Procurement Of Ups For Sg And Swrdc
Tender Overview
Project Description
Procurement Of Ups For Sg And Swrdc , Supplying , Testing And Commissioning Of 10 Kva Online Ups With Minimum 86400 Vah And Backup Time 240 Minutes . The Ups , Snmp Card , External Charger , And Batteries Shall Suitable For Insulated Gate Bipolar Transistors-Pulse Width Modulation ( Igpt-Pwm ) . The Ups Shall Support Sine Wave Three Phase Input And Single Phase Output . The Cost Including Gst , Input And Output Cable , Rack , Transportation , Testing And Commissioning Etc . , Complete Complying With Standard Specification And As Directed By The Departmental Officers . Comprehensive Warranty: 3 Years , Supplying , Testing And Commissioning Of 6 Kva Online Ups With Minimum 38400 Vah And Backup Time 240 Minutes . The Ups , Snmp Card , External Charger , And Batteries Shall Suitable For Insulated Gate Bipolar Transistors-Pulse Width Modulation ( Igpt-Pwm ) . The Ups Shall Support Sine Wave Three Phase Input And Single Phase Output . The Cost Including Gst , Input And Output Cable , Testing And Commissioning Etc . , Complete Complying With Standard Specification And As Directed By The Departmental Officers . Comprehensive Warranty: 3 Years , Supplying , Testing And Commissioning Of 1 Kva Line Interactive Ups With Minimum 1440 Vah . The Ups And Batteries Shall Suitable For Metal-Oxide Semiconductor Field Effect Transistor-Pulse Width Modulation ( Mosfet-Pwm ) . The Ups Shall Support Quasi Sine Wave Single Phase Input And Single Phase Output . The Cost Including , Gst , Transportation , Testing And Commissioning Etc . , Complete Complying With Standard Specification And As Directed By The Departmental Officers . Comprehensive Warranty: 3 Years , Buy Back Value Of Following Old Obsolete Items , 12V , 100 Ah Battery , 10 Kva Ups , Racks , External Charger
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 27-Jun-2020 | Pre Bid queries and clarifications | Technical Bid | 13-Jul-2020 |
| 2 | 03-Jul-2020 | Technical Responsiveness form | Technical Bid | 13-Jul-2020 |
| 3 | 13-Jul-2020 | Extension of Due dates | Date | 22-Jul-2020 |
| 4 | 22-Jul-2020 | Extension of Due Dates | Date | 03-Aug-2020 |
| 5 | 03-Aug-2020 | Extension of Due dates 1 | Date | 07-Aug-2020 |
BOQ
| Name of Work: Procurement of UPS for SG&SWRDC. | |||||
|---|---|---|---|---|---|
| Line ItemNo | Description of Goods/ Related Services | Item Code / Make | Quantity | Physical unit | |
| 1 | 1 | Supplying, testing and commissioning of 10 Kva online UPS with minimum 86400 VAH and backup time 240 Minutes. The UPS, SNMP Card, External charger, and Batteries shall suitable for Insulated Gate Bipolar Transistors-Pulse Width Modulation (IGPT-PWM). The UPS shall support sine wave three phase input and single phase output. The cost including GST, input and output cable, Rack, transportation, testing and commissioning etc., Complete complying with standard specification and as directed by the Departmental officers. Comprehensive warranty: 3 Years | BI01010001010000000000000515BI0100001113 | 1 | No |
| 2 | 2 | Supplying, testing and commissioning of 6 Kva online UPS with minimum 38400 VAH and backup time 240 Minutes. The UPS, SNMP Card, External charger, and Batteries shall suitable for Insulated Gate Bipolar Transistors-Pulse Width Modulation (IGPT-PWM). The UPS shall support sine wave three phase input and single phase output. The cost including GST, input and output cable, testing and commissioning etc., Complete complying with standard specification and as directed by the Departmental officers. Comprehensive warranty: 3 Years | 3 | Nos | |
| 3 | 3 | Supplying, testing and commissioning of 1 Kva Line Interactive UPS with minimum 1440 VAH. The UPS and Batteries shall suitable for metal-oxide semiconductor field effect transistor-Pulse Width Modulation (MOSFET-PWM). The UPS shall support Quasi sine wave single phase input and single phase output. The cost including, GST, transportation, testing and commissioning etc., Complete complying with standard specification and as directed by the Departmental officers. Comprehensive warranty: 3 Years | 48 | Nos | |
| 4 | 4 | Buy back value of following old obsolete items | |||
| 5 | 4.01 | 12V, 100 AH Battery | 32 | Nos | |
| 6 | 4.02 | 10 Kva UPS | 1 | No | |
| 7 | 4.03 | Racks | 2 | Nos | |
| 8 | 4.04 | External Charger | 1 | No |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-2 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-3 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-4 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-5 Issued
Clarifications on tender conditions and amendments issued.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender