| 1 | KICHEN SHED AT NEW RAMANUJAKUTAM | N.C | 0 | Each | 96000.00 | 192000.00 |
| 3 Burner Bulk Cooking range size 72\\ x 30\\ x 24\\ |
| 2 | KICHEN SHED AT NEW RAMANUJAKUTAM | N.C | 0 | Each | 80000.00 | 80000.00 |
| 2 Burner Bulk Cooking range size 60\\ x 30\\ x 24\\ |
| 3 | KICHEN SHED AT NEW RAMANUJAKUTAM | N.C | 0 | Each | 70000.00 | 140000.00 |
| Rice vessel 50 Kgs |
| 4 | KICHEN SHED AT NEW RAMANUJAKUTAM | N.C | 0 | Each | 135000.00 | 135000.00 |
| Mixing of Pulihora Platform size 72\\ x 60\\ x 24\\ |
| 5 | KICHEN SHED AT NEW RAMANUJAKUTAM | N.C | 0 | Each | 135000.00 | 135000.00 |
| Mixing of Laddu Platform size 72\\ x 60\\ x 24\\ |
| 6 | KICHEN SHED AT NEW RAMANUJAKUTAM | N.C | 0 | Each | 35000.00 | 70000.00 |
| S.S. Tables 48\\ x 48\\ x 36\\ |
| 7 | KICHEN SHED AT NEW RAMANUJAKUTAM | N.C | 0 | Each | 425000.00 | 425000.00 |
| IBR Steam Boiler 300Ltr with S.S. Insulation & Fittings |
| 8 | KICHEN SHED AT NEW RAMANUJAKUTAM | N.C | 0 | 1Ft | 1250.00 | 62500.00 |
| 1\\ S.S. Steam pipe line & Fittings (Including Accessories) |
| 9 | KICHEN SHED AT NEW RAMANUJAKUTAM | N.C | 0 | Each | 0 | 75000.00 |
| Installation Charges |
| 10 | KICHEN SHED AT NEW RAMANUJAKUTAM | N.C | 0 | 1Ft | 850.00 | 425000.00 |
| 1 1/2\\ SS 304 Scheduled 40 seamless gas pipe line |
| 11 | KICHEN SHED AT NEW RAMANUJAKUTAM | N.C | 0 | 1Ft | 650.00 | 65000.00 |
| 1\\ SS 304 Scheduled 40 seamless gas pipe line |
| 12 | KICHEN SHED AT NEW RAMANUJAKUTAM | N.C | 0 | Each | 8500.00 | 17000.00 |
| 1 1/2\\ L&T Main line Valve |
| 13 | KICHEN SHED AT NEW RAMANUJAKUTAM | N.C | 0 | Each | 320.00 | 2560.00 |
| NCV (Uinted) |
| 14 | KICHEN SHED AT NEW RAMANUJAKUTAM | N.C | 0 | Each | 400.00 | 2000.00 |
| 5Ft Burner Flexible pipe (Suraksha) |
| 15 | KICHEN SHED AT NEW RAMANUJAKUTAM | N.C | 0 | Each | 1050.00 | 3150.00 |
| Pressure Gauge 0-4Kgs (Guru) |
| 16 | KICHEN SHED AT NEW RAMANUJAKUTAM | N.C | 0 | Each | 7460.00 | 14920.00 |
| Pressure Control Regulator (Vanaz) |
| 17 | KICHEN SHED AT NEW RAMANUJAKUTAM | N.C | 0 | Each | 7500.00 | 15000.00 |
| Gas Fillters 1\\ (Vanaz) |
| 18 | KICHEN SHED AT NEW RAMANUJAKUTAM | N.C | 0 | Each | 6150.00 | 24600.00 |
| 1\\ L&T valves in kitchen |
| 19 | KICHEN SHED AT NEW RAMANUJAKUTAM | N.C | 0 | Each | 0 | 120000.00 |
| Installation |
| 20 | KICHEN SHED AT NEW RAMANUJAKUTAM | N.C | 0 | 1Rft | 8500.00 | 289000.00 |
| S.S. Hoo & Filters |
| 21 | KICHEN SHED AT NEW RAMANUJAKUTAM | N.C | 0 | 1Rft | 2400.00 | 144000.00 |
| S.S. Ducting |
| 22 | KICHEN SHED AT NEW RAMANUJAKUTAM | N.C | 0 | Each | 275000.00 | 275000.00 |
| Blower 10HP |
| 23 | KICHEN SHED AT NEW RAMANUJAKUTAM | N.C | 0 | Each | 2800.00 | 42000.00 |
| CVP Damper |
| 24 | KICHEN SHED AT NEW RAMANUJAKUTAM | N.C | 0 | Each | 7500.00 | 7500.00 |
| L&T Stator |
| 25 | KICHEN SHED AT NEW RAMANUJAKUTAM | N.C | 0 | Each | 0 | 85000.00 |
| Installation Charges |
| 26 | KICHEN SHED AT NEW RAMANUJAKUTAM | N.C | 0 | Each | 0 | 178770.00 |
| Cables & Electrical work etc,. |