Operation And Comprehensive Mtce Of Ems For Te Bldg And Staff Qtrs At Gurdaspur And Comprehensive Mtce Of Various Group Exchanges Under Sdca Gurdaspur Sh Attending The Defects At Risk And Cost Of Ms Cooledge Engineers New Delhi , General Servicing Of Following Capacity Of Dea Sets Of Different Makes And Models Under Various Exchanges Comprising Of Following Jobs I/C Transportation , Labour Charges & Material Required For Servicing I/C Minor Material Required For Healthyness Of Dg Set Etc . As Reqd . ( I ) Cleaning & Greasing Of The Parts . ( Ii ) Tappet Setting As Per Standard ( Iii ) Fan Belt , Tensioner Pulley And Lever Adjustments . ( Iv ) Tightening Of All The Nuts , Bolts And Clamps . ( V ) Testing & Checking Of Ac & Dc Wiring . ( Vi ) Self & Charging Alternator Cleaning And Testing , Checking Of Working & Minor Fault Removal . ( Vii ) Checking Of Supply & Return Fuel Pipes From Fuel Tank To Engine . ( Viii ) Replacement Of Consumables Like Lub Oil , Diesel Filter , Oil Filter , Filter Element Of Air Cleaner & Coolant ( In Case Of Water Cooled Engines ) . ( Ix ) Checking Of Fip Timing By Fuel Cut Off Method . ( X ) General Servicing I/C Cleaning Of Dg Panel ( Xi ) General Servicing & Complete Cleaning Of Dg Set , 110 Kva , 75 Kva , 50 Kva , 40 Kva , 15 Kva , Providing Maintenance Free New Lead Acid Batteries As A Replacement Of Existing Old Batteries Of Following Types/Rating Complete With First Fill Of Electrolyte & First Charging I/C Replacement Of Leads , Nut Bolts , Terminals/Thimbles Complete As Reqd . ( The Old Batteries Shall Be The Property Of Contractor And Rates Shall Be Quoted Accordingly ) , 12 V , 150 Ah , 12V , 130 Ah , 12V , 26 Ah , Replacement Of Following Defective Accessories In The Existing Dg Sets With New Accessories , Complete As Reqd . [ Dismantled Defective Accessories Shall Belong To Vendor , Credit For Same Has To Be Considered While Quoting Rates . ] , Stop Solinoid 12 Volt ( Engine Shut Off Solenoid ) , Mechanical Type Rpm Cum Hour Meter , Rpm Cum Hour Meter Chain , 12 Volt Electrical Battery Charger I/C Transformer , Rectifier Unit And Filter Circuit Etc . Complete As Reqd . , Oil Pressure Meter , Oil Temperature Meter With Safety , Water Temperature Meter , Starting Key Switch , 100 Amps 4 Pole Mccb 25 Ka , Voltmeter With Selector Switch , Ampere Meter With Selector Switch , Ct Measuring ( Ct Ratio Shall Be Decided By E-In -C As Per Site Requirement ) , Wet Servicing Of Existing 1 . 5Tr/2Tr Window/Split Ac Unit I/C Removing , Cleaning All Components And Filters , Dedusting By High Pressure Air Blower , Washing Condenser , Evaporator I/C Chemical Cleaning ( If Required ) , Refixing , Tightening Electrical Connections , Testing Of Ac Unit , Recording All Parameters In Service Report Etc As Reqd . , Providing And Charging Of R-22 Refrigerant Gas Including Carrying Out Leak Testing Of 1 . 5Tr Split/Wac Ac Units With Nitrogen Gas Including Dismantling Of Machine , Flushing The System , Brazing/Flaring The Leak Points , Vacumising , Purging And Making The System Leak Proof I/C Transportation Of Nitrogen Cylinder , Brazing Kit & Vacuum Pump , Supplying & Charging Of R22 Refrigerant Gas At Site , Reinstallation , Testing & Commissioning Complete Etc As Required . , 1 . 5/2 . 0 Tr , 4 . 5 Tr , Replacement Of Following Capacity Of Existing Old Defective Compressor With New Sealed Compressor /Oem Factory Repaired Compressor I/C Dismantling Of Faulty Compressor , Cutting Refrigerant Piping , Brazing & Making Necessary Addition/Alteration I/C Proper Mounting On Base Plate , Connection Of Suction And Discharge Lines , Leak Test & Charging Refrigerant I/C Testing Etc As Reqd . ( M/S Emerson/Tecumseh/Ss Make ) ( Note- The Firm Shall Submit Test Certificate Or Documentary Proof Towards Purchase Of New/Oem Factory Repaired Compressor . ) The Defective Compressor Shall Be The Property Of Agency & Firm Should Consider Suitable Price Rebate For The Same While Quoting . The Material Under Replacement Shall Be Similar To Existing Defective Material Or As Per Product Directory ) , 1 . 5 Tr , Replacement Of Following Capacity Of Existing Old Defective Compressor With New Sealed Compressor /Oem Factory Repaired Compressor I/C Dismantling Of Faulty Compressor , Cutting Refrigerant Piping , Brazing & Making Necessary Addition/Alteration I/C Proper Mounting On Base Plate , Connection Of Suction And Discharge Lines , Leak Test & Charging Refrigerant I/C Testing Etc As Reqd . ( M/S Emerson/Tecumseh/Ss Make ) ( Note- The Firm Shall Submit Test Certificate Or Documentary Proof Towards Purchase Of New/Oem Factory Repaired Compressor . ) The Defective Compressor Shall Be The Property Of Agency & Firm Should Consider Suitable Price Rebate For The Same While Quoting . The Material Under Replacement Shall Be Similar To Existing Defective Material Or As Per Product Directory ) , 2 . 0 Tr , Replacement Of Following Capacity Of Existing Old Defective Compressor In 9 Tr Package Type Ac Unit With New Sealed Compressor Of Model Cr 52/Cr 57 / Ag5560f I/C Dismantling Of Faulty Compressor , Cutting Refrigerant Piping , Brazing & Making Necessary Addition/Alteration I/C Proper Mounting On Base Plate , Connection Of Suction And Discharge Lines , Leak Test & Charging Refrigerant I/C Testing Etc As Reqd . ( M/S Emerson/Tecumseh/Ss Make ) ( Note- The Firm Shall Submit Test Certificate Or Documentary Proof Towards Purchase Of New/Oem Factory Repaired Compressor . ) The Defective Compressor Shall Be The Property Of Agency & Firm Should Consider Suitable Price Rebate For The Same While Quoting . The Material Under Replacement Shall Be Similar To Existing Defective Material Or As Per Product Directory ) , Replacement Of Following Material For Repairing & Attending Break Down Complaints Of 1 . 5 Tr Wac/Sac Units I/C Dismantling , Connection , Fixing & Testing Etc As Required . ( Note- The Defective Material Shall Be The Property Of Agency & Firm Should Consider Suitable Price Rebate For The Same While Quoting . The Material Under Replacement Shall Be Similar To Existing Defective Material Or As Per Product Directory . , Starting Capacitor ( Metal Body ) Of Rating Suitable For 1 . 5/2 . 0 Tr ( 80/100 Mfd ) ( M/S Epcos/Asian/Ss Make ) , Running Capacitor ( Metal Body ) Of Rating Suitable For 1 . 5/2 . 0 Tr ( M/S Epcos/Asian/Ss Make ) , Repairing Of Control Card Pcb Existing 1 . 5/2 . 0Tr Split Ac Units , Box Type Relay For Window Ac Units . ( M/S Arvind/Ranutrol/Ss Make ) , Selector Switch For Window Ac Units , Blower Fan Motor For Idu Of Split Ac Unit ( M/S Aue/Marathon Ge/National/ Diamond /Ss Make ) , Thermostat ( M/S Danfoss/Indfoss/Arvind/Ss Make , Washable Nylon Air Filter , Replacement/Rewinding Of Existing Condenser Motor Of 1 . 5/2 Tr Split/Window Ac Unit From Workshop Complete With Reinstallation , Testing Etc As Required , 3 Core Flexible Copper Cable 2 . 5 Sq Mm , Replacement Of Following Material For 9 Tr Package Type Ac