| 1 | 1 | CIVIL WORKS | | | |
|---|
| 2 | 1.01 | Providing and laying lean cement concrete 1:4:8 in Sub- base over aprepared sub-grade with coarse and fine aggregate conforming toIS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate radationafter blending to be as per table 600-1, cement content not to beless than 150 kg/ cum, optimum moisture content to be determinedduring trial length construction, concrete strength not to be less than10 Mpa at 7 days, mixed in a batching plant, transported to site, laidwith a paver with electronic sensor, ompacting with 8-10 tonnesvibratory roller, finishing and curing complete as per clause 601, 112of MoRT&H specification including all material, labour, hinery, lighting, guarding and maintenance of diversion. | | 328.35 | CUM |
|---|
| 3 | 1.02 | Providing and laying un-reinforced, plain cement concrete mix with Concrete Mixer & vibrator pavement over a prepared sub base with43 grade cement , coarse and fine aggregate conforming to IS: 383,maximum size of coarse aggregate not exceeding 25 mm, mixed asper approved mix design, laid, spread, compacted and finished in a\ncontinuous operation including provision of contraction, expansion,construction and ngitudinal joints etc including all material, abour,machinery, lighting, guarding and maintenance of diversion. PCC M-20 | | 328.35 | CUM |
|---|
| 4 | 1.03 | Raising circular manhole with circular cover 560mm dia and frame slab to required level including dismantling existing slab, taking out the existing CI frame & cover of manhole and raising it upto ground/ road level, refixing of frame and cover in M15 (1:2:4) concrete all around the frame, including making good the damage, form work, curing, complete as directed by Engineer.\n(Brick work of raising depth of manhole to be paid separately) | | 8 | CUM |
|---|
| 5 | 1.04 | frame slab to required level including dismantling existing slab and\nmanhole wall, taking out the existing CI frame & cover of manhole and lowering it upto ground/ road level, refixing of frame and cover in M15 (1:2:4) concrete all around the frame, including making good themage,form work, curing, complete as directed by Engineer.\n(Dismantling of brick work depth of manhole to be paid separately) | | 8 | EACH |
|---|
| 6 | 1.05 | Supplying & fixing 560mm dia SFRC manhole cover in existing\nmanholes frame complete in all respect as directed by the Engineer.\nHD-20 | | 10 | EACH |
|---|
| 7 | 1.06 | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 50 metres as directed by Engineer.\nDismantling Brick / Tile work\nIn cement mortar | | 10 | EACH |
|---|
| 8 | 1.07 | Brick work with bricks of class designation 75 in foundation andplinth in:Cement mortar 1:4 (1 cement : 4 coarse sand) | | 4 | CUM |
|---|
| 9 | 1.08 | Cement plastering including T&P, scaffolding, material and complete labpour, including cost of water, curing, racking of joints etc. with 12 mm cement plaster of mix:1:4 (1 cement : 4 fine/ coarse sand) | | 20 | SQM |
|---|