Water Resources and Irrigation Local Bodies Closing in 0 days TDR #24602013

Annual Maintenance Of Wss To North Paravur Municipality For The Year 2020 21

Issued by Local Bodies · North paravur, Kerala
Tender Value
11.58 Lakhs
Estimated cost
Bid Submission
22 Jun 2020
0 days left
EMD
29000
Bank guarantee accepted
Document Fee
2500
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
North paravur → Kerala
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Annual Maintenance Of Wss To North Paravur Municipality For The Year 2020 21

BOQ

Name of Work: Annual maintenance of W.S.S. to North Paravur Municipality for the year 2020-21.
Sl.No.Item DescriptionItem Code / MakeQuantityUnits
11Working chargesBI01010001010000000000000515BI0100001112
21.01Supply of Lead WoolBI01010001010000000000000515BI010000111360Kg
31.02Supply of HempBI01010001010000000000000515BI010000111415Kg
41.03Leak rectification work in 63 mm PVC (Class 2 to 6) pipe line including detecting and locating leak, earth work excavation in all kinds of soil for for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically perpendicular to the axis of pipe line with out causing any damages to the remaining portion, dismantling and lifting the pipe from trenches, smoothening the cut ends, conveying the new pipe to the site, cutting and lowering new pipe in to the trenches,placing in position aligning the pipe to line and level and jointing the new pipe with the existing pipe with solvent cement or or any available joint and testing the pipe line by operating the valves concerned, and rectifying the defects if noticed and without causing any damages to the existing utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards,lighting,watching, ribbon fencing, traffic controlling etc.complete as per the direction of Departmental officers including the cost of PVC specials; but excluding the cost of PVC Pipes and PVC specials shall be of good quality and conforming to relevant standards: All Socketed JointingBI01010001010000000000000515BI010000111550Leak
51.04Leak rectification work in 75 mm PVC (Class 2 to 6) pipe line including detecting and locating leak, earth work excavation in all kinds of soil for for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically perpendicular to the axis of pipe line with out causing any damages to the remaining portion, dismantling and lifting the pipe from trenches, smoothening the cut ends, conveying the new pipe to the site, cutting and lowering new pipe in to the trenches,placing in position aligning the pipe to line and level and jointing the new pipe with the existing pipe with solvent cement or or any available joint and testing the pipe line by operating the valves concerned, and rectifying the defects if noticed and without causing any damages to the existing utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards,lighting,watching, ribbon fencing, traffic controlling etc.complete as per the direction of Departmental officers including the cost of PVC specials; but excluding the cost of PVC Pipes and PVC specials shall be of good quality and conforming to relevant standards; PVC Pipes and specials shall be of good quality and conforming to relevant standards: All Socketed Jointing.BI01010001010000000000000515BI010000111690Leak
61.05Leak rectification work in 90 mm PVC (Class 2 to 6) pipe line including detecting and locating leak, earth work excavation in all kinds of soil for for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically perpendicular to the axis of pipe line with out causing any damages to the remaining portion, dismantling and lifting the pipe from trenches, smoothening the cut ends, conveying the new pipe to the site, cutting and lowering new pipe in to the trenches,placing in position aligning the pipe to line and level and jointing the new pipe with the existing pipe with solvent cement or or any available joint and testing the pipe line by operating the valves concerned, and rectifying the defects if noticed and without causing any damages to the existing utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards,lighting,watching, ribbon fencing, traffic controlling etc.complete as per the direction of Departmental officers including the cost of PVC specials; but excluding the cost of PVC Pipes and PVC specials shall be of good quality and conforming to relevant standards: All Socketed Jointing.BI01010001010000000000000515BI0100001117120Leak
71.06Leak rectification work in 90 mm PVC (Class 2 to 6) pipe line including detecting and locating leak, earth work excavation in all kinds of soil for for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically perpendicular to the axis of pipe line with out causing any damages to the balance portion, dismantling and lifting the pipe from trenches, smoothening the cut ends, conveying the new pipe, cutting and lowering new pipe in to the trenches,placing in position aligning the pipe to line and level and jointing the new pipe with the existing pipe with solvent cement or repairable joint and testing the pipe line by operating the valves concerned, and rectifying the defects if noticed and refilling the trenches in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site without causing any damages to the existing utilities, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards,lighting, ribbon fencing, watching, traffic control etc.complete as per the direction of Departmental officers, including the cost of specials but excluding the cost of CIR Joints & PVC Pipes and PVC specials shall be of good quality and conforming to relevant standards: Socket & CIR JointingBI01010001010000000000000515BI010000111875Leak
81.07Leak rectification work in 110 mm PVC (Class 2 to 6) pipe line including detecting and locating leak, earth work excavation in all kinds of soil for for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically perpendicular to the axis of pipe line with out causing any damages to the balance portion, dismantling and lifting the pipe from trenches, smoothening the cut ends, conveying the new pipe, cutting and lowering new pipe in to the trenches,placing in position aligning the pipe to line and level and jointing the new pipe with the existing pipe with solvent cement or repairable joint and testing the pipe line by operating the valves concerned, and rectifying the defects if noticed and refilling the trenches in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site without causing any damages to the existing utilities, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards,lighting, ribbon fencing, watching, traffic control etc.complete as per the direction of Departmental officers, including the cost of specials but excluding the cost of CIR Joints & PVC Pipes and specials shall be of good quality and conforming to relevant standards: Socket & CIR JointingBI01010001010000000000000515BI010000111910Leak
91.08Leak rectification work in 110 mm PVC (Class 2 to 6) pipe line including detecting and locating leak, earth work excavation in all kinds of soil for for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically perpendicular to the axis of pipe line with out causing any damages to the balance portion, dismantling and lifting the pipe from trenches, smoothening the cut ends, conveying the new pipe, cutting and lowering new pipe in to the trenches,placing in position aligning the pipe to line and level and jointing the new pipe with the existing pipe with solvent cement or repairable joint and testing the pipe line by operating the valves concerned, and rectifying the defects if noticed and refilling the trenches in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site without causing any damage to the existing utilities, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, ribbon fencing, lighting,watching, traffic control etc.complete as per the direction of Departmental officers, including the specials but excluding the cost of CIR Joints,pvc pipe; PVC specials shall be of good quality and conforming to relevant standards: CIR Jointing.BI01010001010000000000000515BI010000112015leak
101.09Repairing leakage/breakage of 80 mm AC pipe line by cutting and dismantling the damaged pipe portion (up to 1.5 m) including charges for earth work excavation in all kinds of soil including tar / concrete cutting for exposing leak portion of the pipe, operating control valves if any, conveying to the site and cutting new AC pipe to the required length, rejointing the pipeline using CID Joints , testing the pipe line by operating the valves concerned, and rectifying the defects any noticed and without causing any damages to the existing utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, lighting, watching, ribbon fencing, traffic controlling etc.complete as per the direction of Departmental officers excluding the cost of pipe and CID Joints.BI01010001010000000000000515BI01000011211leak
111.1Repairing leakage/breakage of 100 mm AC pipe line by cutting and dismantling the damaged pipe portion (Up to 1.5 m) including charges for earth work excavation in all kinds of soil including tar / concrete cutting for for exposing leak portion of the pipe, operating control valves if any, conveying to the site and cutting new AC pipe to the required length, rejointing the pipeline using CID Joints , testing the pipe line by operating the valves concerned, and rectifying the defects any noticed and without causing any damages to the existing utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, lighting, watching, ribbon fencing, traffic controlling etc.complete as per the direction of Departmental officers excluding the cost of pipe and CID Joints.BI01010001010000000000000515BI01000011222leak
121.11Repairing leakage/breakage of 150 mm AC pipe line by cutting and dismantling the damaged pipe portion (Up to 1.5 m) including charges for earth work excavation in all kinds of soil including tar / concrete cutting for for exposing leak portion of the pipe, operating control valves if any, conveying to the site and cutting new AC pipe to the required length, rejointing the pipeline using CID Joints , testing the pipe line by operating the valves concerned, and rectifying the defects any noticed and without causing any damages to the existing utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, lighting, watching, ribbon fencing, traffic controlling etc.complete as per the direction of Departmental officers excluding the cost of pipe and CID Joints.BI01010001010000000000000515BI01000011233Leak
131.12Repairing leakage/breakage of 200 mm AC pipe line by cutting and dismantling the damaged pipe portion (Up to 1.5 m) including charges for earth work excavation in all kinds of soil including tar / concrete cutting for for exposing leak portion of the pipe, operating control valves if any, conveying to the site and cutting new AC pipe to the required length, rejointing the pipeline using CID Joints , testing the pipe line by operating the valves concerned, and rectifying the defects any noticed and without causing any damages to the existing utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, lighting, watching, ribbon fencing, traffic controlling etc.complete as per the direction of Departmental officers excluding the cost of pipe and CID Joints.BI01010001010000000000000515BI01000011242Leak
141.13Repairing leakage/breakage of 250 mm AC pipe line by cutting and dismantling the damaged pipe portion (Up to 1.5 m) including charges for earth work excavation in all kinds of soil including tar / concrete cutting for for exposing leak portion of the pipe, operating control valves if any, conveying to the site and cutting new AC pipe to the required length, rejointing the pipeline using CID Joints , testing the pipe line by operating the valves concerned, and rectifying the defects any noticed and without causing any damages to the existing utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, lighting, watching, ribbon fencing, traffic controlling etc.complete as per the direction of Departmental officers excluding the cost of pipe and CID Joints.BI01010001010000000000000515BI01000011251Leak
151.14Repairing leakage/breakage of 300 mm AC pipe line by cutting and dismantling the damaged pipe portion (Up to 1.5 m) including charges for earth work excavation in all kinds of soil including tar / concrete cutting for for exposing leak portion of the pipe, operating control valves if any, conveying to the site and cutting new AC pipe to the required length, rejointing the pipeline using CID Joints , testing the pipe line by operating the valves concerned, and rectifying the defects any noticed and without causing any damages to the existing utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, lighting, watching, ribbon fencing, traffic controlling etc.complete as per the direction of Departmental officers excluding the cost of pipe and CID Joints.BI01010001010000000000000515BI01000011261Leak
161.15Repairing leakage/breakage of 350 mm AC pipe line by cutting and dismantling the damaged pipe portion (Up to 1.5 m) including charges for earth work excavation in all kinds of soil including tar / concrete cutting for for exposing leak portion of the pipe, operating control valves if any, conveying to the site and cutting new AC pipe to the required length, rejointing the pipeline using CID Joints , testing the pipe line by operating the valves concerned, and rectifying the defects any noticed and without causing any damages to the existing utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, lighting, watching, ribbon fencing, traffic controlling etc.complete as per the direction of Departmental officers excluding the cost of pipe and CID Joints.BI01010001010000000000000515BI01000011271Leak
171.16Repairing leakage/breakage of 80 mm AC pipe line by cutting and dismantling the damaged pipe portion (Up to 3.0 m) including charges for earth work excavation in all kinds of soil including tar / concrete cutting for for exposing leak portion of the pipe, operating control valves if any, conveying to the site and cutting new AC pipe to the required length, rejointing the pipeline using CID Joints , testing the pipe line by operating the valves concerned, and rectifying the defects any noticed and without causing any damages to the existing utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, lighting, watching, ribbon fencing, traffic controlling etc.complete as per the direction of Departmental officers excluding the cost of pipe and CID Joints.BI01010001010000000000000515BI01000011281Leak
181.17Repairing leakage/breakage of 100 mm AC pipe line by cutting and dismantling the damaged pipe portion (Up to 3.0 m) including charges for earth work excavation in all kinds of soil including tar / concrete cutting for for exposing leak portion of the pipe, operating control valves if any, conveying to the site and cutting new AC pipe to the required length, rejointing the pipeline using CID Joints , testing the pipe line by operating the valves concerned, and rectifying the defects any noticed and without causing any damages to the existing utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, lighting, watching, ribbon fencing, traffic controlling etc.complete as per the direction of Departmental officers excluding the cost of pipe and CID Joints.BI01010001010000000000000515BI01000011292Leak
191.18Repairing leakage/breakage of 150 mm AC pipe line by cutting and dismantling the damaged pipe portion (Up to 3.0 m) including charges for earth work excavation in all kinds of soil including tar / concrete cutting for for exposing leak portion of the pipe, operating control valves if any, conveying to the site and cutting new AC pipe to the required length, rejointing the pipeline using CID Joints , testing the pipe line by operating the valves concerned, and rectifying the defects any noticed and without causing any damages to the existing utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, lighting, watching, ribbon fencing, traffic controlling etc.complete as per the direction of Departmental officers excluding the cost of pipe and CID Joints.BI01010001010000000000000515BI01000011303Leak
201.19Repairing leakage/breakage of 200 mm AC pipe line by cutting and dismantling the damaged pipe portion (Up to 3.0 m) including charges for earth work excavation in all kinds of soil including tar / concrete cutting for for exposing leak portion of the pipe, operating control valves if any, conveying to the site and cutting new AC pipe to the required length, rejointing the pipeline using CID Joints , testing the pipe line by operating the valves concerned, and rectifying the defects any noticed and without causing any damages to the existing utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, lighting, watching, ribbon fencing, traffic controlling etc.complete as per the direction of Departmental officers excluding the cost of pipe and CID Joints.BI01010001010000000000000515BI01000011311Leak
