| 1 | Construction of box drain from 80ft road to H.No.1 9 1286 A 2 1 at Sri Rama colony, Hanamkonda in W. | As per SSR | 538.20 | Kgs | 66.37 | 35720.40 |
| Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) Fe 500 grade as per IS 1786-1979) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG etc,. Complete. |
| 2 | Construction of box drain from 80ft road to H.No.1 9 1286 A 2 1 at Sri Rama colony, Hanamkonda in W. | As per SSR | 5.70 | Cum | 6516.16 | 37142.11 |
| R.C.C grade M 20 (Design Mix) using 20 mm Graded Metal (MORTH), from the approved quarry, including coat and Conveyance of all materials and all labour charges etc,. Complete. |
| 3 | Construction of box drain from 80ft road to H.No.1 9 1286 A 2 1 at Sri Rama colony, Hanamkonda in W. | As per SSR | 9.72 | Cum | 5459.75 | 53068.77 |
| Plain Cement Concrete nominal mix (1:2:4) proportion (cement: fine aggregate: Coarse aggregate) using 20mm size Hard Broken Granite (IS383, 1970) Machine Crushed graded metal from from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including seigniorage charges, sales & other taxes on all materials, all operational, incidental and labour charges such as mixing, laying, curing concrete, etc., complete for finished item of work ( Vent Portion (0.025+0.05)/2 ) |
| 4 | Construction of box drain from 80ft road to H.No.1 9 1286 A 2 1 at Sri Rama colony, Hanamkonda in W. | As per SSR | 88.20 | Cum | 6005.73 | 529705.39 |
| Plain Cement Concrete nominal mix (1:2:4) proportion (cement: fine aggregate: Coarse aggregate) using 20mm size Hard Broken Granite (IS383, 1970) Machine Crushed graded metal from from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including seigniorage charges, sales & other taxes on all materials, all operational, incidental and labour charges such as mixing, laying, curing concrete, etc., complete for finished item of work ( Walls ) |
| 5 | Construction of box drain from 80ft road to H.No.1 9 1286 A 2 1 at Sri Rama colony, Hanamkonda in W. | As per SSR | 23.85 | Cum | 4320.16 | 103035.82 |
| Providing Plain Cement Concrete (1:4:8) mix using 40mm nominal size HBG crushed stone aggregate and fine aggregate conforming to table 1000-2 of MoRT&H including cost, conveyance of all materials to site and labour charges, centering, machine mixing, lay |
| 6 | Construction of box drain from 80ft road to H.No.1 9 1286 A 2 1 at Sri Rama colony, Hanamkonda in W. | As per SSR | 34.35 | Cum | 382.47 | 13137.84 |
| BLD-CSTN-2-8 (16) : Filling with Stone dust in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310) |
| 7 | Construction of box drain from 80ft road to H.No.1 9 1286 A 2 1 at Sri Rama colony, Hanamkonda in W. | As per SSR | 227.54 | Cum | 80.36 | 18285.11 |
| Carting of the Exavated earth upto a lead upto 4-5 km beyond the initial lead of 1 Km from site including loadingand unloading as per the engineer in charge. |
| 8 | Construction of box drain from 80ft road to H.No.1 9 1286 A 2 1 at Sri Rama colony, Hanamkonda in W. | As per SSR | 284.43 | Cum | 219.70 | 62489.27 |
| Earth work excavation in Ordinary Soil by Manual Means-Upto 3 m depth for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring, sheeting, planking, strutting, etc. complete for finished item of work Manual |