Shifting And Overhauling Of 2750Kva Hindustan Brown Bovri Make Transformer To Intake Well Substation Shifting And Overhauling Of 2750Kva Hindustan Brown Bovri Make Transformer To Intake Well Substation , Shifting & Overhauling Of 2750Kva Hindustan Brown Bovri Make Transformer To Intake Well Substation , Disconnection And Transportation Of 2750Kva Hindustan Brown Boveri Make Transformer From Thermal PlantTo Intake Well S/S:The Scope Of Work Includes Disconnection Of Cables On Ht/Mv Side , Bus & Bus Trunking On Lt Side , Control Cables , Earth Cables /Strips , Removing The Foundation Locks Of 2750 Kva Transformer , Leading , Lifting , Loading , Transporting And Erecting The Same At Intake Well Substation Located At Fact-Cd Township . The Transformer Shall Be Tied Firmly With Vehicle Using Chain Pulleys Etc . The Contractor Shall Take All Necessary Precautions To Ensure That No Damage Is Occured To The Transformer During Handling Or Transportation . Minor Civil Works And Clearing Of Passages For The Smooth Leading Of Transformer At Thermal Plant And At Intake Well Substation Are Under The Scope Of Contractor . , Overhauling And Testing Of 2750 Kva Hindustan Brown Boveri Make Transformer:The Scope Of Work Includes Draining Out The Existing Oil , Dismantling All Integrals , Opening The Top Cover , Cleaning TheAssembly , Checking The Brazing Joints , Connections Etc , Flushing The Tank And Radiators By Using New Oil , Replacing All Gaskets And Seals With New Ones ( Grade Rc 70C Conforming To Is 4253 ) , Painting The Transformer AndAccessories After Necessary Surface Preparation With Two Coats Of Epoxy Paint Of Identical Colour Over A Coat OfSuitable Primer , Assembling The Integrals , Providing New Breather With The Same Capacity , Filling The Tank And Topping Up The Transformer Up To The Required Conservator Level With New Oil , Providing New Terminal Box At 440 V Side , Testing The Transformer As Per Is For All The Routine Tests , Etc . New Transformer Oil Required For Cleaning The Tank And Other Assemblies And For Topping Up The Transformer ( Approximately 2400 Litres Of Oil ) Will Be Supplied By Fact Free Of Cost . . All Other Materials Required For The Work Such As Gaskets , Paint , Primer , Breather , Nuts , Bolts , Washers Etc . Shall Be Supplied By The Contractor . Vehicle For The To And Fro Transportation Of Oil Shall Be Arranged By Contractor . However The Forklift For Loading / Unloading The Transformer Oil Shall Be Arranged By Fact Free Of Cost Subject To Availability . The Contractor Shall Furnish All The Test Report To Fact . Drained Oil Shall Be Transported To Fact-Cd Phase1 Scrap Yard , Installation , Connection And Commissioning Of 2750 KvaTransformer . The Scope Of Work Includes Leading The Transformer To The Bay Using Guides , Fixing And Positioning On The FoundationLocks . The Scope Of Work Shall Also Include Reconnection Of 3X300/400 Cable On Ht& Mv Sides Using Proper End Termination Kits , All Control & Earth Cables / Strips , Cleaning The Work Site , Charging And Commissioning , All Nut , Bolts And Washers Must Be Replaced By New One . All Tools And Tackles Required For The Work Shall Be Brought By TheContractor . The Material Like Cable Lugs , Cable Glands Etc Shall Be Supplied By The Contractor . All The Civil/MechanicalWorks Including The Necessary Materials Required For The Successful Completion Of The Work Shall Be Under The Scope Of Contractor . Minor Civil Works On The Damaged Walls/Floors While Leading The Transformer Shall Be Arranged By TheContractor . , End Termination Of Following Size Of Cable11Kv , 3 X 300 Sq . Mm Xlpe . The Scope Of Work Includes Supply Of Suitable Sized End Termination Kit Also , End Termination Of The Following Sizes Of Cables3 . 3 Kv 3 X 240 Sq . Mm Pvc Cable , Fabrication And Supply Of Lt Cable Terminal Box:The Scope Of Work Includes Fabrication; And Supply Of600X600x300 Mm M . S Terminal Box . The Thickness Of The Sheet Shall Not Be Less Than 3 Mm . And The Box Shall BeNeatly Painted . , Disconnection , Leading , Loading , Transporting And Unloading The Kirloskar Make 1600 Kva 11/3 . 3KvTransformer From Intake Well Pump Substation To Thermal Plant . The Scope Of Work Includes Disconnection Of Power & Control Cables , Earth Cables /Strips , Leading The Transformer To Out Side Of The Bay Using Guides After Removing Foundation Locks , Lifting And Loading The Transformer To The Vehicle Arranged By Contractor . The Transformer Shall Be Tied Firmly With Vehicle Using Chain Pulleys Etc . The Scope Of Work Shall Also Include Minor Civil Works If Any For Transporting To The Thermal Plant And Unloading At Site , Leading The Transformer To The Bay Using Guides , Fixing And Positioning To The Foundation Locks . Clearing The Passage From Transformer Bay To The Vehicle Shall Be In Contractors Scope . The Contractor Should Take All Necessary Precautions To Ensure That No Damage Is Occured To The Transformer During Handling Or Transportation . The Power And Control Circuit Terminations ( Hv & Mv ) Need Not Be Connected . All Tools And Tackles Required For The Work Shall Be Brought By The Contractor .