211.2Repairing leakage/breakage of 250 mm AC pipe line by cutting and dismantling the damaged pipe portion (Up to 3.0 m) including charges for earth work excavation in all kinds of soil including tar / concrete cutting for for exposing leak portion of the pipe, operating control valves if any, conveying to the site and cutting new AC pipe to the required length, rejointing the pipeline using CID Joints , testing the pipe line by operating the valves concerned, and rectifying the defects any noticed and without causing any damages to the existing utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, lighting, watching, ribbon fencing, traffic controlling etc.complete as per the direction of Departmental officers excluding the cost of pipe and CID Joints.\n \n \n\nBI01010001010000000000000515BI01000011322Leak
221.21Repairing leakage/breakage of 300 mm AC pipe line by cutting and dismantling the damaged pipe portion (Up to 3.0 m) including charges for earth work excavation in all kinds of soil including tar / concrete cutting for for exposing leak portion of the pipe, operating control valves if any, conveying to the site and cutting new AC pipe to the required length, rejointing the pipeline using CID Joints , testing the pipe line by operating the valves concerned, and rectifying the defects any noticed and without causing any damages to the existing utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, lighting, watching, ribbon fencing, traffic controlling etc.complete as per the direction of Departmental officers excluding the cost of pipe and CID Joints.BI01010001010000000000000515BI01000011332Leak
231.22Repairing leakage/breakage of 350 mm AC pipe line by cutting and dismantling the damaged pipe portion (Up to 3.0 m) including charges for earth work excavation in all kinds of soil including tar / concrete cutting for for exposing leak portion of the pipe, operating control valves if any, conveying to the site and cutting new AC pipe to the required length, rejointing the pipeline using CID Joints , testing the pipe line by operating the valves concerned, and rectifying the defects any noticed and without causing any damages to the existing utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, lighting, watching, ribbon fencing, traffic controlling etc.complete as per the direction of Departmental officers excluding the cost of pipe and CID Joints.BI01010001010000000000000515BI01000011341Leak
241.23Rectifying the leakages in boring point of public tap connection including earth work excavation in all kinds of soil for exposing the boring point including concrete / tar cutting, dismantling the damaged saddle piece,cutting and removing damaged portion of pipe line,fixing new saddle piece,laying 20/25 mm PVC 10Kg/cm2 pipe in place of damaged portion of pipe and connecting with existing pipe line,testing the line to the required test pressure, rectifying any defects noticed and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, removing the surplus soil from the work site, without causing any damages to any other utilities, including the charges of hire and conveyance of tools, plants and materials to the leak site, bailing out water, lighting, watching, ribbon fencing, caution boards, traffic diversion, including cost of pipe and saddle piece and as per the direction of departmental officers etc. complete.BI01010001010000000000000515BI010000113575leak
251.24Supplying and fixing 15 / 20 mm PVC public tap after dismantling the damaged tap including all cost of materials, labour charges, hire for tools and as per the direction of the department officers etc complete.BI01010001010000000000000515BI010000113660nos
261.25Leak rectification work in sluice valve after dismaniting the same from the valve chamber, cleaning , reconditioning, repacking wherever necessery and refiting the same orginal position including hire for tools cost of bolt and nuts etc.complete 250/200/150mm.BI01010001010000000000000515BI01000011372nos
271.26Leak rectification work in sluice valve after dismaniting the same from the valve chamber, cleaning , reconditioning, repacking wherever necessery and refiting the same orginal position including hire for tools cost of bolt and nuts etc.complete 500mm to 300 mm.BI01010001010000000000000515BI01000011382nos
281.27Fixing gland packing to 250/200/150 CI sluice valve including dismaniting and refitting the top of the valve and cost of gland packing etc.complete.BI01010001010000000000000515BI01000011392nos
291.28Fixing gland packing to 500/400/300 CI sluice valve including dismaniting and refitting the top of the valve and cost of gland packing etc.complete.BI01010001010000000000000515BI01000011402nos
301.29Rectification of joint leakages in 300mm CI Pipe including earth work excavation in all kinds of soil for exposing leaking joint including tar cutting / concrete cutting, without causing any damages to the line and specials, cleaning the joints including raking out the damaged hemp and lead, conveying hemp and lead and providing lead joint after cleaning the joint, charging and testing to the required pressure, rectifying any defects noticed and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, removing the surplus soil from the work site, without causing any damages to any other utilities, including the charges of conveyance and hire for tools and plant, bailing out water, lighting, watching, ribbon fencing, providing caution boards, traffic diversion, including cost of materials and as per the direction of departmental officers etc. complete, but excluding the cost of pig lead.BI01010001010000000000000515BI01000011412leak
