Of Nuts And Bolts -Alignments Of Doors Etc . -Interlocking Tests