311.3Rectification of joint leakages in 500mm CI Pipe including earth work excavation in all kinds of soil for exposing leaking joint including tar cutting / concrete cutting, without causing any damages to the line and specials, cleaning the joints including raking out the damaged hemp and joint, conveying hemp and lead and providing lead joint after cleaning the ends, charging and testing to the required pressure, rectifying any defects noticed and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, removing the surplus soil from the work site, without causing any damages to any other utilities, including the charges of conveyance and hire for tools and plant, bailing out water, lighting, watching, ribbon fencing, providing caution boards, traffic diversion, including cost of materials and as per the direction of departmental officers etc. complete, but excluding the cost of pig lead.BI01010001010000000000000515BI01000011422leak
321.31Rectification of leakages of 150 mm GI Pipes by replacing lengths up to 1.0m including earth work excavation in all kindss of soil for exposing leak portion of the pipe including tar / concrete cutting, by cutting, removing and stacking the damaged portion from the existing line without causing any damages to the remaining portion and specials and conveying and replacing with GI Pipes of suitable size and jointing by thraded coupler and union of suitable size including threading, alignment, laying and jointing to make a water tight joint, testing the line to the required pressure, rectifying any defects noticed and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, removing the surplus soil from the work site, without causing any damages to any other utilities, including the charges hire and conveyance of tools, plant and materials to the leak site, bailing out water, lighting, watching, ribbon fencing, caution boards, traffic diversion, including the cost of specials but excluding cost of pipe and as per the direction of departmental officers etc. complete.BI01010001010000000000000515BI01000011432leak
331.32Rectification of joint leakages in 400mm premoPipe including earth work excavation in all kinds of soil for exposing leaking joint including tar cutting / concrete cutting, without causing any damages to the line and specials, cleaning the joints including raking out the damaged hemp and lead, conveying hemp and lead and providing lead joint after cleaning the joint, charging and testing to the required pressure, rectifying any defects noticed and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, removing the surplus soil from the work site, without causing any damages to any other utilities, including the charges of conveyance and hire for tools and plant, bailing out water, lighting, watching, ribbon fencing, providing caution boards, traffic diversion, including cost of materials and as per the direction of departmental officers etc. complete, but excluding the cost of pig lead.BI01010001010000000000000515BI010000114423leak
341.33Disconnecting water connection from service mains along Asphalt road without causing any damage to the existing line including charges of earth work excavation in all kinds of soil for exposing connection point including tar cutting / conrete cutting, making the disconnection point water tight charging and testing to the required pressure, rectifying any defects noticed and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, removing the surplus soil from the work site, without causing any damages to any other existing utilities, including the charges of hire for tools and plant, conveyance of tools and materials to the leak site, bailing out water, lighting, watching, ribbon fencing, caution boards, traffic diversion but excluding cost of materials and as per the direction of departmental officers etc. complete.BI01010001010000000000000515BI010000114518Dis
351.34Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level: 1:2:4 (cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)BI01010001010000000000000515BI01000011462cum
361.35supply of 400mm premo pipe suit mechanical drum cillarBI01010001010000000000000515BI010000114710Nos

AI Tender Summary

OUR REF NO 24602013
AUTHORITY Local Bodies
TENDER VALUE 11.58 Lakhs
LAST DATE 22-06-2020
Authority
Authority Name Kerala Water Authority
Work Description Annual Maintenance Of Wss To North Paravur Municipality For The Year 2020 21
Basic Detail
Tender No KWA/ WSD/CHN/14/2020-21
Bidding Type Tender
Location
City North paravur
State Kerala
Key Dates
Publish Date 16 Jun 2020
Submission Date 22 Jun 2020
Open Date 24 Jun 2020
Finance
Tender Value 11.58 Lakhs
Tender Fee 2500
EMD 29000
Exemption Not Available
Document List
987A794C-F183-4F95-9AE5-387097FD4D77.html
Tendernotice_1.pdf
Condition142021.pdf
BOQ_516227.xls

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Jun 16, 2020
11:30 IST

Tender Published

Tender notice published.

Completed
Jun 22, 2020
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Jun 24, 2020

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
html

987A794C-F183-4F95-9AE5-387097FD4D77.html

pdf

Tendernotice_1.pdf

pdf

Condition142021.pdf

xls

BOQ_516227.xls

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders